Technical Specifications, Correction to License Amendmnent No. 139
ML022610575
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 09/17/2002
From:
NRC/NRR/DLPM/LPD1
To:
References
TAC MB4685
Download: ML022610575 (3)


Text

Figure 3.4.6.1-1 Hydrostatic Pressure and Leak Tests Pressure/Temperature Limits - Curve A 1,200 I 1_*1,100.

All system leakage and hydrostatic c*1,000. pressure tests performed during the o service life of the pressure boundary

0. in compliance with ASME Code

-' 900 - - . - F- i + - I+- -- - -t -

ill Section Xl

) i --II - --

a-iI[IlItIlYtIl i+/-L --- _ _

-j UJ 800 11 I I JI Il'tiI+i4 w 700 0I-. 600 "U 500 z

1,_ 400 --

iw 300 D - Beitline U,

U) 200 Boltup 79°F 1--

"- - - Bottom Head I" 100 i  !  ! i i i i i i  ! . . . .

- -Upper Vessel

-II 0 . I . . .I i i i P, I I 0 50 100 150 200 250 MINIMUM REACTOR VESSEL METAL TEMPERATURE (-F) m Note: This figure is valid through Cycle 12 Operation in accordance with NRC Safety Evaluation Report supporting Amendment No. 139 HOPE CREEK 3/4 4-23 Amendment No. 139

Figure 3.4.6.1-2 Non-Nuclear Heatup and Cooldown Pressure/Temperature Limits - Curve B 1,200 S11J I I Tff7

-I-Ir - I. I-4-- -I - 0 - -t0 I--I--I- 11 4- 1- I -

I-I I

I 1,100 -- 4-- --

I

] -- t--t-1----I--r-1-1---i-r-1-r j

I Ii

  • I ] i S I I I I I I I ii I i

. 1,000 All heatup and cooldowns w that are performed when the

= 900 reactor is not critical at the 0.

0 normal heatup and cooldown i I Ii I FI- rate of 10(F/hr

'_j 800 I F (In (nUJ 700

,  ; I I IM I .

o 600 I I I0 4

W cc 500 - - - p r s z

I-. 400 wu 300 79 i i rvesi AW Beitline Cn cu 200 ILl

- - - - - - - - Bottom Head 100 0

0 50 100 150 200 250 MINIMUM REACTOR VESSEL METAL TEMPERATURE ('F)

Note: This figure is valid through Cycle 12 Operation with NRC Safety Evaluation Report supporting Amendment No. 139 HOPE CREEK 3/4 4-23a Amendment No. 139

Figure 3.4.6.1-3 Core Critical Heatup and Cooldown Pressure/Temperature Limits - Curve C 1,200 I

1,100 CL 1,000 All heatup and cooldowns that are performed when the reactor is critical 4

at the normal heatup and cooldown rate of 100-F/hr

= 900 0

800 8F

-j IJJ Lu gn 700 O 600 i--

u 500 z

1- 400

,-j uJ 300 n"

-normal water level 88*F U, 200 LU 100 0

0 50 100 150 200 250 MINIMUM REACTOR VESSEL METAL TEMPERATURE ('F)

Note: This figure is valid through Cycle 12 Operation in accordance with NRC Safety Evaluation Report supporting Amendment No. 139.

HOPE CREEK 3/4 4-23b Amendment No. 139