(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Letter Sequence Other |
---|
|
|
MONTHYEARML0222606802002-08-13013 August 2002 Technical Specifications for Amendment 139 Use of Existing Pressure-Temperature Curves Through Cycle 12 (Tac No. MB4685) Project stage: Other ML0215001502002-08-13013 August 2002 Issuance of License Amendment, Use of Existing Pressure-Temperature Curves Through Cycle 12 Project stage: Approval ML0226105752002-09-17017 September 2002 Technical Specifications, Correction to License Amendmnent No. 139 Project stage: Other ML0224902432002-09-17017 September 2002 Correction to License Amendmnent No. 139 Project stage: Other 2002-08-13
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML24145A1772024-07-15015 July 2024 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary ML24142A4422024-05-20020 May 2024 Enclosure 2: Hope Creek Generating Station Improved Technical Specifications Conversion - Volume 14 LR-N24-0004, License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-05-20020 May 2024 License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML24142A4312024-05-20020 May 2024 Enclosure 2: Hope Creek Generating Station Improved Technical Specifications Conversion - Volume 2 ML24142A4302024-05-20020 May 2024 Enclosure 2: Hope Creek Generating Station Improved Technical Specifications Conversion - Volume 1 ML24142A4322024-05-20020 May 2024 Enclosure 2: Hope Creek Generating Station Improved Technical Specifications Conversion - Volume 4 ML24142A4362024-05-20020 May 2024 Enclosure 2: Hope Creek Generating Station Improved Technical Specifications Conversion - Volume 8 ML24142A4332024-05-20020 May 2024 Enclosure 2: Hope Creek Generating Station Improved Technical Specifications Conversion - Volume 5 ML24142A4342024-05-20020 May 2024 Enclosure 2: Hope Creek Generating Station Improved Technical Specifications Conversion - Volume 6 ML24142A4352024-05-20020 May 2024 Enclosure 2: Hope Creek Generating Station Improved Technical Specifications Conversion - Volume 7 ML24142A4372024-05-20020 May 2024 Enclosure 2: Hope Creek Generating Station Improved Technical Specifications Conversion - Volume 9 ML24142A4382024-05-20020 May 2024 Enclosure 2: Hope Creek Generating Station Improved Technical Specifications Conversion - Volume 10 ML24142A4392024-05-20020 May 2024 Enclosure 2: Hope Creek Generating Station Improved Technical Specifications Conversion - Volume 11 ML24142A4402024-05-20020 May 2024 Enclosure 2: Hope Creek Generating Station Improved Technical Specifications Conversion - Volume 12 ML24142A4412024-05-20020 May 2024 Enclosure 2: Hope Creek Generating Station Improved Technical Specifications Conversion - Volume 13 ML24142A4432024-05-20020 May 2024 Enclosure 2: Hope Creek Generating Station Improved Technical Specifications Conversion - Volume 15 ML24142A4442024-05-20020 May 2024 Enclosure 2: Hope Creek Generating Station Improved Technical Specifications Conversion - Volume 16 LR-N24-0029, Enclosure 2: Hope Creek Generating Station Improved Technical Specifications Conversion - Volume 172024-05-20020 May 2024 Enclosure 2: Hope Creek Generating Station Improved Technical Specifications Conversion - Volume 17 ML24142A4462024-05-20020 May 2024 Enclosure 2: Hope Creek Generating Station Improved Technical Specifications Conversion - Volume 3 ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location ML21050A0022021-03-12012 March 2021 Issuance of Amendment No. 227 Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-582, RPV WIC Enhancements ML21047A3132021-03-10010 March 2021 Issuance of Amendment No. 226 Revise Emergency Core Cooling System Technical Specification for High Pressure Coolant Injection System Inoperability (Non-Proprietary) ML20281A6132020-11-0909 November 2020 Issuance of Amendment No. 225 Revise Technical Specification Actions for Suppression Pool Cooling ML20231A6322020-09-29029 September 2020 Issuance of Amendment No. 224 Regarding Adoption of 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components of Nuclear Power Reactors ML20034E6172020-02-27027 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 222, 333, and 314 Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer ML19186A2052019-08-0606 August 2019 Issuance of Amendment No. 217 Remote Shutdown System ML19065A1562019-03-27027 March 2019 Issuance of Amendment No. 215 Inverter Allowed Outage Time Extension ML17317A6052017-12-13013 December 2017 Issuance of