ML20078Q157
From kanterella
ML20078Q157 | |
Person / Time | |
---|---|
Site: | Byron, Braidwood |
Issue date: | 02/13/1995 |
From: | WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
To: | |
Shared Package | |
ML19325F436 | List: |
References | |
SG-95-02-007, SG-95-2-7, WCAP-14047, WCAP-14047-R02, WCAP-14047-R2, NUDOCS 9502210114 | |
Download: ML20078Q157 (56) | |
Category:REPORTS-TOPICAL (BY MANUFACTURERS-VENDORS ETC)
MONTHYEARML20207H8071999-06-30030 June 1999
[Table view]Rev 0 to WCAP-15178, Byron Unit 2 Heatup & Cooldowm Limit Curves for Normal Operations ML20207H7941999-06-30030 June 1999 Rev 0 to WCAP-15180, Commonwealth Edison Co Byron,Unit 2 Surveillance Program Credibility Evaluation ML20207H7851999-06-30030 June 1999 Rev 0 to WCAP-15183, Commonwealth Edison Co Byron,Unit 1 Surveillance Program Credibility Evaluation ML20207H7771999-06-30030 June 1999 Rev 0 to WCAP-15177, Evaluation of Pressurized Thermal Shock for Byron,Unit 2 ML20207H8011998-11-30030 November 1998 Rev 0 to WCAP-15124, Byron Unit 1 Heatup & Cooldown Limit Curves for Normal Operation ML20207H7731998-11-30030 November 1998 Rev 0 to WCAP-15125, Evaluation of Pressurized Thermal Shock for Byron,Unit 1 ML20202F8391997-11-30030 November 1997 Non-proprietary,Rev 2 to WCAP-14824, Byron Unit 1 Heatup & Cooldown Limit Curves for Normal Operation & Surveillance Weld Metal Integration for Byron & Braidwood ML20199E8281997-10-31031 October 1997 Heatup & Cooldown Limit Curves for Normal Operation ML20199E8531997-10-31031 October 1997 Heatup & Cooldown Limit Curves for Normal Operation ML20141A4681997-04-30030 April 1997 Rev 1 to Byron Unit 1 Heatup & Cooldown Limit Curves for Normal Operation & Surveillance Weld Metal Integration for Byron & Braidwood ML20211D9541996-09-30030 September 1996 Non-proprietary Probabilistic Analysis of Reduction in Turbine Valve in Test Frequency for Nuclear Plants W/ Westinghouse BB-296 Turbine W/Steam Chests ML20108D2461996-04-30030 April 1996 Nonproprietary Technical Justificaton for Eliminating Large Primary Loop Pipe Rupture as Structural Design Basis for Byron & Braidwood Units 1 & 2 Nuclear Power Plants ML20096F2991996-01-17017 January 1996 Non-proprietary Rev 0 to CEN-627-NP, Verification of Installation Process & Operating Performance of Abb Ceno SG Tube Sleeve for Use at Comm Ed Byron & Braidwood Units 1 & 2 ML20093G9651995-10-31031 October 1995 Nonproprietary Addendum 1 to Technical Support for Alternate Plugging Criteria W/Tube Expansion at TSP Intersections for Braidwood-1 & Byron-1 Model D4 SGs Addendum 1 TSP Analysis Using 'RELAP5' Loads ML20086T3501995-04-30030 April 1995 Nonproprietary Slide Presentation Matl NRC Meeting of 950223 Alternate Plugging Criteria W/Tube Expansion for Braidwood Unit 1 & Byron Unit 1 Model D4 Sgs ML20087D4601995-03-31031 March 1995 Nonproprietary Errata to Rev 3 to WCAP-14047, Braidwood Unit 1 Technical Support for Cycle 5 Steam Generator Interim Plugging Criteria, Correcting Page 4-139 Figure Title ML20085K7101995-03-31031 March 1995 Non-proprietary Rev 3 to Rept WCAP-14047, Braidwood Unit 1 Technical Support for Cycle 5 SG Interim Plugging Criteria ML20092A7611995-03-31031 March 1995 Evaluation of PTS for Braidwood Unit 1 ML20092A7541995-03-31031 March 1995 Evaluation of PTS for Braidwood Unit 2 ML20078Q1571995-02-13013 February 1995 Non-proprietary Rev 2 to WCAP-14047, Braidwood Unit 1 Technical Support for Cycle 5 SG Interim Plugging Criteria ML20080H3571995-02-13013 February 1995 Technical Support for Alternate Plugging Criteria W/Tube Expansion at Tube Suppport Plate Intersections for Braidwood-1 & Byron-1 Model D4 ST for Feb 1995 ML20078J5831994-11-30030 November 1994 Nonproprietary Braidwood Unit 1 & Byron Unit 1 Model D4 SG Limited Tube Support Plate Displacement Analysis in Support of Interim Plugging Criteria ML20072Q5981994-08-31031 August 1994 Technical Support for Cycle 5 Steam Generator Interim Plugging Criteria ML20073B3461994-06-0101 June 1994 Nonproprietary Topical Rept on Methodology,Verification & Applications of Computer Progra,Gappipe ML20069P6001994-05-31031 May 1994 Technical Support for Cycle 5 Steam Generator Interim Plugging Criteria ML20069B4761994-03-31031 March 1994 Non-proprietary Rev 0 to BAW-10196, W-D4 F* Qualification Rept