MONTHYEARML20196F6101998-12-0101 December 1998 Summary of 981029 Meeting with Northern States Power, Wisconsin Electric,Wisconsin Public Service & Alliant-IES in Rockville,Md Re Various Aspects of Potential Regulatory Issues Associated with Ongoing Cooperative Efforts ML20236L1061998-06-29029 June 1998 Summary of 980204 Meeting W/Util in Rockville,Md Re Methodologies Being Implemented by Ies Utilities,Inc to Resolve Issued Identified by NRC Bulletin 96-003.List of Meeting Participants & Handouts Encl ML20199F4081997-11-10010 November 1997 Summary of 971105-06 Meeting W/Ies Utilities,Inc Re Responses Provided by Licensee on Following DAEC ITS sections,1,2,3.0,3.1,3.2,3.4,3.5,3.7,3.9,4 & 5.List of Attendees Encl ML20211P0621997-10-10010 October 1997 Summary of 970909-10 Meeting W/Licensee Re Portions of DAEC Improved TS That Seek to Delay Entry Into LCO When Performing Surveillances Required by Improved TS ML20148U5351997-06-30030 June 1997 Summary of 970618 Meeting W/Ies Util,Inc Re Unique Aspects of Duane Arnold Energy Ctr Design Wrt Loop Select Logic. List of Attendees & Licensees Handout Encl ML20147J1981997-04-0909 April 1997 Summary of 970403 Meeting W/Ies Utilities,Inc Re Current Fuel Storage Status & Options at Duane Arnold Energy Ctr. List of Attendees Encl ML20137Q0341997-04-0303 April 1997 Summary of 970320 Meeting W/Util Re TS Setpoints & Practice of Not Entering LCO Action Statements During Certain Surveillances.List of Attendees Attached ML20086N7091995-06-0606 June 1995 Trip Rept of 950523-25 Visit to DAEC Re Const Details & Standoff Calculations ML20059B0971993-10-20020 October 1993 Summary of Operating Reactors Events Meeting 93-39 on 931013 ML20149D6051993-09-15015 September 1993 Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues ML20217C5121991-07-0303 July 1991 Summary of Operating Reactors Events Meeting 91-12 on 910626 ML20058D2851990-10-29029 October 1990 Summary of Operating Reactors Events Meeting 90-26 on 901024.List of Attendees & Rept of Reactor Scram at Facility Also Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20151N0521988-07-26026 July 1988 Summary of Operating Reactors Events Meeting 88-30 on 880726.List of Attendees & Summary of Reactor Scrams Encl ML20215G0561986-10-0707 October 1986 Summary of 860911 Meeting W/Bwr Owners Group in Bethesda,Md Re Strawman Generic Requirements for Enhancing BWR Containment Performance in Severe Accident Conditions.Second Technical Exchange Meeting in mid-Nov 1986 Proposed ML20215D9171986-10-0606 October 1986 Summary of 860929 Operating Reactors Events Meeting 86-34 Re Events Since Last Meeting on 860922.Assignees Should Review Identified Responsibilities & Completion Dates & Advise If Dates Cannot Be Met.Viewgraphs Encl ML20203P6801986-04-22022 April 1986 Summary of 860410 Meeting W/Project Managers & Utils in Bethesda,Md Re Automated Tracking,Integrated Schedules & Tech Specs.Attendees List,Viewgraphs & Meeting Agenda Encl ML20209G6871985-09-0909 September 1985 Summary of Operating Reactor Events Meeting 85-14 on 850826 to Brief Director & Div Directors on Events Which Occurred Since 850813 Meeting.Computer Printout of 1985 Operating Reactor Events Meeting Topics to Date Encl ML20125C5621978-05-0101 May 1978 Summary of 780309-10 Meeting W/Mark I Owners Group in Bethesda,Md Re Changes in Long Term Program as Reflected in Rev 3 to Mark I Owners Group Program Action Plan ML20127A4681978-03-0101 March 1978 Summary of 771129 Meeting W/Mark I Owners Group & GE in San Franciso,Ca Re Listed Topics,Including Results & Bases for long-term Program Decision Point 3.List of Attendees & Viewgraphs Encl ML20141N3471977-05-20020 