Proposed Tech Specs Re Allowable out-of-svc for LPCI Sys
ML20101F386
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 06/15/1992
From:
Public Service Enterprise Group
To:
Shared Package
ML20101F384 List:
References
NUDOCS 9206240434
Download: ML20101F386 (3)


Text

l TEcliNICAL SPECIFICATION PAGES WLTH PEN AND INK CHANGES The following Technical Specification for Facility Operating License No. NPF-57 are effected by this license amendment request:

Technical Snecificatl2D Pace 3.5.1, Action f 3/4 5-3 9206240434 920615 PDR ADOCK 05000354 P PL':1

. 1

\

EMERGENCY CORE COOLING SYSTEMS LIMITING CONDITION FOR OPERATION (Continued)

ACTION: (Continued)

1. With the HPCI system inoperable, restore the HPCI system to OPERABLE status within 14 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and reduce reactor steam dome pressure to 5 200 psig within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
d. For the ADS:
1. With one of the above required ADS valves inoperable, provided the HPCI system, the core spray system and the LPCI system are OPERABLE, restore the inoperable ADS valve to OPERABLE status within 14 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and reduce reactor steam dome pressure to 1100 psig within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
2. With two or more r he above required ADS valves inoperable, be in at least H01. c)TDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and reduce reactor steam iome pressure to 5 100 psig within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
e. With a CSS and/or LPCI header AP instrumentation channel iroperable.

restore the inoperable channel to OPERABLE status within ,' days or

',(/( determine the ECCS header aP locally at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />; 4 otherwise, declare the associated ECCS subsystem inoperable,

  • ' b p-b$'

f.

/

s :p y WithaLPCIand/p[CCSdischargeJine"keepfilled"jdlarm instru-

/# -

9/ mentation inopp able, perform Sdveillance Requirphent 4.5.1.a. lf .

o

, p. In the event an ECCS system is actuated and injects water into the l

k

/ e Reactor Coolant System, a Special Report shall be prepared and sub-mitted to the Commission pursuant to Specification 6.9.2 within

, 90 days describing the circumstances of the actuation and the total

, accumulateo actuation cycles to date. The current value of the usage factor for each affected safety injection nozzle shall be provided in this Special Report whenever its value exceeds 0.70.

I

/%

4

-f

> WJ A

's;e + ;-

k / r i

J 'T HOPE CREEK 3/4 5-3

INSERT FOR TXCHNICAL SPECIFICATION PAGE 3/4 5-3:

f. The discharge line " keep filled" alarm instrumentation associated with a LPCI and/or CCS subsystem (s) may be in an inoperable status for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for required surveillance testing

NOTE FOR TECHNIQAL HPECIFICATION PAGE 3/4 5-31

  • This includes testing of the " Reactor Coolant System Interface Valves Leakage: Pressure Monitors" associated with LPCI and CSS in accordance with Surveillance 4.4.3.2.3.

3

.. . .