Letter Sequence RAI |
---|
|
|
MONTHYEARML0212300382002-05-0303 May 2002 Request for Additional Information Related to Request for Proposed Amendment to Revise Knpp TS Section 3.10.f Project stage: RAI ML0234402902002-12-10010 December 2002 Review Regarding Proposed Amendment Request TS 3.10.f, Inoperable Rod Position Indicator Channels, Changes, Dated January 14, 2002 Project stage: Other ML0234403122002-12-10010 December 2002 Attachment to 12/10/02 Memo - Draft of RAI Sent Via e-mail from J. Lamb to T. Maloney November 25, 2002, at 3:44 P.M Project stage: Draft RAI ML0301505852003-01-0808 January 2003 Withdrawal of Proposed Amendment Regarding Allowed Outage Time for Individual Rod Position Indicator System Project stage: Withdrawal ML0301002372003-01-10010 January 2003 Withdrawal of an Amendment Request Regarding Allowed Outage Time for the Individual Rod Position Indicator System Project stage: Withdrawal 2002-05-03
[Table View] |
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML23268A4362023-09-21021 September 2023 Extension Date Approval for Request for Additional Information for Exemptions on Site Restoration Activities ML23222A1532023-08-29029 August 2023 Solutions Restore Enclosure RAI 1 - Final ML22032A3252022-02-0202 February 2022 Enclosure - Request for Additional Information ML21257A0682021-09-30030 September 2021 Request for Additional Information Regarding Application for Order Approving Transfer of Control of Kewaunee Power Station License and Conforming License Amendments ML21257A0692021-09-30030 September 2021 Enclosure - Request for Additional Information - Application for Order Approving Transfer of Control of Kewaunee Power Station License and Conforming License Amendment ML20050E1012020-02-21021 February 2020 Letter-RAI 1 - MAGNASTOR-Kewaunee Exemption with Enclosure ML16287A7142016-10-13013 October 2016 E-mail - Request for Additional Information: Dominion Energy Kewaunee, Dominion Nuclear Connecticut and Virginia Electric Power Company Nuclear Facility Quality Assurance Program Description Topical Report ML16041A1562016-02-10010 February 2016 Request for Additional Information for Kewaunee Power Station License Amendment Request for Emergency Plan Changes ML14115A0412014-08-14014 August 2014 Request for Additional Information, License Amendment Request to Revise Permanently Defueled Emergency Plan and Emergency Action Level Scheme ML12138A0072012-05-15015 May 2012 NRR E-mail Capture - ME7110 Scvb Draft RAI Set Adoption of TSTF-51 & TSTF- 448, as Part of Chi-over-Q Action ML12118A4652012-04-26026 April 2012 NRR E-mail Capture - FW: ME8460 (Successor to ME8205) - Kewaunee Power Station - 10 CFR 50.46, 30-Day Response - Request for Addtional Information - Replacement Draft Items.2012/04/26 NRR E-mail Capture - FW: ME8460 (Successor to ME8205) - ML12115A0752012-04-23023 April 2012 NRR E-mail Capture - ME8460 (Successor to ME8205) - Kewaunee Power Station - 10 CFR 50.46, 30-Day Response - Request for Additional Information - Replacement Draft Items ML12093A4812012-04-0202 April 2012 RAI - Kewaunee Relief Requests Under TAC ME7378 ML12056A0502012-03-12012 March 2012 Enclosure 4 - Recommendation 2.3: Flooding ML12056A0482012-03-12012 March 2012 Enclosure 2 - Recommendation 2.1: Flooding ML12056A0472012-03-12012 March 2012 Enclosure 1 - Recommendation 2.1: Seismic ML12056A0492012-03-12012 March 2012 Enclosure 3 - Recommendation 2.3: Seismic ML12056A0512012-03-12012 March 2012 Enclosure 5 - Recommendation 9.3: Emergency Preparedness ML12066A0082012-03-0202 March 2012 NRR E-mail Capture - ME7110 Kewaunee Amendment Request- Chi-over-Q - Aadb Request for Additional ML12023A0572012-01-13013 January 2012 NRR E-mail Capture - ME7110 Kewaunee Amendment Request Re_ Chi-over-Q - Ahpb Request