May 1977 Summary of 770411 Meeting W/Mark I Owners Group & GE to Discuss Structural Acceptance Criteria for Mark I Containment long-term Program.List of Attendees Encl ML20125C5721976-09-0909 September 1976 Summary of 760819 Meeting W/Mark I Owners Group,(Ge) in Bethesda,Md Re Discussions on Mark I Containment Ltp.List of Attendees Encl ML20125C5711976-09-0909 September 1976 Summary of 760812 Meeting W/Mark I Owners Group,Ge,Epri & Techncial Consultants Re Listed Long Term Program Tasks ML20125D6581976-08-18018 August 1976 Summary of 760717-08 Meeting W/Representatives of Mark I Owners Group in Bethesda,Md Re Discussions on Reassessed Content of Mark I Containment LTP & Recently Submitted Responses to Questions on STP Final Rept ML20235E9641975-08-0606 August 1975 Summary of 750717 Meeting W/Mark I Owners Group Re Role of Mark I Owners Group Program & Schedule for Determining Mark I Safety/Relief Valve & LOCA Dynamic Loads & Impact of Loads on Operating Mark I Plants.List of Attendees Encl 1998-06-29
[Table view] Category:TRIP REPORTS
MONTHYEARML20086N7091995-06-0606 June 1995 Trip Rept of 950523-25 Visit to DAEC Re Const Details & Standoff Calculations 1995-06-06
[Table view] |
Text
- . ,
1
's ..
- CEMRO-ED-ST 6 June 95 MEMORANDUM FOR RECORD e
SUBJECT:
Trip Report for Visit to Duane Arnold Energy Center 23
~
- 25 May 95
- 1. I arrived at Cedar Rapids, IA, the afternoon of 23 May.
- 2. On the morning of 24 May, I proceeded to the Duane Arnold Energy Center (DAEC). At DAEC I met with the following individuals.
- a. Diane Engelhardt - Security Superintendent, IES Utilities, (319) 851-7280.
- b. Steve Catron - Senior Licensing Engineer, IES Utilities, (319) 851-7234.
- c. Gary Biderman - Project Manager, IES Utilities, (319) 851-7515.
- d. Mike Miller - Project Engineer, IES Utilities, (319) 851-7658.
- e. Frank George - Project Engineer, IES Utilities, (319) 851- ,
7143. ,
- f. Jon Rysdon - Consultant, Bechtel, (708) 955-2621. ;
- g. Jim Kinsey - Licensing Supervisor, IES Utilities, (319) 851-7177.
- h. Dennis Lausar - Project Engineer Supervisor, IES Utilities, (319) 851-7398.
- 2. I attempted to meet with the Nuclear Regulatory Commission ,
resident inspectors to explain the purpose of my visit, however, they were unavailable.
- 3. A walking tour of the site perimeter was conducted.
Following the walking tour, I reviewed construction details and the standoff calculations. The following are my observations based on the tour and review.
- a. The planned elements of the vehicle barrier system (VBS) are capable of stopping the design basis vehicle and the location of the VBS will mitigate damage caused by the design basis bomb l to an acceptable level. '
- b. The four buildings planned to be part of the VBS (Security Center, Warehouse, Badging Center, and former Sanitary Treatment 9507250305 950629 '
PDR ADOCK 05000331 P PDR
o- ,. 3
. CEMRO-ED-ST
SUBJECT:
Trip Report for Visit to Duane Arnold Energy Center 23
- 25 May 95 '
s; Facility) will function more than adequately as barriers to prevent vehicle penetration.
- c. Construction details appear good, including the detail of the coupler for removable Jersey barriers and the contingency plan of increasing the size of the above ground portion of the active barrier buttress adjacent to the Security Center if necessary.
- 4. On 25 May I returned to Omaha.
- 5. I am maintaining a file containing the material (photographs, drawings, etc.) provided by IES Utilities in my USNRC file. If anyone has questions regarding this trip report, please contact '
me at (402) 221-4914.
hs [W f DALE T. NEBUDA, P.E.
Structural Engineer ,
l' l
l l
I l
2 l i
l
_ __