ML022610575
| ML022610575 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 09/17/2002 |
| From: | NRC/NRR/DLPM/LPD1 |
| To: | |
| References | |
| TAC MB4685 | |
| Download: ML022610575 (3) | |
Text
Figure 3.4.6.1-1 Hydrostatic Pressure and Leak Tests Pressure/Temperature Limits - Curve A 1,200 1_*1,100.
c*1,000.
- 0.
o 900 a-
-j 800 UJ w
700 0
600 I-.
"U 500 z
1,_
400 iw 300 D
U, U) 200 I"
100 0
I F-
+
+-
i
-t I
iI[IlItIlYtIl i+/-L 11 J
I I
I I l'tiI+i4 0
Boltup 79°F 50
-II 100 All system leakage and hydrostatic pressure tests performed during the service life of the pressure boundary in compliance with ASME Code Section Xl 150 Beitline Bottom Head
-Upper Vessel 200 250 MINIMUM REACTOR VESSEL METAL TEMPERATURE (-F)
Note:
This figure is valid through Cycle 12 Operation in accordance with NRC Safety Evaluation Report supporting Amendment No. 139 Amendment No. 139 ill 1--
m i
i i
i i
i i
I
.I i i i P, I I
) i I -
I HOPE CREEK 3/4 4-23
Figure 3.4.6.1-2 Non-Nuclear Heatup and Cooldown Pressure/Temperature Limits - Curve B Tff7 1
I-I -I - I. - -I - -I--I-
-I -
-4 I- -
-t 1
4-1 -
I I
I I I
-- t--t-1----I--r-1-1---i-r-1-r I
50 1,200 1,100 1,000 w
=
900
- 0.
0 800
_j (In (n
700 UJ o
600 I0 4 W 500 cc z
I-.
400 wu 300 Cn cu 200 ILl 100 100 S11J S
]
i All heatup and cooldowns that are performed when the reactor is not critical at the normal heatup and cooldown rate of 10(F/hr AW Beitline
- Bottom Head p
r s
79 i
i rvesi 150 200 250 MINIMUM REACTOR VESSEL METAL TEMPERATURE ('F)
This figure is valid through Cycle 12 Operation with NRC Safety Evaluation Report supporting Amendment No. 139 Amendment No. 139 4--
I i
I F
i I I i I
0 0
Note:
I I
r I
0 0
I
]
j i
I I
I M I
I I
I I
I I
I i i FI -
I I
3/4 4-23a HOPE CREEK
Figure 3.4.6.1-3 Core Critical Heatup and Cooldown Pressure/Temperature Limits - Curve C 1,200 1,100 CL 1,000
=
900 0
8F 800 IJJ
-j Lu gn 700 O
600 i--
u 500 z
1-400
,-j uJ 300 n"
U, 200 LU 100 0
50 100 150 I
4 200 250 MINIMUM REACTOR VESSEL METAL TEMPERATURE ('F)
This figure is valid through Cycle 12 Operation in accordance with NRC Safety Evaluation Report supporting Amendment No. 139.
Amendment No. 139 All heatup and cooldowns that are performed when the reactor is critical at the normal heatup and cooldown rate of 100-F/hr
-normal water level 88*F 0
Note:
HOPE CREEK 3/4 4-23b