ML022120589
ML022120589 | |
Person / Time | |
---|---|
Site: | Quad Cities |
Issue date: | 07/29/2002 |
From: | Office of Nuclear Reactor Regulation |
To: | |
References | |
Download: ML022120589 (1) | |
Similar Documents at Quad Cities | |
---|---|
Category:Technical Specifications
MONTHYEARML24183A1082024-08-0808 August 2024
[Table view]– Issuance of Amendment Nos. 302 and 298 Adoption of Tstf-505, Provide Risk Informed Extended Completion Times – RITSTF Initiative 4b ML23340A1552024-03-15015 March 2024 – Issuance of Amendment Nos. 299 and 295 Adoption of TSTF-564, Safety Limit MCPR ML23349A1622023-12-17017 December 2023 Issuance of Amendment Nos. 298 and 294 Increase Completion Time in Technical Specification 3.8.1.B.4 (Emergency Circumstances) RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs ML22217A0442022-12-0707 December 2022 Issuance of Amendment Nos. 292 and 288 Control Rod Scram Times ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V RS-22-006, Request to Expand Applicability of Prime Methods to Evaluate Fuel Centerline Melt and Cladding Strain Compliance for Framatome Fuel2022-01-20020 January 2022 Request to Expand Applicability of Prime Methods to Evaluate Fuel Centerline Melt and Cladding Strain Compliance for Framatome Fuel ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 RS-20-016, County, Nine Mile Point, Peach Bottom Atomic and Quad Cities - Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems2020-04-13013 April 2020 County, Nine Mile Point, Peach Bottom Atomic and Quad Cities - Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems RS-20-046, Emergency License Amendment Request - Increase Technical Specifications Allowable MSIV Leakage Rates in TS 3.6.1.32020-04-0101 April 2020 Emergency License Amendment Request - Increase Technical Specifications Allowable MSIV Leakage Rates in TS 3.6.1.3 RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement2018-06-15015 June 2018 Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement ML17311A1622017-12-0101 December 2017 Issuance of Amendments Regarding Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML17298A4422017-10-19019 October 2017 Technical Requirements Manual RS-17-126, Quad Cities Nuclear Power Station, Units 1 & 2, Technical Requirements Manual2017-10-19019 October 2017 Quad Cities Nuclear Power Station, Units 1 & 2, Technical Requirements Manual ML16111A1042016-05-11011 May 2016 Issuance of Amendments to Revise the Reactor Steam Dome Pressure in Technical Specification 2.1.1, Reactor Core SLs (CAC Nos. MF6640-MF6644) RS-16-035, County, and Quad Cities - Request for License Amendment to Address Secondary Containment Access Openings2016-02-0303 February 2016 County, and Quad Cities - Request for License Amendment to Address Secondary Containment Access Openings ML15324A4392015-12-17017 December 2015 Issuance of Amendments (CAC Nos. MF5471-MF5476) ML15268A4862015-10-0606 October 2015 Correction of Amendments Adopting Technical Specification Task Force Traveler TSTF-523 (TAC Nos. MF4436-MF4446) ML15183A3512015-08-0505 August 2015 Issuance of Amendments Concerning Adding Topical References to Technical Specifications (TAC Nos. MF3359, MF3363, MF3361, and MF3362)(RS-13-288) ML15141A0582015-07-28028 July 2015 Issuance of Amendments Regarding Emergency Action Level Schemes (TAC Nos. MF4232-MF4251) ML15106A9472015-04-24024 April 2015 Correction to Amendments Regarding Battery Surveillance Requirements (TAC Nos. MF4589 and MF4590) ML14323A5222015-04-0808 April 2015 Issuance of Amendments Regarding the Emergency Plan Definition of Annual Training ML15056A7722015-03-30030 March 2015 Issuance of Amendments Regarding ML14085A5322014-07-21021 July 2014 Issuance of Amendments Adoption of TSTF-522 Ventilation System Surveillance Requirements RS-13-288, Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report.2013-12-19019 December 2013 Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report. RS-13-137, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process2013-09-0303 September 2013 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process RS-13-165, Request for License Amendment to Revise Battery Surveillance Requirements2013-06-10010 June 2013 Request for License Amendment to Revise Battery Surveillance Requirements ML1132603482011-11-22022 November 2011 Request for Technical Specification Change for Safety Limit Minimum Critical Power Ratio RS-11-180, Quad Cities, Unit 2 - Request for Technical Specification Change for Safety Limit Minimum Critical Power Ratio2011-11-22022 November 2011 Quad Cities, Unit 2 - Request for Technical Specification Change for Safety Limit Minimum Critical Power Ratio ML0926704882009-10-21021 