(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
|
---|
Category:License-Operator
MONTHYEARML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML21279A2192021-10-0606 October 2021 301 Post Exam Comments ML24053A1862021-09-13013 September 2021 301 ADAMS 2A-3 ML24053A1822021-09-13013 September 2021 301 ADAMS 2A-2 ML24053A1942021-09-0303 September 2021 V.C. Summer 2021-301 ADAMS 2B ML24053A1892021-08-26026 August 2021 301 ADAMS 2B ML21074A2712021-03-12012 March 2021 VCS 2021-301 Corporate Notification Letter Aka 210-day Letter ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML24053A1802020-09-0808 September 2020 301 ADAMS 2A-1 ML20105A4342020-04-14014 April 2020 (Vcsns), Unit 1 - NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19352G6942019-12-16016 December 2019 VC Summer 2019-301 Written Exam Approval Letter ML19340A0612019-12-0606 December 2019 VC Summer 2019-301 Exam Approval Letter ML19022A2132019-01-18018 January 2019 VCS 2019 Corporate Notification Letter Aka 210-Day Letter ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML18226A3442018-08-14014 August 2018 VC Summer U2 2017-302 Exam Administrative Items IR 05000395/20183012018-08-14014 August 2018 /2018301 Exam Admin Items 2D ML18116A6892018-04-26026 April 2018 (Vcsns), Unit 1 - Regulatory Issue Summary, RIS 2018-02: Preparation and Scheduling of Operator Licensing Examinations ML18057B5352018-02-26026 February 2018 VC Summer 05000395/2011301 Exam Administrative Items 2C ML18057A7402018-02-26026 February 2018 VCS Unit 1 2017-301 Exam Draft Items (Delayed Release-2 Years) ML18057A7672018-02-26026 February 2018 301 Exam Final Items (Delayed Release-2 Year) ML18057A8142018-02-26026 February 2018 301 Exam Administrative Items (Delayed Release-2 Year) ML18057A9362018-02-26026 February 2018 301 Exam Administrative Items ML18057B5102018-02-26026 February 2018 V. C. Summer 05000395/2011301 Exam Draft Items 2A IR 05000395/20113012018-02-26026 February 2018 VC Summer 05000395/2011301 Exam Administrative Items 2D ML18086B0442018-02-16016 February 2018 Facility Cover Letter - Rii - March 2018 - GFE ML18032A2372018-02-0101 February 2018 Form ES-201 Vogtle 3&4, V.C. Summer 2&3 Initial NRC Written Exam Sample Plan - ADAMS 2A - Public Exam Draft Items - Delay Release 2 Years ML17298B9692017-10-25025 October 2017 /2016-301 Public Draft Items (ADAMS-2A)- Delay Release 2 Yrs ML17298A5722017-10-25025 October 2017 VC Summer 05000395/2017301 Exam Report Items SRO As-Given Written Exam ML17298A5532017-10-25025 October 2017 VC Summer 05000395/2017301 Exam Report Items RO As-Given Written Exam ML17298C0122017-10-25025 October 2017 V. C. Summer, Unit 2, 05200027/2016301 Public Administrative Items (ADAMS-2C)- Delay Release 2 Yrs ML17263B2132017-09-14014 September 2017 V. C. Summer Nuclear Power Plant - Operator Licensing Examination Approval 05000395/2017301 ML17193A9242017-07-12012 July 2017 (U1) 2016-301 Exam Final Items - Delay Release ML17193A9262017-07-12012 July 2017 (U1) 2016-301 Exam Administrative Items - Delay Release ML17181A3542017-06-30030 June 2017 V.C. Summer 2015-301 Exam Draft Items for ADAMS 2A ML17181A3622017-06-30030 June 2017 V.C. Summer 2015-301 Exam Final Items for ADAMS 2B ML17181A3672017-06-30030 June 2017 V.C. Summer 2015-301 Exam Administrative Items for ADAMS 2C ML17181A3762017-06-30030 June 2017 V.C. Summer 2015-301 Exam Administrative Items for ADAMS 2D ML17097A4452017-04-0505 April 2017 