ML20066E139

From kanterella
Revision as of 03:13, 30 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Fifth Interim Rept of Deficiency 81-04 Re Inconsistencies in Certifications of HVAC Matls Installed by Zack Co.Initially Reported on 811002.Zack QA Manual Revised & Procurement Documentation Revalidated.Final Rept Expected in 90 Days
ML20066E139
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/03/1982
From: Hall D
ILLINOIS POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, 81-04, 81-4, U-10007, NUDOCS 8211120446
Download: ML20066E139 (4)


Text