Amendment, License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-535 ML17047A0202017-03-21021 March 2017 Issuance of Amendment to Delete Technical Specification Action Statement 3.4.2.1.b Associated with Stuck Open Safety/Relief Valves ML17053A1782017-03-15015 March 2017 Issuance of Amendment to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling ML16270A0382016-10-13013 October 2016 Issuance of Amendment No. 200 Safety Limit Minimum Critical Power Ratio Change ML15286A0912015-11-30030 November 2015 Issuance of Amendment Adoption of Technical Specifications Task Force Traveler-522 ML15141A2712015-06-17017 June 2015 and Salem Nuclear Generating Station, Unit Nos.1 and 2, Issuance of Amendments Update of Appendix B to the Renewed Facility Operating Licenses ML14108A3992014-12-18018 December 2014 Issuance of Amendment Request to Relocate Flood Protection Technical Specification to the Technical Requirements Manual LR-N14-0189, License Amendment Request to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process2014-11-25025 November 2014 License Amendment Request to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process ML14108A3122014-07-29029 July 2014 Issuance of Amendment Request to Relocate Safety Relief Valve Position Instrumentation to Technical Requirements Manual LR-N13-0155, License Amendment Request to Relocate the Flood Protection Technical Specification to the Technical Requirements Manual2013-09-0505 September 2013 License Amendment Request to Relocate the Flood Protection Technical Specification to the Technical Requirements Manual LR-N13-0143, License Amendment Request to Relocate Safety/Relief Valve Position Instrumentation to the Technical Requirements Manual2013-07-30030 July 2013 License Amendment Request to Relocate Safety/Relief Valve Position Instrumentation to the Technical Requirements Manual LR-N12-0067, License Amendment Request to Correct Technical Specification and Facility Operating License Editorial Items2012-03-0101 March 2012 License Amendment Request to Correct Technical Specification and Facility Operating License Editorial Items LR-N12-0028, Supplement to Application for Tech Spec Change TSTF-477 Rev. 3, Add Action for Two Inoperable Control Room AC Subsystems to the Tech Specs Using Consolidated Line Item Improvement Process2012-01-26026 January 2012 Supplement to Application for Tech Spec Change TSTF-477 Rev. 3, Add Action for Two Inoperable Control Room AC Subsystems to the Tech Specs Using Consolidated Line Item Improvement Process ML0527202982011-07-20020 July 2011 Current Facility Operating License NPF-57, Tech Specs, Revised 12/18/2017 ML11116A1482011-07-20020 July 2011 Issuance of Renewed Facility Operating License No. NPF-57 for Hope Creek Generating Station LR-N11-0208, Revised License Condition- Salem-Hope Creek Cyber Security Plan Supplement Submittal2011-07-0606 July 2011 Revised License Condition- Salem-Hope Creek Cyber Security Plan Supplement Submittal ML1109801512011-04-19019 April 2011 Correction to Amendment No. 187 Regarding Relocation of Specific Surveillance Frequencies to a Licensee-Controlled Program Based on Technical Specification Task Force (TSTF) Change TSTF-425 LR-N11-0098, Format and Editorial Corrections to Technical Specification Pages Issued with Amendment 1872011-04-0404 April 2011 Format and Editorial Corrections to Technical Specification Pages Issued with Amendment 187 LR-N11-0068, Application for Technical Specification Change TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems to the Technical Specifications Using Consolidated Line Item Improvement Process2011-02-28028 February 2011 Application for Technical Specification Change TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems to the Technical Specifications Using Consolidated Line Item Improvement Process LR-N10-0310, Supplement to License Amendment Request H09-06 to Adopt TSTF-460, Rev. 0, Control Rod Scram Times.2010-08-19019 August 2010 Supplement to License Amendment Request H09-06 to Adopt TSTF-460, Rev. 0, Control Rod Scram Times. ML1015907132010-07-21021 July 2010 Issuance of Amendment Control Rod Notch Testing Frequency LR-N10-0097, License Amendment Request: Emergency Diesel Generators a and B Allowed Outage Time Extension2010-03-29029 March 2010 License Amendment Request: Emergency Diesel Generators a and B Allowed Outage Time Extension 2024-07-15
[Table view] |
Text
Figure 3.4.6.1-1 Hydrostatic Pressure and Leak Tests Pressure/Temperature Limits - Curve A 1,200 I 1_*1,100.