for Additional Information (RAI) - Firm RAI Items ML12023A0472012-01-0909 January 2012 NRR E-mail Capture - ME7110 Kewaunee Amendment Request Re_ Chi-over-Q - Ahpb Request for Additional Information (RAI) ML11339A0012011-12-0101 December 2011 NRR E-mail Capture - ME7110 Kewaunee Amendment Request Re_ Chi-over-Q - Eicb Request for Additional Information (RAI) ML1106303592011-03-0707 March 2011 Request for Additional Information Related to License Amendment Request for Approval of Cyber Security Plan ML1036305892011-01-0606 January 2011 Request for Additional Information, Kewaunee Power Station Relief Request No. RR-2-2, Steam Generator Large-Bore Snubber Inspection and Testing for Fourth 10-Year Interval ML1028102572010-10-0505 October 2010 Attachment: ME4011 Request for Additional Information (RAI) ML1024402012010-09-16016 September 2010 08/31/10 Summary of Telephone Conference Call Between Dominion Energy Kewaunee, Inc. and the U.S. Nuclear Regulatory Commission Concerning a Draft Request for Additional Information Pertaining to the Kewaunee Power Station License Renewal A ML1023901982010-09-16016 September 2010 08/26/10 Summary of Telephone Conference Call Between Dominion Energy Kewaunee, Inc. and NRC Concerning a D-RAI Pertaining to the Kewaunee Power Station License Renewal Application ML1025003572010-09-10010 September 2010 Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application ML1014103222010-05-27027 May 2010 Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application ML1009503792010-04-14014 April 2010 Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application ML1006903992010-03-11011 March 2010 Request for Additional Information for the Review of the Kewaunee Power Station, License Renewal Application ML1007003002010-03-11011 March 2010 Draft RAI Re. Use of TSTF-490-A in Kewaunee'S ITS Conversion ML0935003062010-01-0404 January 2010 Request for Additional Information Regarding the Review of the Kewaunee Power Station License Renewal Application - AMRs ML0933104432009-12-16016 December 2009 Request for Additional Information Regarding the Review of the Kewaunee Power Station License Renewal Application - AMRs ML0932400952009-12-0303 December 2009 Request for Additional Information for the Review of the Kewaunee License Renewal Application - Aging Management Review/Aging Management Program ML0918908362009-11-20020 November 2009 Request for Additional Information Regarding the Review of the Kewaunee Power Station License Renewal Application ML0928702112009-10-14014 October 2009 Revised Questions 4, 6, 7, and 12 of Formal RAI Dated 08/14/2009 GL 2004-02 ML0923900632009-10-13013 October 2009 Request for Additional Information Regarding the Review of the Kewaunee Power Station License Renewal Application - Aging Management Review Results ML0921205462009-08-28028 August 2009 Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application - Aging Management Review Results ML0920400062009-08-14014 August 2009 RAI, Regarding Response to Generic Letter 2004-02 (Tac No. MC4691) ML0920902962009-07-27027 July 2009 Response to Request for Additional Information for Inservice Inspection Program Fourth Ten-year Interval Proposed Alternative No. RR-1-11 ML0920802542009-07-27027 July 2009 E-mail 7/27/09 Re Kewaunee Request for Information ML0918805552009-07-16016 July 2009 Request for Additional Information Regarding the Review of the Kewaunee Power Station License Renewal Application - Structures Scoping/Fire Protection ML0918109582009-07-13013 July 2009 Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application - Aging Management Programs ML0918900172009-07-10010 July 2009 RAI Regarding the Environmental Review of the License Renewal Application for Kewaunee Power Station