TENNESSEE VALL CHATTANOOCpqis'EENNESSEEAUTHOI:1!TY t~'
- I t 4
O '*
37401 d 1 /m l
77
{%
h[e]l
~
October 18, 1974
- g$hg'
%M Mr. Edson G. Case k..k #
^( '/
<s
- \\ *^@
h]Yfd Acting Director of Licensing
/
T Office of Regulation U.S. Atomic Energy Co=nission Washington, DC 20545
Dear Mr. Case:
TENNESSEE VALLEY AUTHORITY - BR0'dNS FERRY ITUCLEAR PLANT UNIT 1 -
i DOCKET NO. 50-259 - FACILITY OPERATING LICENSE DPR ABNORMAL OCCURRENCEREPORTBFAO-50-259/7454W i
The enclosed report is to provide details concerning FCV-1-51 main steamline "D" inboard isolation valve which failed to close within 3 to 5 seconds as required by the technical specifications and is submitted in accordance with Appendix A to Regulatory Guide 1.16, Revision 1, October 1973. This event occurred on Browns Ferry Nucicar i
Plant unit 1 on October 10, 1974 Very truly yours,.
TENNESSEE VALLEY AUTHORITY
/
'c'N
~
~
bsE.}
o..as 4
1 rector of Power Production.
Enclosure CC (Enclosure):
Mr. Norman C. Ibseley, Director Region II Regulatory Operations Office, USAEC 230 Peachtree Street, NW., Suite 818 Atlanta, Georgia 30303 4
+
8308290533 741018 PDR ADOCK 05000259 Di
]
S PDR:
- c7.A/
10S07 po copy SENT REGIONE
-T u_
y a
,u
.._ A j
.._,m
.. _ = ~
_m
, s a
k
)
I G
x_,/,
ABNORMAL OCCURRENCE REPORT
- Report No.: BFAO-50-259/7454W Report Date: October 18, 1974 Occurrence Date: October 10, 1974 Facility: Browns Ferry Huclear Plant unit 1 Identification of Occurrence FCV-1-51 main steamline "D" inboard isolation valve failed to close within 3 to 5 seconds as required by the technical specifications.
Conditions Prior to Occurrence The reactor was at approxi=ately 70-percent power.
Descriution of Occurrence While conductire a surveillance test, FCV-1-51 closed in 2.7 seconds.
Designation of Arcarent Cause of Occurrence The reactor has been operated continuously since the occurrence; therefore, no drywell entry has been =ade to deternine the cause.
Analysis of Occurrence The inboard isolation valve FCV-1-51 was closed and rc=ained closed until a temporary technical specification change was obtained. There were no adverse effects on the health or safety of the public as a result of this occurrence.
Corrective Action A dryvell entry vill be made at the earliest opportunity to detemine and correct the cause of the problem. A tcroorar/' change of the technical specifications was c.btained to permit operation with closure time as low as 2 seconds providing the average of the fastest valve of each pair in all four re.in steamlines is greater than 3.0 seconds.
Failure Data See Abnomal Occurrence Reports: BFAO-50-260/7412W, unit 2 BFAO-7438W, unit 1 BFAO-7412W, unit 1 BFAO-742W, unit 1 Valve Data 26" main steam isolation valve Manufacturer: Atwood and Morrill Company, Salem, Massachusetts Valve drawing No.: 20851-H, Sheets 1 and 2
(