ML20064N3211994-03-31031 March 1994 Commonwealth Edison Co Byron & Braidwood Unit 1 & 2 Increased Sgtp/Reduced Tdf/Pmtc Analysis Program Engineering Licensing Rept ML20056D8951993-05-31031 May 1993 Nonproprietary Rev 1 to WCAP-13699, Laser Welded Sleeves for 3/4 Inch Diameter Tube Feedring Type & Westinghouse Preheater Sgs ML20141M4511992-08-31031 August 1992 Nonproprietary Fracture Mechanics Evaluation,Byron Braidwood Units 1 & 2,Residual HX Tube Side Inlet & Outlet Nozzles ML20077A3141992-08-31031 August 1992 Nonproprietary Fracture Mechanics Evaluation Byron & Braidwood Units 1 & 2 Residual HX Tube Side Inlet & Outlet Nozzles ML20090M8391992-02-29029 February 1992 Nonproprietary Evaluation of Byron & Braidwood Units 1 & 2 Auxiliary Spray Lines Per NRC Bulletin 88-008 ML20086B5481991-11-30030 November 1991 Fracture Mechanics Evaluation,Braidwood,Unit 2 Residual Heat Exchanger Tube Side Inlet & Outlet Nozzles ML20079P7301991-10-31031 October 1991 Nonproprietary Byron Unit 1 & Braidwood Unit 1 Evaluation for Tube Vibration Induced Fatigue ML20070W0371991-03-31031 March 1991 Analysis of Capsule U from Commonwealth Edison Co Braidwood Unit 2 Reactor Vessel Radiation Surveillance Program ML20058C0021990-08-31031 August 1990 Analysis of Capsule U from Comm Ed Braidwood Unit 1 Reactor Vessel Radiation Surveillance Program ML20044A9641990-07-31031 July 1990 Rev 0 to Comm Ed Topical Rept on Benchmark of PWR Nuclear Design Methods Using PHOENIX-P & Advanced Nodal Code (Anc) Computer Codes. ML20011E2471989-10-31031 October 1989 Analysis of Capsule U from Comm Ed Byron Unit 2 Reactor Vessel Radiation Surveillance Program. ML20090M8341989-09-30030 September 1989 Nonproprietary Evaluation of Thermal Stratification for Byron & Braidwood Units 1 & 2 RHR Lines ML20129B5411989-06-30030 June 1989 Reduction in Minimum Rhrs Flowrate During Mid-Loop Operation for Byron & Braidwood Power Plants Units 1 & 2 ML20072H9511988-12-31031 December 1988 Joint Westinghouse Owners Group/Westinghouse Program:Atws Rule Administration Process ML20198J5701988-11-30030 November 1988 Non-proprietary WCAP-12046, Handbook on Flaw Evaluation for Zion,Byron & Braidwood,Units 1 & 2,Reactor Vessels ML20154J9831988-04-30030 April 1988 RCS Flow Anomaly Investigation Rept ML20237C4091987-11-30030 November 1987 Nonproprietary Rev 2 to Byron/Braidwood T-Hot Reduction Final Licensing Rept ML20151U1271987-11-30030 November 1987 Analysis of Capsule U from Comm Ed,Byron Unit 1 Reactor Vessel Radiation Surveillance Program ML20207H9761986-11-30030 November 1986 Nonproprietary Resistance Temp Detector Bypass Elimination Licensing Rept for Byron 1 & 2 & Braidwood 1 & 2 ML20205Q3981986-03-31031 March 1986 Background & Technical Basis for Hand Book on Flaw Evaluation for Byron Units 1 & 2 Steam Generators & Pressurizers ML20205Q4161986-03-31031 March 1986 Handbook on Flaw Evaluation for Byron Units 1 & 2 Steam Generators & Pressurizers ML20097J2521984-05-31031 May 1984 Technical Bases for Eliminating Large Primary Loop Pipe Rupture as Structural Design Basis for Byron Units 1 & 2 & Braidwood Units 1 & 2 ML20084H1331984-04-30030 April 1984 Vols 1 & 2 to Byron Generating Station Limiting Conditions for Operation Relaxation Program ML20080B4951983-07-29029 July 1983 Nonproprietary Version of Independent Evaluation of Proposed Mods to Westinghouse D4,D5 & E Steam Generators 1999-06-30 Category:TEXT-SAFETY REPORT MONTHYEARML20217G9961999-10-14014 October 1999
[Table view]SER Accepting First 10-year Interval Inservice Insp Requests for Relief for Plant,Units 1 & BW990066, Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With ML20217H5221999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Byron Station, Units 1 & 2.With ML20217P6351999-09-29029 September 1999 Non-proprietary Rev 6 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212A7441999-09-10010 September 1999 Safety Evaluation Concluding That Alternatives Contained in Relief Request 12R-07 Provide Acceptable Level of Quality & Safety ML20212B9261999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Byron Station,Units 1 & 2.With BW990056, Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With ML20210R6421999-08-13013 August 1999 ISI Outage Rept for A2R07 ML20210U8111999-08-0404 August 1999 SER Granting Licensee