ML20084P664

From kanterella
Revision as of 12:58, 17 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Chapter 1 of RESAR-SP/90 Westinghouse Advanced PWR Module 2, Regulatory Conformance, Introduction
ML20084P664
Person / Time
Site: 05000601
Issue date: 11/30/1983
From:
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To:
Shared Package
ML19269A120 List:
References
NUDOCS 8405180314
Download: ML20084P664 (2)


Text

.

1.0 INTR 00tJCTION Westinghouse is in the process of developing an Advanced. Pressurized Water Reactor (MAPWR) design for domestic as well as international application in the late 1980's-1990's time f rame. This total plant design is being developed through a major cooperative effort with a .lapanese vendor and is directed toward the est'ablishment of final design detail and completion of an extensive O t s* arasra av ta "4 a' as-Westinghouse believes that ensuring compliance with the MAPWR design with current licensing requirements is best satisfied through consideration of regulatory requirements and guidance as an integral part of the initial design .

process. Westinghouse also has a unique opportunity to optimally address new and pontential future licensing requirements in the MAPWR design. Westing-house plans to take full advantage of this design optimization opportunity with the goal of achieving assurance that the fundamental MAPWR design will remain relatively unchanged as a result of future regulatory changes.

This report presents the bases for the MAPWR design in response to licensing requirements consistent with the Proposed Commission Po'licy Statement on Severe Accidents and Related Views on Nuclear Reactor Regulation (48FR16014, April 13,1983). For the purpose of this report, licensing requirements have been categorized as follows:

o Historical requirements o Recent new or revised requirements o Potential future requirements The major sections of this report address the latter two categories of licen-sing requirements (i.e., recent new or revised requirements and potential d scr'a*ia" o' *" a' a"ed <="rs e' ct' "

O

'"t#r rea" ire "t') '"ciud'"9 for addressing the requirements in the MAPWR design.

B405180314 831130 PDR ADOCK 05000601 K PDR

_. WAPWR-RC _.

1,0-1 NOVEMBER, 1983

9 WESTINGHOUSE PROPRIETARY CLASS 2 The sources of licensing requirements considered by Westinghouse as comprising these two categories are discussed in Section 2.0.

h The appendices to this report, which present design bases for specific HAPWR

! structures, systems, components, features, etc., address all three categories of licensing requirements and are intended to be used directly in the licen-sing process for the MAPWR design.

O O

1 O

l HAPWR-RC 1.0-2 NOVEMBER, 1983