ML20071C737

From kanterella
Revision as of 00:58, 27 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1983
ML20071C737
Person / Time
Site: Crystal River 
Issue date: 02/02/1983
From: Bogart D
FLORIDA POWER CORP.
To:
Shared Package
ML20071C732 List:
References
NUDOCS 8303080039
Download: ML20071C737 (4)


Text

t

\

l OPERATING DATA REPORT, k

DOCKET NO. 50-302 DATE 2/2/83 COMPLETED BY D. Bogart TELEPHONE (904) 795-6486

_ OPERATING STATUS Crystal River Unit #3 Notes

1. Unit Name:
2. ReportagPened 1/1/83 - 1/31/83
3. I Ic===8 Thermal Power (MWt): _ 2544 890
4. Nameplate Rating (Grom MWe):

l S. Deusa Elecencal Rating (Net MWe):

825 850

6. Maximum Dependable Capacity (Gross MWe):

811

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report,Give Reasons:

Revised MDC ratines based on operating history.

9. Power Level To Wluch Restncted,1f Any (Net MWe): 2475 MW thermal
10. Reasons For Restrictions,1f Any: P"an Pnuar hnfenra in hvnace.

This Month Yr.-to.Date Cumulative

11. Hours In Reporting Period 744 744 51624 744 744 32951.2
12. Number Of Hours Reactor Was Critical 0 0 1280.3
13. Reactor Reserve Shutdown Hours _

32210.9 744 744

14. Hours Generator On.Line 0 0 0
15. Unit Reserve Shutdown Hours
16. Gross Thennal Energy Generated (MWH) 1777945 1777945 72302900 -

622985 622985 24589602

17. Gross Electrical Energy Generated (MWH) ,_,
18. Net Electrical Energy Generated (MWH) 594578 594578 23339458 100% 100% 62.4%
19. Unit Semce Factor 100% 100% 62.4%
20. Unit Availability Factor 98.5% 98.5% 57.4%
21. Unit Capacity Factor (Using MDC Net) -

54.8%

' 96.9% 96.9%

22. Unit Capacity Factor (Using DER Net) 0% 0% 25.6%
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Eacht:

~

nernal outane beninnine 3/19/83. scheduled to last 16 weeks.

1 t 25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A

26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved 1

INITIAL CRITICALITY I/14/77 INITIAL ELECTRICITY l/30/77 COMMERCIAL OPERATION 3/13/77 8303000039 830215 (9/77)

PDR ADOCK 05000302 PDR R

po. . ,.

DOCKET NO. 50-302 -

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME FLCRP-3 DATE 2 /4 /8'l COMPLETED BY MX ('ul va r REPORT MONTH I/83 TELEPHONE (904) 795-6486 Cause & Corrective

.$ E 3 Y Licensee E*,

k*". Action to No. D.ite R Eg s j5E Event  :( ?

5 jgg N0 Prevent Recurrence H

$E Report #

fU 6

A N/A N/A HC HTEXCH Reduced power to find a saltwater 83-01 830106 F --

leak in condenser waterbox C. ,

H N/A N/A CB MOTORX Reduced power due to what appeared to 83-02 830125 F --

be an increasing motor bearing oil level. Continued observation while at low power showed there was no problem. The unit returned to full i power.

N/A HC HTEXCH Reduced power to clean waterboxes.

83-03 830126 S -- B N/A 3 4 I 2 Method: Exhibit G Instructions F: Forced . Reason: for Preparati<m of Data I-Manual S: Scheduled A-Equipment Failure (Explain) 2 Manual Scram. Entry Sheets for Licensee B Maintenance of Test Event Report (LER) File (NUREG-C Refueling 3 Automatic Scram.

4-Other (Explain) 01611 -

D Regulatory Restriction I E-Operator Training & Ucense Examination 5

F Administrative Exhibit I- Same Source G Operational Error (Explain) 19/77) Il Other (Explain)

AVERAGE DAILY UNIT POWER LEVEL 50-302 f . , DOCKET NO.

UNIT FLCRP-3 ,

DATE 2/2/83 D. Bogart COMPLETED BY TELEPHONE (4041 795-6486 January 1983 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 811 839 1 17 824 gg 820 2

831 g, g79 3

._ 825 20 829 4

825 21 827 5

772 22 R94 6

738 23 825 7

781 y 830 g

9 829 25 636 829 26 686 10 828 622

,, 27 836 28 676 12 824 816 13 39 14 30 820 33 831 15 834 16 INSTRUCTIONS On this format, list the average daily unit power lesel in MWe Net fcr each day in the reporting month. Compute to the nearest whole megawatt.

(W77)

~

de

. M)NTHLY OPERATIONAL

SUMMARY

STATEMENT r

E .

DOCKET NO. 50-302 UNIT FLCRP-3 DATE 2/4/83 CCHPLETED BY M.W. Culver TELEPHONE (904) 795-6486 MONTH Januarv 1983

SUMMARY

STATEMENT: The onit experienced three power reductions this month.

i e

l

- _ - - . . - - _ . __ __