Notification of Licensed Operator Initial Examination 05000395/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16279A3232016-10-0303 October 2016 September 2016 - Summer Unit 1 NRC Generic Fundamentals Examination Results ML16201A2232016-07-15015 July 2016 Preparation and Scheduling of Operator Licensing Examinations ML16179A2682016-06-24024 June 2016 (Unit 1) 2016-301 RO As-Given Written Exam ML16179A2712016-06-24024 June 2016 (Unit 1) 2016-301 SRO As-Given Written Exam ML16158A5002016-05-31031 May 2016 VC Summer Operator Licensing Written Examination Approval 05000395/2016301 ML15280A3802015-10-0505 October 2015 September 2015 - NRC Generic Fundamentals Examination Results ML17193A9232015-08-10010 August 2015 (U2) 2016-301 Exam Draft Items - Delay Release ML15211A3932015-07-30030 July 2015 Initial Exam 2015-302 Post Exam Comments RC-15-0076, VC Summer 2015-301 Initial Exam Post Exam Comments2015-06-26026 June 2015 VC Summer 2015-301 Initial Exam Post Exam Comments ML15173A4402015-06-26026 June 2015 VC Summer 2015-301 Initial Exam Post Exam Comments 2022-05-05
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML21279A2192021-10-0606 October 2021 301 Post Exam Comments ML24053A1862021-09-13013 September 2021 301 ADAMS 2A-3 ML24053A1822021-09-13013 September 2021 301 ADAMS 2A-2 ML24053A1942021-09-0303 September 2021 V.C. Summer 2021-301 ADAMS 2B ML24053A1892021-08-26026 August 2021 301 ADAMS 2B ML21074A2712021-03-12012 March 2021 VCS 2021-301 Corporate Notification Letter Aka 210-day Letter ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML24053A1802020-09-0808 September 2020 301 ADAMS 2A-1 ML20105A4342020-04-14014 April 2020 (Vcsns), Unit 1 - NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML19352G6942019-12-16016 December 2019 VC Summer 2019-301 Written Exam Approval Letter ML19340A0612019-12-0606 December 2019 VC Summer 2019-301 Exam Approval Letter ML19022A2132019-01-18018 January 2019 VCS 2019 Corporate Notification Letter Aka 210-Day Letter ML18226A3442018-08-14014 August 2018 VC Summer U2 2017-302 Exam Administrative Items IR 05000395/20183012018-08-14014 August 2018 /2018301 Exam Admin Items 2D ML18116A6892018-04-26026 April 2018 (Vcsns), Unit 1 - Regulatory Issue Summary, RIS 2018-02: Preparation and Scheduling of Operator Licensing Examinations ML18057A7402018-02-26026 February 2018 VCS Unit 1 2017-301 Exam Draft Items (Delayed Release-2 Years) ML18057A7672018-02-26026 February 2018 301 Exam Final Items (Delayed Release-2 Year) ML18057A8142018-02-26026 February 2018 301 Exam Administrative Items (Delayed Release-2 Year) ML18057B5102018-02-26026 February 2018 V. C. Summer 05000395/2011301 Exam Draft Items 2A IR 05000395/20113012018-02-26026 February 2018 VC Summer 05000395/2011301 Exam Administrative Items 2D ML18057A9362018-02-26026 February 2018 301 Exam Administrative Items ML18057B5352018-02-26026 February 2018 VC Summer 05000395/2011301 Exam Administrative Items 2C ML18032A2372018-02-0101 February 2018 Form ES-201 Vogtle 3&4, V.C. Summer 2&3 Initial NRC Written Exam Sample Plan - ADAMS 2A - Public Exam Draft Items - Delay Release 2 Years ML17298A5532017-10-25025 October 2017 VC Summer 05000395/2017301 Exam Report Items RO As-Given Written Exam ML17298C0122017-10-25025 October 2017 V. C. Summer, Unit 2, 05200027/2016301 Public Administrative Items (ADAMS-2C)- Delay Release 2 Yrs ML17298B9692017-10-25025 October 2017 /2016-301 Public Draft Items (ADAMS-2A)- Delay Release 2 Yrs ML17298A5722017-10-25025 October 2017 VC Summer 05000395/2017301 Exam Report Items SRO As-Given Written Exam ML17193A9242017-07-12012 July 2017 (U1) 2016-301 Exam Final Items - Delay Release ML17193A9262017-07-12012 July 2017 (U1) 2016-301 Exam Administrative Items - Delay Release ML17181A3542017-06-30030 June 2017 V.C. Summer 2015-301 Exam Draft Items for ADAMS 2A ML17181A3762017-06-30030 June 2017 V.C. Summer 2015-301 Exam Administrative Items for ADAMS 2D ML17181A3622017-06-30030 June 2017 V.C. Summer 2015-301 Exam Final Items for ADAMS 2B ML17181A3672017-06-30030 June 2017 V.C. Summer 2015-301 Exam Administrative Items for ADAMS 2C ML17097A4452017-04-0505 April 2017 Notification of Licensed Operator Initial Examination 05000395/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16279A3232016-10-0303 October 2016 September 2016 - Summer Unit 1 NRC Generic Fundamentals Examination Results ML16201A2232016-07-15015 July 2016 Preparation and Scheduling of Operator Licensing Examinations ML16179A2682016-06-24024 June 2016 (Unit 1) 2016-301 RO As-Given Written Exam ML16179A2712016-06-24024 June 2016 (Unit 1) 2016-301 SRO As-Given Written Exam ML16158A5002016-05-31031 May 2016 VC Summer Operator Licensing Written Examination Approval 05000395/2016301 ML17193A9232015-08-10010 August 2015 (U2) 2016-301 Exam Draft Items - Delay Release ML15211A3932015-07-30030 July 2015 Initial Exam 2015-302 Post Exam Comments RC-15-0076, VC Summer 2015-301 Initial Exam Post Exam Comments2015-06-26026 June 2015 VC Summer 2015-301 Initial Exam Post Exam Comments ML15173A4402015-06-26026 June 2015 VC Summer 2015-301 Initial Exam Post Exam Comments RC-15-0076, VC Summer 2015-301 Initial Examination 2015-301 Final RO Written Exam2015-06-22022 June 2015 VC Summer 2015-301 Initial Examination 2015-301 Final RO Written Exam ML15173A4382015-06-22022 June 2015 VC Summer 2015-301 Initial Examination 2015-301 Final RO Written Exam ML15173A4392015-05-20020 May 2015 VC Summer 2015-301 Initial Exam Final SRO Written Exam ML15140A6092015-05-19019 May 2015 VC Summer Nuclear Power Plant - Operator Licensing Written Examination Approval 05000395/2015-301 ML14308A2142014-10-30030 October 2014 Notification of Licensed Operator Initial Examination 05000395/2015301 2022-05-05
[Table view] |
Text
V.C. SUMMER NUCLEAR STATION NRC JOB PERFORMANCE MEASURE JPS-008 LOSS OF POWER RANGE INSTRUMENT N-44 (NRC)
Revision No. 3
ý ýq
PAGE 0 It II LOSS OF POWER RANGE INSTRUMENT N-44 (NRC) 11 LOSO OE RNEISRMETN4 NC IIj II F EVALUATOR II TRAINEE II DATE II EVALUATOR SIGNATURE Ii II EVALUATION METHOD: PERFORM SIMULATOR II EVALUATION LOCATION:
II 10.0 MINUTES TIME STARTED:
II ESTIMATED TIME:
II SYSTEMS AND Ii 10CFR55.45(a)4 ID:ENTIFY THE INSTRUMENTATION INSTRUMENT Ii TH:E SIGNIFICANCE OF FACILITY II RE* ADINGS II FAULTED JPM: No I' TIME CRITICAL: No II UNSATISFACTORY II TRAINEE PERFORMANCE: SATISFACTORY II It II l
ii READ TO OPERATOR:
YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE I!
II I' WHEN I TELL YOU TO BEGIN, It II INITIATING CUES. I WILL DESCRIBE GENERAL CONDITIONS UNDER WHICH THIS TASK II THIS Ii IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM II WHICH STEPS I! TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, II II TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. II II WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS I'
ii JOB PERFORMANCE MEASURE WILL BE SATISFIED.