All system leakage and hydrostatic c*1,000. pressure tests performed during the o service life of the pressure boundary
- 0. in compliance with ASME Code
-' 900 - - . - F- i + - I+- -- - -t -
ill Section Xl
) i --II - --
a-iI[IlItIlYtIl i+/-L --- _ _
-j UJ 800 11 I I JI Il'tiI+i4 w 700 0I-. 600 "U 500 z
1,_ 400 --
iw 300 D - Beitline U,
U) 200 Boltup 79°F 1--
"- - - Bottom Head I" 100 i ! ! i i i i i i ! . . . .
- -Upper Vessel
-II 0 . I . . .I i i i P, I I 0 50 100 150 200 250 MINIMUM REACTOR VESSEL METAL TEMPERATURE (-F) m Note: This figure is valid through Cycle 12 Operation in accordance with NRC Safety Evaluation Report supporting Amendment No. 139 HOPE CREEK 3/4 4-23 Amendment No. 139
Figure 3.4.6.1-2 Non-Nuclear Heatup and Cooldown Pressure/Temperature Limits - Curve B 1,200 S11J I I Tff7
-I-Ir - I. I-4-- -I - 0 - -t0 I--I--I- 11 4- 1- I -
I-I I
I 1,100 -- 4-- --
I
] -- t--t-1----I--r-1-1---i-r-1-r j
I Ii
- I ] i S I I I I I I I ii I i
. 1,000 All heatup and cooldowns w that are performed when the
= 900 reactor is not critical at the 0.
0 normal heatup and cooldown i I Ii I FI- rate of 10(F/hr
'_j 800 I F (In (nUJ 700
, ; I I IM I .
o 600 I I I0 4
W cc 500 - - - p r s z
I-. 400 wu 300 79 i i rvesi AW Beitline Cn cu 200 ILl
- - - - - - - - Bottom Head 100 0
0 50 100 150 200 250 MINIMUM REACTOR VESSEL METAL TEMPERATURE ('F)
Note: This figure is valid through Cycle 12 Operation with NRC Safety Evaluation Report supporting Amendment No. 139 HOPE CREEK 3/4 4-23a Amendment No. 139
Figure 3.4.6.1-3 Core Critical Heatup and Cooldown Pressure/Temperature Limits - Curve C 1,200 I
1,100 CL 1,000 All heatup and cooldowns that are performed when the reactor is critical 4
at the normal heatup and cooldown rate of 100-F/hr
= 900 0
800 8F
-j IJJ Lu gn 700 O 600 i--
u 500 z
1- 400
,-j uJ 300 n"
-normal water level 88*F U, 200 LU 100 0
0 50 100 150 200 250 MINIMUM REACTOR VESSEL METAL TEMPERATURE ('F)
Note: This figure is valid through Cycle 12 Operation in accordance with NRC Safety Evaluation Report supporting Amendment No. 139.
HOPE CREEK 3/4 4-23b Amendment No. 139