October 2009 Issuance of Amendments Risk Informed Modification to Selected Required Action End States for BWR Plants RS-09-036, Request for License Amendment to Technical Specification (TS) 3.4.5, RCS Leakage Detection Instrumentation, TS 5.6.5, Core Operating Limits Report (Color), and Renewed Facility Operating License2009-04-0707 April 2009 Request for License Amendment to Technical Specification (TS) 3.4.5, RCS Leakage Detection Instrumentation, TS 5.6.5, Core Operating Limits Report (Color), and Renewed Facility Operating License ML0824703052008-08-28028 August 2008 Technical Specifications, TSTF Change Traveler TSTF-479 & TSTF-497 ML0823907072008-08-21021 August 2008 Revised T.S. Pages Oyster Creek Nuclear Generating Station and Peach Bottom Atomic Power Station, Unit 3-Correction to Facility Operating Licenses ML0821301362008-07-25025 July 2008 Braidwood/Byron/Clinton/Dresden/Lasalle/Oyster Creek/Peach Bottom/Quad Cities/Three Mile Island - Tech Spec Pages for Amds to Change TS Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators ML0828300312008-07-22022 July 2008 License Amendment, Modify Technical Specification Requirements Related to Turbine Condenser Vacuum - Low Scram Instrumentation Setpoint.-TS Page ML0821105462008-07-22022 July 2008 Technical Specifications, Modifcations Related to Turbine Condenser Vacuum - Low Scram Instrumentation Setpoint RA-08-024, Amergen, Energy LLC, License Amendment Request to Remove References to NRC Generic Letter 82-12, Nuclear Power Plant Staff Working Hours.2008-04-21021 April 2008 Amergen, Energy LLC, License Amendment Request to Remove References to NRC Generic Letter 82-12, Nuclear Power Plant Staff Working Hours. ML0805903842008-03-20020 March 2008 Technical Specifications 5.5, Programs and Manuals, Pages 5 .5-12 Through 5 .5-14, Dresden Units 2 and 3, to CR Habitability Amendment ML0808604742008-03-20020 March 2008 Technical Specifications, Amendment No. 233 and 218 for Dresden and Quad Cities - TS Pages to Dresden/Quad CR Habitability Amendment, 3.7 Plant Systems and 5.5 Programs and Manuals ML0805904092008-03-20020 March 2008 Technical Specifications 3.7, Plant Systems, Pages 3 .7 .4-1 Through 3 .7 .4-3, Dresden Units 2 and 3, to CR Habitability Amendment ML0805903992008-03-20020 March 2008 Technical Specifications 3.7, Plant Systems, Pages 3 .7 .4-1 Through 3 .7 .4-3, Quad Cities Units 1 and 2, to CR Habitability Amendment ML0805903732008-03-20020 March 2008 Technical Specifications 5.5, Programs and Manuals, Pages 5 .5-12 Through 5 .5-14, Dresden Units 2 and 3, to CR Habitability Amendment ML0803100732008-02-28028 February 2008 Technical Specifications, Issuance of Amendments Safety Limit Minimum Critical Power Ratio RS-08-012, Amergen Company, Request for Amendment to Administrative Controls Section of Technical Specifications2008-02-28028 February 2008 Amergen Company, Request for Amendment to Administrative Controls Section of Technical Specifications ML0735400492007-12-19019 December 2007 Letter to C. Pardee Correction of Administrative Error in Amendment - the Consistency of TSs to Exelon Generation Company Quality Assurance TR (Tac. MD3937 Thru MD3940 and MD3943 Thru MD3948). - Rplacement Pages RS-07-157, Request for Technical Specification Change for Minimum Power Ratio Safety Limit2007-11-20020 November 2007 Request for Technical Specification Change for Minimum Power Ratio Safety Limit 2024-08-08 |
Text
SLs 2.0 2.0 SAFETY LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs 2.1.1.1 With the reactor steam dome pressure < 785 psig or core flow < 10% rated core flow:
THERMAL POWER shall be ! 25% RTP.
2.1.1.2 With the reactor steam dome pressure Ž 785 psig and core flow Ž 10% rated core flow:
For Unit 1, with Cycle 17A exposure less than or equal to 4,000 MWD/MT, for two recirculation loop operation, MCPR sha'l be ? 1.11, or for single recirculation loop operation, MCPR shall be Ž 1.12. For Unit 1, with Cycle 17A exposure greater than 4,000 MWD/MTU, for two recirculation loop operation MCPR shall be > 1.15, or for single recirculation loop operation MCPR shall be > 1.16.
For Unit 2, MCPR shall be Ž 1.11 for two recirulation loop operation, or for single recirculation loop operation, MCPR shall be ? 1.12.
2.1.1.3 Reactor vessel water level shall be greater than the top of active irradiated fuel.
2.1.2 Reactor Coolant System Pressure SL Reactor steam dome pressure shall be 5 1345 psig.
2.2 SL Violations With any SL violation, the following actions shall be completed within 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s:
2.2.1 Restore compliance with all SLs; and 2.2.2 Insert all insertable control rods.
Quad Cities 1 and 2 2.0-1 Amendment No. 207/202