INITIAL CONDITIONS:
- 1. The reactor is at 75% power. All controls are in automatic.
TOOLS AND EQUIPMENT NEEDED:
NONE REFERENCED DOCUMENTS: REV DATE POWER RANGE FAILURE 09/13/95
- 1. AOP*401.10 TASK STANDARDS:
- 1. Control rod motion has been stopped (Bank selector switch placed in MAN).
- 2. Tavg within 1F of Tref.
- 3. N-44 has been removed from service (control power fuses removed)
PAGE 1 hi ii LOSS OF POWER RANGE INSTRUMENT N-44 (NRC) I II f TASK STANDARDS:
INITIATING CUES:
- 1. Respond to Nuclear Instrumentation System annunciators.
TERMINATING CUES:
- 1. Upper and lower detector current comparator switches positioned to PR N44 position.
SAFETY CONSIDERATIONS:
NONE
0 0 JOB PERFORMANCE MEASURE CHECKLIST PAGE 2 (S) DENOTES SEQUENCED ELEMENT
(*) DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST: SAT. UNSAT.
STEP STANDARD S 1. Identify power range channel Operator identifies N-44 has failed low N-44 has failed. by MCB indication.
iNOTE 2: Steps 2 and 3 are Imediate Operator Actions.
STEP STANDARD S'2. Manually control rods. Positions the ROD CNTRL BANK SEL switch to the MAN position.
COMMENTS:
STEP STANDARD
- 3. Stop any transients in Verifies no load change is in progress.
progress.
INOTE 4: Cue operator that no testing is in progress.
STEP STANDARD
- 4. Verify no testing is in Looks at NI panel and/or asks examiner progress. if any testing is in progress STEP STANDARD
- 5. Set the rod stop bypass switch Positions the ROD STOP BYPASS switch to for the failed channel to the BYPASS PR N-44 position and verifies bypass and verifies bistable XCP 6111 status light B2 OP ROD STOP BYP light lit. is lit.
STEP STANDARD
"*6. Maintain Tavg within I*F of Controls Tavg within I*F of Tref with Tref. manual rods.
JOB PERFORMANCE 0 MEASURE CHECKLIST 0 PAGE 3 (S) DENOTES SEQUENCED ELEMENT
(*) DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST: SAT. UNSAT.
COMMENTS:
[NOTE 7: Instruct NROATC that the CRS has requested him to remove N-44 from service.
STEP STANDARD
- 7. Remove control power fuses Control power fuses for the N-44 power from the N-44 power range "A" range "A" drawer removed.
drawer.
COMMENTS:
STEP STANDARD
- 8. Remove instrument power fuses Instrument power fuses from the power from the N-44 power range "B" range N44 B drawer removed.
drawer.
STEP STANDARD
- 9. Set the comparator defeat Positions the comparator channel defeat switch on the comparator and switch to the N44 position.
rate drawer to position associated with failed channel.
0 JOB PERFORMANCE MEASURE CHECKLIST 0 PAGE 4 (S) DENOTES SEQUENCED ELEMENT
(*) DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST: SAT. UNSAT.
STEP STANDARD
- 10. Set UPPER SECTION and LOWER Upper and lower section switches on the SECTION switches on the detector current comparator indicate PR detector current comparator to N44 position.
position associated wLth the failed channel.
STEP STANDARD
- 11. Ensure NR-45 is selected to Selects pen 2 (delta I) to N42 (delta F II).
operable channels.
STEP STANDARD
- 12. Verify the status lights Operator verifies that bistable lights indicate the bistables trip. for Channel IV, PR RATE HI, PR LO and HI setpoints have energized to bright.
Examiner Stops JPM At This Point TIME STOPPED
S:
PAGE 5 LOSS OF POWER RANGE INSTRUMENT N-44 (NRC)
NRC KA
REFERENCES:
KA NUMBER IMPORTANCE FACTOR RO SRO 015GEN. 15 Ability to recognize abnormal 3.5* 3.6!
indications for system operating parameters which are entry-level conditions for emergency and abnormal operating procedures.