ML051460517

From kanterella
Revision as of 23:48, 23 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Condition Report, CAP055986 Evaluate Use of RP Greeter at Containment Hatches During Outage Periods with R. Alexander'S (Riii) Notes
ML051460517
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/23/2004
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
CAP055986, FOIA/PA-2004-0282
Download: ML051460517 (1)


Text

TeamTrack Reports Page 2o£5 I NMC >t si> Polnt Beach - Actlon Request ?Corrective Actn Program (CAP) AR Section 1 Activity Reques Id: CAP055986 Activity.Type: CAP Submit Date: 412312004 11:18:23 AM

@ One.lIne 6escriptilon: Evaluate use of RP Greeter at Containment hatches durincI outage periods-Z, Detailed

Description:

4/2312004 11:18:23 AM -THOMAS, STU:

During a region IiI NRC RP inspection, the Inspector comrr iented that he Is used to seeing other plahts usirlg ah RPT as a greeter at the containment hatches. The greter typlcally challenges radworkers prior to enter ng .containment to ensure proper 1dresisPut; proper':iosimetry, proper RWP, and direction with whom to check in with from RP in ;Ide containment Itwas.further commented at the exit by the site's senlor resident lnsiectcor, that Ifwe'd hiale had this In place through out this outage, we could have potentially preventeed the.rad event of having an IfidiYdual receive a dose' alarm while working in containme ent'on a PAB RWP.

Initiator THiOMAS, STU inItiatorDepartment: PR Radiation Protection PB I Datelime of Discovery: 412312004 1i:09:42 .DatelTimeof Occurrence: 4/2312004 11:09:42 AM AM Identified By: mRd System: (Nonej EqUIpment # (1st): '(Ndn) Equilpmlenit Type (1st): (Nobne)

Equipmrent #(2nd): (None) Equipment Type (2nd): *(None)

Equlpmeht # (3rd): (None) Equlpmnent Type (3rd): (None)

Site/Unit: Potnt Beach -

Common Why did this occur?: il3I004 11:18:23 Al.-THOMAS, STU:

pot ritaivyUiised .1'effl. arklnp. INPO also Dnote'd that RP was not effectively be'iehnc bWntlj'~rlg-tih B.b ,e~st, f p,~r'f~oiner'n industry.

Immediate Action TaIfen: 412312004 11:18:23AM -THOMAS. STU:

Wrte AR..

Recommendations: 4123/2004 11;18.23 AM - THOMAS, STU:

Peform a -condition evaluation, Develop guldance and station indfividual at the 66' hatch entrance.

Share thl AR wIth NMCfileet RPMs during weekly RPM phone call.

Wl Notify Me During Eval?: N 1 SRO ReYlow Required?: N Section 2 Operability Status: NA b Compensatory Actions: N Basis for Operability: 4/2312004 2:16:02'PM - RASACH, DEAN:

This Is a suggestion f6r.site Improvement. This issue does not affect the operability of Systems.

Slructures, or Components related to safety.

'§ Unplanned TSAC Entry: N CI External Notification: N