ML0911903892009-07-0707 July 2009 Request for Additional Information Regarding the Review of the Kewaunee Power Station License Renewal Application - Leak-Before-Break ML0918311242009-07-0202 July 2009 Request a Conference Call to Discuss an Open Issue in the Draft Safety Evaluation Regarding Fire Protection for Extended Power Uprate ML0917406492009-06-22022 June 2009 Draft RAI on Generic Letter 2004-02 Re. Potential Impact of Debris Blockage of PWR Sumps ML0911201992009-04-30030 April 2009 RAI, Review of the License Renewal Application - Scoping & Screening Methodology ML0907607862009-04-0303 April 2009 License Renewal Application Review, Request for Additional Information - Balance of Plant Scoping and Screening 2023-09-21
[Table view] |
Text
May 3, 2002 Mr. Mark Warner Site Vice President Kewaunee and Point Beach Nuclear Power Plants Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241
SUBJECT:
KEWAUNEE NUCLEAR POWER PLANT - REQUEST FOR ADDITIONAL INFORMATION RELATED TO REQUEST FOR PROPOSED AMENDMENT TO REVISE KEWAUNEE NUCLEAR POWER PLANT TECHNICAL SPECIFICATION SECTION 3.10.f (TAC NO. MB3825)
Dear Mr. Warner :
By letter dated January 14, 2002, Nuclear Management Company, LLC (NMC or the licensee) submitted a request for a proposed amendment to revise Kewaunee Nuclear Power Plant Technical Specifications Section 3.10.f. The proposed amendment requests an allowed outage time for the Individual Rod Position Indicator (IRPI) system of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> with more than one IRPI per group inoperable.
The Nuclear Regulatory Commission (NRC) staff finds that the additional information identified in the enclosure is needed.
A draft of the request for additional information was e-mailed to Mr. G. Riste (NMC) on April 11, 2002.
A phone call was held between G. Riste (NMC), T. Maloney (NMC), S. Peters (NRC), and myself on April 19, 2002, to discuss the questions to ensure that there was no misunderstanding. Also, the phone call established a mutually agreeable response date of 30 days from the date of this letter.
Please contact me at (301) 415-1446 if future circumstances should require a change in this response date.
Sincerely,
/RA/
John G. Lamb, Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-305
Enclosure:
Request for Additional Information cc w/encl: See next page
May 3, 2002 Mr. Mark Warner Site Vice President Kewaunee and Point Beach Nuclear Power Plants Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241
SUBJECT:
KEWAUNEE NUCLEAR POWER PLANT - REQUEST FOR ADDITIONAL INFORMATION RELATED TO REQUEST FOR PROPOSED AMENDMENT TO REVISE KEWAUNEE NUCLEAR POWER PLANT TECHNICAL SPECIFICATION SECTION 3.10.f (TAC NO. MB3825)
Dear Mr. Warner :
By letter dated January 14, 2002, Nuclear Management Company, LLC (NMC or the licensee) submitted a request for a proposed amendment to revise Kewaunee Nuclear Power Plant Technical Specifications Section 3.10.f. The proposed amendment requests an allowed outage time for the Individual Rod Position Indicator (IRPI) system of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> with more than one IRPI per group inoperable.
The Nuclear Regulatory Commission (NRC) staff finds that the additional information identified in the enclosure is needed.
A draft of the request for additional information was e-mailed to Mr. G. Riste (NMC) on April 11, 2002.
A phone call was held between G. Riste (NMC), T. Maloney (NMC), S. Peters (NRC), and myself on April 19, 2002, to discuss the questions to ensure that there was no misunderstanding. Also, the phone call established a mutually agreeable response date of 30 days from the date of this letter.
Please contact me at (301) 415-1446 if future circumstances should require a change in this response date.
