ML20151R636

From kanterella
Jump to navigation Jump to search
Nonproprietary Amend 2 to RESAR-SP/90 Pda Module 12, Waste Mgt
ML20151R636
Person / Time
Site: 05000601
Issue date: 07/31/1988
From:
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To:
Shared Package
ML19292J204 List:
References
RESAR-SP-90-02, RESAR-SP-90-2, RESAR-SP-90-A02, RESAR-SP-90-A2, NUDOCS 8808120239
Download: ML20151R636 (4)


Text

.. _ _. _ __ _ _ _ __.. _.._._ _ _ _ _-

t

!4 AMEN 0 MENT 2 TO RESAR-SP/90 PDA MODULE 12 l

WASTE KWAGEMENT 4

!!9 1

1 1

i l@

\\

i i

1

)

i!O j

l I

i O

WEC P.O. Box 355 l

Pittsburgh, PA 15230 4

WAPWR-WM AMENDMENT 2 j

B009e:1d JULY, 1988 i

8808120239 800727 j

DR ADOCK 05000601 PDR L

1.

AMENDMENT 2 TO RESAR-SP/90 PDA MODULE 12 WASTE MANAGEMENT INSTRUCTION SHEET l

Replace current page vi with revised page vi.

(This modification only corrects error in original table of contents.)

1 Place page 430-1 (Question /Respense) after Amendment 1,

in the Questions / Answers section to Module 12.

O 1

1 I

i O i

O i!O 1

]

WAPWR-WM AMENDMENT 2 l

BD09e:1d JULY,, 1988 1-....

TABLE OF CONTENTS (Continued)

Reference SAR Section Section Title P_aSe Status 11.3.3.2 Estimated Releases 11.3-17 I

11.3.3.3 Release Points for Determination of Dilution Factors 11.3-18 1

11.3.3.4 Effluent Concentration and Dilution factors 11.3-18 I

11.3.3.5 Estimated Doses from Atmospheric Releases 11.3-18 I

11.4 SOLID WASTE PROCESSING SYSTEM 11.4-1 III 11.4.1 Design Bases 11.4-1 11.5 PROCESS AND EFFLUENT RADIOLOGICAL MONITORING j

AND SAMPLING SYSTEMS 11.5-1 I

11.5.1 Design Bases 11.5-1 I

l 11.5.2

System Description

11.5-2 1

11.5.2.1 Digital Radiation Monitoring System 11.5-2 1

11.5.2.2 Monitor Description 11.5-3 1

11.5.2.3 Monitor Functions 11.5-4 I

11.5.2.4 Alarm Setpoints 11.5-15 1

11.5.2.6 Inservice Inspection, Calibration, and Maintenance 11.5-16 1

11.5.3 Effluent Monitoring and Sampling 11.5-16 I

11.5.3.1 Plant Sampling System 11.5-16 I

11.5.3.2 Sampling Requirements for Process and Effluent Radiation Monitoring System (PERMS) 11.5-17 I

2 11.5.4 Process Monitoring and Sampling 11.5-18 I

11.5.5 Post-Accident Radiation Monitoring (PAMS) 11.5-18 I

12.0 EADIATION FROTECTION 12.0-1 NA 13.0 CONDUCT OF OPERATIONS 13.0-1 NA 14.0 INITIAL TEST PROGRAM 14.0-1 NA 15.0 ACCIDENT ANALYSES 15.0-1 11 16.0 TECHNICAL SPECIFICATIONS 16.0-1 NA O

WAPWR-WM vi AMENDMENT 2 7993e:1d JULY, 1988

=

REQUEST FOR ADDITIONAL INFORMATION WESTINGHOUSE ADVANCED PRESSURIZED WATER REACTOR (RESAR SP-90)

DOCKET NO. 50-601 The following Question / Response was formally transmitted in Addendum 4 to RESAR-SP/90 PDA in Westinghouse letter NS-NRC-88-3341, dated May 13, 1988.

430.18 Provide a discussion which indicates how THI Action Plan Item II.F.1, "Additional Accident Monitoring Instrumentation,"

O requirements have been met.

RESPONSE

The radiation and airborne radioactivity monitors for accident conditions, required to meet TMI action plan item II.F.1, are included in Subsection 11.5.5 - Post Accident Radiation Monitor-ing (PAMS) of RESAR-SP/90 PDA Module 12, "Waste Management," and Subsection 12.3.4 - Area Radiation and Airborne Radioactivity Monitoring Instrumentation of RESAR-SP/90 PDA Module 11, "Radiation Protection."

O O

i O

WAPWR-WM 430-1 AMENDMENT 2 5009e:1d JULY, 1988

.. - -.--- - - -