Letter Sequence Other |
---|
|
|
MONTHYEARML0205803792002-01-30030 January 2002 Response to NRC RAI Regarding License Amendment Request for Revised Reference for Reactor Vessel Level Setpoints, Simplification of Safety Limits, and Improvements to the Bases Project stage: Response to RAI ML0207902892002-03-0101 March 2002 Additional Information Provided in Support of Previously Submitted License Amendment for Revised Reference for Reactor Vessel Level Setpoints, Simplification of Safety Limits, and Improvements to the Bases Project stage: Other ML0216902622002-06-11011 June 2002 Technical Specification Pages for Amendment No. 128 for Monticello Project stage: Other ML0133906772002-06-11011 June 2002 Issuance of Amendment, Relating to Technical Specification Revisions to Reference Point for Reactor Vessel Level Setpoints, to Safety Limits & to Bases Project stage: Approval 2002-03-01
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000263/20240052024-08-30030 August 2024 Updated Inspection Plan and Follow-Up Letter for Monticello Nuclear Generating Plant, Unit 1 (Report 05000263/2024005) L-MT-24-028, Response to RCI for RR-017 ISI Impracticality2024-08-28028 August 2024 Response to RCI for RR-017 ISI Impracticality 05000263/LER-2024-002, Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure2024-08-27027 August 2024 Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure ML24222A1822024-08-27027 August 2024 – Proposed Alternative Request VR-09 to the Inservice Testing Requirements of the ASME OM Code for Main Steam Safety Relief Valves IR 05000263/20244202024-08-21021 August 2024 Security Baseline Inspection Report 05000263/2024420 - Cover Letter IR 05000263/20240022024-08-14014 August 2024 Integrated Inspection Report 05000263/2024002 ML24218A2282024-08-0505 August 2024 Request for Confirmation of Information for Relief Request RR-017, Inservice Inspection Impracticality During the Fifth Ten-Year Interval ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24215A2992024-07-23023 July 2024 Minnesota State Historic Preservation Office Comments on Monticello SLR Draft EIS ML24198A2372024-07-18018 July 2024 Information Request to Support Upcoming Biennial Problem Identification and Resolution (Pi&R) Inspection at Monticello Nuclear Generating Plant L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations2024-07-0909 July 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24164A2402024-06-10010 June 2024 Minnesota State Historic Preservation Office- Comments on Draft Monticello SLR Draft EIS L-MT-24-019, Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii)2024-06-10010 June 2024 Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii) L-MT-24-017, Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-01602024-06-0404 June 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-0160 ML24137A2792024-06-0303 June 2024 Audit Summary for License Amendment Request to Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 IR 05000263/20244012024-05-30030 May 2024 Public - Monticello Nuclear Generating Plant - Cyber Security Inspection Report 05000263/2024401 ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information ML24141A1782024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-MT-24-015, Response to Request for Additional Information - Alternative Request VR-09 for OMN-172024-05-16016 May 2024 Response to Request for Additional Information - Alternative Request VR-09 for OMN-17 L-MT-24-013, 2023 Annual Radiological Environmental Operating Report2024-05-14014 May 2024 2023 Annual Radiological Environmental Operating Report ML24135A1902024-05-14014 May 2024 Submittal of 2023 Annual Radioactive Effluent Release Report IR 05000263/20240102024-05-13013 May 2024 Age-Related Degrading Inspection Report 05000263/2024010 ML24127A1472024-05-0909 May 2024 Letter to Mille Lacs Band- Section 106 Consultation Regarding the Monticello Nuclear Generating Plant Subsequent License Renew. Application ML24128A0042024-05-0909 May 2024 Letter to Minnesota State Historic Preservation Office- Section 106 Consultation Regarding the Monticello Nuclear Generating Plant Subsequent License Renewal Application L-MT-24-016, 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP)2024-05-0808 May 2024 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) ML24089A2382024-04-29029 April 2024 Summary of Nuclear Property Insurance IR 05000263/20240012024-04-29029 April 2024 Plan - Integrated Inspection Report 05000263/2024001 L-MT-24-012, Reactor Scram, Containment Isolation, and Cooldown Rate Outside of Limits Following Technician Adjustment of Wrong Component2024-04-25025 April 2024 Reactor Scram, Containment Isolation, and Cooldown Rate Outside of Limits Following Technician Adjustment of Wrong Component ML24115A2922024-04-25025 April 2024 Sec106 Tribal, Jensvold, Kevin-Upper Sioux Community ML24115A2912024-04-25025 April 2024 Sec106 Tribal, Jacskon, Sr., Faron-Leech Lake Band of Ojibwe ML24115A2882024-04-25025 April 2024 Sec106 Tribal, Fairbanks, Michael-White Earth Nation.Docx ML24115A3032024-04-25025 April 2024 Sec106 Tribal, Taylor, Louis-Lac Courte Oreilles Band of Lake Superior Chippewa Indians ML24115A3052024-04-25025 April 2024 Sec106 Tribal, Vanzile, Jr., Robert-Sokaogon Chippewa Community ML24115A3012024-04-25025 April 2024 Sec106 Tribal, Seki, Darrell-Red Lake Nation ML24115A2872024-04-25025 April 2024 Sec106 Tribal, Dupuis, Kevin-Fond Du Lac Band of Lake Superior Chippewa ML24115A3002024-04-25025 April 2024 Sec106 Tribal, Rhodd, Timothy-Iowa Tribe of Kansas and Nebraska ML24115A2962024-04-25025 April 2024 Sec106 Tribal, Larsen, Robert-Lower Sioux Indian Community