Relief Requests VR-1,VR-3 & Portion of VR-2 Pursuant to 10CFR50.55a(a)(3)(ii).Relief Request VR-4 Does Not Require Explicit NRC Approval Because Relief Applies to Valves Not Required by 10CFR50.55a BW990048, Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With ML20210R3431999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Byron Station, Units 1 & 2.With ML20210K9861999-07-30030 July 1999 Safety Evaluation Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20210E2251999-07-21021 July 1999 B1R09 ISI Summary Rept Spring 1999 Outage, 980309-990424 M990002, Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function1999-07-12012 July 1999 Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function ML20216D3841999-07-12012 July 1999 Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function ML20209G1751999-07-0808 July 1999 SG Eddy Current Insp Rept,Cycle 9 Refueling Outage (B1R09) BW990038, Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With ML20207H7771999-06-30030 June 1999 Rev 0 to WCAP-15177, Evaluation of Pressurized Thermal Shock for Byron,Unit 2 ML20207H7851999-06-30030 June 1999 Rev 0 to WCAP-15183, Commonwealth Edison Co Byron,Unit 1 Surveillance Program Credibility Evaluation ML20207H7941999-06-30030 June 1999 Rev 0 to WCAP-15180, Commonwealth Edison Co Byron,Unit 2 Surveillance Program Credibility Evaluation ML20207H8071999-06-30030 June 1999 Rev 0 to WCAP-15178, Byron Unit 2 Heatup & Cooldowm Limit Curves for Normal Operations ML20209H3711999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Byron Station, Units 1 & 2.With ML20207H7561999-06-28028 June 1999 Pressure Temp Limits Rept (Ptlr) ML20207H7621999-06-28028 June 1999 Pressure Temp Limits Rept (Ptlr) BW990029, Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With ML20209H7481999-05-31031 May 1999 Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2 ML20195J8001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Byron Station,Units 1 & 2.With ML20207B6481999-05-25025 May 1999 SER Accepting Revised SGTR Analysis for Byron & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations ML20206R6991999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Byron Station Units 1 & 2.With BW990021, Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With ML20195C7961999-04-28028 April 1999 Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A) M980023, Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A)1999-04-28028 April 1999 Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A) BW990016, Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With ML20205P7001999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Byron Station,Units 1 & 2.With ML20205B5091999-03-26026 March 1999 SER Accepting Relief Requests 12R-24,Rev 0 & 12R-34,Rev 0, Related to Second 10-year Interval Inservice Insp for Byron Station,Units 1 & 2 ML20205C5101999-03-21021 March 1999 Revised Safety Evaluation Supporting Improved TS Amends Issued by NRC on 981222 to FOLs NPF-37,NPF-66,NPF-72 & NPF-77.Revised Pages Include Editorial Corrections ML20204G3831999-03-19019 March 1999 Safety Evaluation Accepting Second 10-yr Interval ISI Request for Relief 12R-11 ML20206A8831999-03-17017 March 1999 Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function M990004, Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function1999-03-17017 March 1999 Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function ML20196A0721999-03-16016 March 1999 Cycle 8 COLR in ITS Format & W(Z) Function ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results ML20207J4371999-03-0808 March 1999 ISI Outage Rept for A1R07 ML20204H9941999-03-0303 March 1999 Non-proprietary Rev 4 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations BW990010, Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With ML20204C7671999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Byron Station,Units 1 & 2.With ML20206U9011999-02-15015 February 1999 COLR for Braidwood Unit 2 Cycle 7. Page 1 0f 13 of Incoming Submittal Was Not Included BW990004, Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With1999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With ML20199G8271998-12-31031 December 1998 Rev 1 Comm Ed Byron Nuclear Power Station,Unit 1 Cycle 9 Startup Rept 1999-09-30 |
Text