Sincerely,
/RA/
John G. Lamb, Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-305
Enclosure:
Request for Additional Information cc w/encl: See next page DISTRIBUTION PUBLIC CLi FAkstulewicz THarris PDIII-1 Reading RLanksbury, RIII JLamb ACRS LRaghavan OGC ADAMS ACCESS NO: ML021230038 OFFICE PDIII-1/PM PDIII-1/LA PDIII-1/SC NAME JLamb THarris LRaghavan DATE 05/03/02 05/03/02 05/03/02 OFFICIAL RECORD COPY
Kewaunee Nuclear Power Plant cc:
Foley & Lardner ATTN: Bradley D. Jackson Nuclear Asset Manager One South Pinckney Street Wisconsin Public Service Corporation P.O. Box 1497 600 N. Adams Street Madison, WI 53701-1497 Green Bay, WI 54307-9002 Chairman Plant Manager Town of Carlton Kewaunee Nuclear Power Plant Route 1 Nuclear Management Company, LLC Kewaunee, WI 54216 North 490, Highway 42 Kewaunee, WI 54216-9511 Gerald Novickus, Chairman Kewaunee County Board Kewaunee County Courthouse Kewaunee, WI 54216 Attorney General 114 East, State Capitol Madison, WI 53702 U.S. Nuclear Regulatory Commission Resident Inspectors Office Route #1, Box 999 Kewaunee, WI 54216 Regional Administrator - Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4531 James D. Loock, Chief Engineer Public Service Commission of Wisconsin 610 N. Whitney Way Madison, WI 53707-7854 Michael D. Wadley Chief Nuclear Officer Nuclear Management Company, LLC 700 First Street Hudson, WI 54016
REQUEST FOR ADDITIONAL INFORMATION REGARDING REQUEST FOR PROPOSED AMENDMENT TO KEWAUNEEE NUCLEAR POWER PLANT TECHNICAL SPECIFICATIONS (TSs) SECTION 3.10.f (TAC NO. MB3825)
- 1. With one rod position indicator channel inoperable, the current TS 3.10.f.1.A requires the determination of position of the rod cluster control, ... at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, or subsequent to rod motion exceeding a total displacement of 24 steps, whichever occurs first. This TS implies that, following rod displacement, an immediate check of the rod position is required, i.e. prior to the 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> already in effect. However, the proposed TSs would require an inspection within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> following the same rod displacement.
Describe the safety significance of this change. Why is it acceptable to set 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> as an inspection time when a more immediate requirement was set in the original TSs?
- 2. It is our understanding that Kewaunees Final Safety Analysis Report (FSAR) Section 7.3.2, System Design, refers to the control rod demand position indication system as the Digital System. In reference to the Digital System, Kewaunees FSAR states:
The digital and analog systems are separate systems; each serves as backup for the other. Operating procedures require the reactor operator to compare the digital and analog readings upon receiving a rod deviation alarm. Therefore, a single-failure in rod position indication does not in itself lead the operator to take erroneous action in the operation of the reactor.
10 CFR Part 50, Appendix A, General Design Criteria for Nuclear Power Plants, Criterion 13, Instrumentation and Control, states that instrumentation to monitor variables and systems over their operating ranges during normal operation, anticipated operational occurrences, and accident conditions must be operable. In conjunction with this definition of instrumentation, NUREG-1431 Vol.1, Rev. 2, Standard Technical Specifications Westinghouse Plants, TS 3.1.7, Rod Position Indication indicates that the Demand Position Indication System shall be operable.
However, it is our understanding that the proposed TSs do not contain requirements for the Digital System (Demand Position Indication System) to be operable. Given that both GDC 13 and NUREG-1431 indicate that the digital system shall be operable, and that the digital system operability is required to prevent erroneous action as a result of a single-failure, explain why it is acceptable in the proposed TSs to exclude the conditions of NUREG-1431, TS 3.1.7.D, which require demand position indicator operability.
ENCLOSURE