ML24115A2932024-04-25025 April 2024 Sec106 Tribal, Johnson, Grant-Prairie Island Indian Community ML24115A2892024-04-25025 April 2024 Sec106 Tribal, Fowler, Thomas-St. Croix Chippewa of Wisconsin ML24115A3022024-04-25025 April 2024 Sec106 Tribal, Stiffarm, Jeffrey-Fort Belknap Indian Community ML24115A3072024-04-25025 April 2024 Sec106 Tribal, Williams, Jr., James-Lac Vieux Desert Band of Lake Superior Chippewa Indians ML24115A2942024-04-25025 April 2024 Sec106 Tribal, Johnson, John-Lac Du Flambeau Band of Lake Superior Chippewa Indians ML24115A3062024-04-25025 April 2024 Sec106 Tribal, Wassana, Reggie-Cheyenne and Arapaho Tribes ML24115A2992024-04-25025 April 2024 Sec106 Tribal, Renville, J. Garret-Sisseton Wahpeton Oyate of the Lake Travers Reservation ML24115A2902024-04-25025 April 2024 Sec106 Tribal, Jackson-Street, Lonna-Spirit Lake Nation ML24115A2952024-04-25025 April 2024 Sec106 Tribal, Kakkak, Gena-Menominee Indian Tribe of Wisconsin ML24115A2972024-04-25025 April 2024 Sec106 Tribal, Miller, Cole-Shakopee Mdewakanton Sioux Community ML24115A2982024-04-25025 April 2024 Sec106 Tribal, Reider, Anthony-Flandreau Santee Sioux Tribe ML24106A1102024-04-24024 April 2024 Mille Lacs Band of Ojibwe -Monticello Sec106 Tribal ML24115A2792024-04-24024 April 2024 Sec106 Tribal, Blaker, Doreen-Keweenaw Bay Indian Community 2024-08-05
[Table view] |
Text
NMC Committed to Nuclear Exllence Monticello Nuclear Generating Plant Operated by Nuclear Management Company, LLC March 1, 2002 10 CFR Part 50, Section 50.90 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Additional Information Provided in Support of Previously Submitted License Amendment for Revised Reference for Reactor Vessel Level Setpoints, Simplification of Safety Limits, and Improvements to the Bases (TAC NO. MB2246)
Reference 1: Nuclear Management Company, LLC letter to Nuclear Regulatory Commission, "Revised Reference Point for Reactor Vessel Level Setpoints, Simplification of Safety Limits, and Improvements to the Bases," dated June 18, 2001.
Reference 2: Nuclear Management Company, LLC letter to Nuclear Regulatory Commission, "Response to NRC Request for Additional Information Regarding License Amendment Request for Revised Reference Point for Reactor Vessel Level Setpoints, Simplification of Safety Limits, and Improvements to the Bases (TAC NO. MB2246)," dated January 30, 2002.
By Reference 1 letter, as supplemented by Reference 2, Nuclear Management Company, LLC (NMC) requested a change to the Technical Specifications (TS),
Appendix A of Operating License DPR-22, for the Monticello Nuclear Generating Plant.
This letter clarifies the previous submittal made by Reference 1, as supplemented by Reference 2, and provides NMCs additional justification for part of the previously submitted TS change. This additional justification is being provided for the previously proposed revision to the Safety Limit Section of the Monticello TS; no additional revised pages are required.
The Current Technical Specifications (CTS) for Monticello state that if a Safety Limit is exceeded, the reactor shall be shut down immediately. The Proposed Technical Specifications (PTS) state that with any Safety Limit violation, the following actions shall 2807 West County Road 75 ? Monticello, Minnesota 55362-9637 Telephone: 763.295.5151 ? Fax: 763.295.1454 A- o
ULSNRC Nuclear Management Company, LLC Page 2 be completed within 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s: A. Restore compliance with all Safety Limits; and B.
Insert all insertable control rods. As stated in Reference 1 Bases for PTS 2.2, exceeding a Safety Limit may cause fuel damage and create a potential for radioactive releases in excess of 10 CFR 100, "Reactor Site Criteria," guidelines. Therefore, it is required to insert all insertable control rods and restore compliance with the Safety Limit within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. The 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> completion time ensures that the operators take prompt remedial action and also ensures that the probability of an accident occurring during this period is minimal. This information should have also been provided as justification for the revision to CTS as provided in the PTS submittal. Additionally, the less restrictive 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> completion time is also justified because it allows appropriate actions to be evaluated by the operator and completed in a timely manner. This will prevent the operator from feeling time pressured by a TS requirement which requires an immediate response and allows time to evaluate the situation before responding. This could possibly prevent a plant transient and a worse situation than was originally entered into, therefore, the 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> completion time to restore compliance with all Safety Limits is reasonable.
The above referenced additional justification has no technical impact on pages or justifications previously submitted. This justification is consistent with the previously proposed changes. Therefore, the Determination of No Significant Hazards Consideration and Environmental Assessment submitted by Reference 1 are also applicable to this supplemental submittal.
If you have any questions regarding this letter or the previous License Amendment Requests please contact Doug Neve, Licensing Project Manager, at (763) 295-1353.
Jeffrey S. Forbes Vice President Monticello Nuclear Generating Plant cc: Regional Administrator-Ill, NRC NRR Project Manager, NRC Sr. Resident Inspector, NRC Minnesota Department of Commerce J Silberg, Esq.