ML20066H130

From kanterella
Revision as of 00:00, 30 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Interim Deficiency Rept 82-10 Re Min Wall Violations for safety-related Piping.Initially Reported on 821007.Sargent & Lundy Reviewing Design Info & Isometric Drawings.Scope of Increased Review Expected by Jan 1983
ML20066H130
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/12/1982
From: Hall D
ILLINOIS POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, DER-82-10, U-10009, NUDOCS 8211230169
Download: ML20066H130 (4)


Text