7 w.: .x
. O O e PHILADELPHIA ELECTRIC COMPANY . \
2301 MARKET STREET
?g :\p %
_7
/
aJ ]
PHILADELPHIA PA.19101 AUG 11974" A k
ll. s t.t (21518414o00 .[ _ [
' > /' s <
_, . ;3 N
. >\ pp July 29, 1974 Mr. A. Giambuss Deputy Director of Reactor Projects 50-277 United States Atomic Energy Cormiission Directorate of Licensing Washington, DC 20545
Dear Mr. Giambusso:
Subject:
Abnormal Occurrence The following occurrence was reported to Mr. Donald Caphton, A.E.C. Region I Regulatory Operations Office on July 19, 1974. Writ- ,
' ten notification was made to Mr. James P. O'Reilly, Region I Regulatory Guc aiivn= Giii< e on .soiy i s, i9fh. in arcordaaca '." t h Sectien 6.7.2.P.
of the Technical Specifications, Appendix A of DPR-44 for Unit 2 Peach Bottom Atomic Power Station, the following report is being ;ubmitted to the Directorate of Licensing as an Abr,armal Occurrence.
Reference:
License Number DPR-44, Amendment Number 1
' Technical Specification Table 3 5.B Report No.: 50-277-74-38 Report Date: July 29, 1974 Occurrence Date:
~
July 19, 19/4 Facility: Peach Bottom Atomic Power Station R.D. 1, Delta, Pennsylvania 17314 Identificatien of Occurrenc.e:
Setpoint of the Core Spray Sparger to Reactor Vessel differ-ential pressure switch, dPIS-2-14-438, found to be less conservative ;
than allowed by the Technical Specifications.
a ' ,
_ Conditions Prior to Occurrence: !; rf ./
l a ;
r i, > \ , ;
8 The reactor was at 100% power. .l ,
- s ;'
lL ' t ,g 8401270073'740729' / (.
PDR ADOCK 05700277 > n.
S PDR g L"d b- -
g sNT ntkliWL 8 -
t l
~
r1 Mr. A. Giambuss
.. ' . J, July 29, 1974 '
Page 2.
l t
j Description of Occurrence:
During a routine instrument surveillance test the setpoint of dPIS-2-14-438 was found to have drifted outside the Technical Specification limits of 5 + 1 5 psid. The switch was found to trip at 6.7 psid.
Designation of Apparent Cause of Occurrence:
The cause of this setpoint failure is attributed to slight setpoint drift.
Analysis of Occurrence:
Due to the slight magnitude of the setpoint deviation, this occurrence has minimal safety implications.
Corrective Action:
The switch was immediately recalibrated and returned to service.
Very truly yours, 3
J)V ' uw
/ M . J,. C'o'o ne'y
/
i Ass,' t Gen' 1 Superin'tendent.
4 Generation Division ~
cc: Mr. J. P. O'Reilly Director,. Region 1 linited States Atomic Energy Commission K ng of P us a, PA 19406 i