ML20085G947
| ML20085G947 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 10/18/1974 |
| From: | Eric Thomas TENNESSEE VALLEY AUTHORITY |
| To: | Case E US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML20085G949 | List: |
| References | |
| NUDOCS 8308290533 | |
| Download: ML20085G947 (2) | |
Text
- . _ . -_ . .. . -. . _ . _ . _ ,
, TENNESSEE VALL ,
CHATTANOOCpqis'EENNESSEEAUTHOI:1!TY t~'
- ;I t 4
. O '* 37401 d 1 /m l
October 18, 1974
~
77 {% h[e]l g$hg' %M Mr. Edson G. Case <s k . .k # ^( '/ , ,
Acting Director of Licensing * \
Office of Regulation T *^@ #
/
h]Yfd
. , U.S. Atomic Energy Co=nission Washington, DC 20545
Dear Mr. Case:
TENNESSEE VALLEY AUTHORITY - BR0'dNS FERRY ITUCLEAR PLANT UNIT 1 -
i DOCKET NO. 50-259 - FACILITY OPERATING LICENSE DPR ABNORMAL OCCURRENCEREPORTBFAO-50-259/7454W i
, The enclosed report is to provide details concerning FCV-1-51 main steamline "D" inboard isolation valve which failed to close within 3 to 5 seconds as required by the technical specifications and is submitted in accordance with Appendix A to Regulatory Guide 1.16, i Revision 1, October 1973. This event occurred on Browns Ferry Nucicar Plant unit 1 on October 10, 1974 Very truly yours,.
TENNESSEE VALLEY AUTHORITY
~
/
'c'N 4 o ..as bsE.}
~
1 rector of Power Production.
, Enclosure CC (Enclosure): .
Mr. Norman C. Ibseley, Director Region II Regulatory Operations Office, USAEC
- 230 Peachtree Street, NW., Suite 818 4 Atlanta, Georgia 30303 '
< +
8308290533 741018 PDR ADOCK 05000259
] S PDR: Di
- 10S07 poc7.A/
- . - copy SENT REGIONE -T u_
l a .
y
. - ,u
__ . _ _ , .._,m . . _ = ~ _m - - ' - - - -- -
.._ A j
, , s a
. k ) I G x_,/,
. ABNORMAL OCCURRENCE REPORT
- Report No.: BFAO-50-259/7454W Report Date: October 18, 1974 Occurrence Date: October 10, 1974 Facility: Browns Ferry Huclear Plant unit 1 Identification of Occurrence FCV-1-51 main steamline "D" inboard isolation valve failed to close within 3 to 5 seconds as required by the technical specifications.
Conditions Prior to Occurrence The reactor was at approxi=ately 70-percent power.
Descriution of Occurrence While conductire a surveillance test, FCV-1-51 closed in 2.7 seconds.
Designation of Arcarent Cause of Occurrence The reactor has been operated continuously since the occurrence; therefore, no drywell entry has been =ade to deternine the cause.
Analysis of Occurrence The inboard isolation valve FCV-1-51 was closed and rc=ained closed until a temporary technical specification change was obtained. There were no adverse effects on the health or safety of the public as a result of this occurrence.
Corrective Action A dryvell entry vill be made at the earliest opportunity to detemine and correct the cause of the problem. A tcroorar/' change of the technical specifications was c.btained to permit operation with closure time as low as 2 seconds providing the average of the fastest valve of each pair in all four re.in steamlines is greater than 3.0 seconds.
Failure Data See Abnomal Occurrence Reports: BFAO-50-260/7412W, unit 2 BFAO-7438W, unit 1 BFAO-7412W, unit 1 BFAO-742W, unit 1 Valve Data 26" main steam isolation valve Manufacturer: Atwood and Morrill Company, Salem, Massachusetts Valve drawing No.: 20851-H, Sheets 1 and 2
(