ML023380791

From kanterella
Revision as of 19:11, 24 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Retake Examination Corporate Notification Letter No. 50-20/OL-03-01, Massachusetts Institute of Technology
ML023380791
Person / Time
Site: MIT Nuclear Research Reactor
Issue date: 12/09/2002
From: Doyle P
NRC/NRR/DRIP/RORP
To: Bernard J
Massachusetts Institute of Technology (MIT)
Doyle P, NRC/NRR/DRIP/RORP, 415-1058
Shared Package
ML023380787 List:
References
50-020/OL-03-01 50-020/OL-03-01
Download: ML023380791 (3)


Text

December 9, 2002 Dr. John Bernard, Director of Reactor Operations Nuclear Reactor Laboratory Massachusetts Institute of Technology 138 Albany Street Cambridge, MA 02139

SUBJECT:

RETAKE EXAMINATION CORPORATE NOTIFICATION LETTER NO. 50-20/OL-03-01, MASSACHUSETTS INSTITUTE OF TECHNOLOGY

Dear Dr. Bernard:

I made arrangements with Thomas Newton, for the administration of an operator licensing retake examination at the Massachusetts Institute of Technology reactor. The operating test is scheduled for January 28, 2002. I will use the facility material you provided for the last examination to prepare the retake examination. If you have any changes in the material, please furnish it as soon as possible to the following address:

(U.S. Postal Service) (Overnight Delivery)

U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission ATTN: Paul V. Doyle Jr. ATTN: Paul V. Doyle Jr.

Mail Stop O-12 G-13 Mail Stop O-12 G-13 Washington, D.C. 20555 11555 Rockville Pike Rockville, MD 20852-2738 Please submit the final, signed operator license application certifying that all training has been completed at least 14 days before the examination date. This will allow us to review the training of the candidate since the last exam, process the medical certification, if necessary, and process the application. If our review cannot be completed in time to make a determination of eligibility, the candidate may not be permitted to sit for the examination. Therefore, it is recommended that license applications be provided as soon as possible to ensure an appropriate level of review.

This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0018 which expires April 30, 2003. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, xeroxing and mailing the required material. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Records Branch, T-6 E-6, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001; or by Internet electronic mail to <bjs1@nrc.gov>, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018) Office of Management and Budget, Washington, D.C. 20503.

Dr. J. Bernard If you have any questions regarding the examination procedures and requirements, please contact me at (301) 415-1058, or Internet e-mail pvd@nrc.gov.

Sincerely,

/RA/

Paul V. Doyle Jr., Chief Examiner Non-Power Reactors Section Operating Reactor Improvements Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket No.: 50-20 cc w/encls: Ed Lau, Massachusetts Institute of Technology Thomas Newton, Massachusetts Institute of Technology

Dr. J. Bernard December 9, 2002 If you have any questions regarding the examination procedures and requirements, please contact me at (301) 415-1058, or Internet e-mail pvd@nrc.gov.

Sincerely,

/RA/

Paul V. Doyle Jr., Chief Examiner Non-Power Reactors Section Operating Reactor Improvements Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket No.: 50-20 cc w/encls: Ed Lau, Massachusetts Institute of Technology Thomas Newton, Massachusetts Institute of Technology DISTRIBUTION:

PUBLIC RORP\R&TR r/f PMadden WBeckner Facility File (EBarnhill) O-6 D-17 AAdams, PM ADAMS ACCESSION #: ML023380791 TEMPLATE # NRR-079 OFFICE RORP:CE C IEHB:LA C RORP:SC C NAME EBarnhill PMadden DATE 12/ 04 /2002 12/ 09 /2002 12/ 09 /2002 C=COVER E=COVER & ENCLOSURE N=NO COPY

OFFICIAL RECORD COPY