Text

MONITORING WELL STATUS (Wed, Dec 14,2005-1530 hrs) 1DX Well Location Status Next Samples Sample Result Number Step Taken (Highest Value)

MW-111 Transformer Yard Baseline Sample PT Continue to SampleWeekly 302,000 pCiJ/ (11/04/05)

MW-30 U-2 SFB Drille5lkeep Fully Developed Well Raw Water: 399,000 pCi/I (11/23/05)

Transducer installed Packer test Water: 600,000 pCi/l (11/24/05)

"Developed Well": Not ready for this sample MW-31 MOB side walk DrilleIoday Continue drilling MW-32 Need Eng Evaluation prior to U-2 SFB Alley Way Metal magnotometer indication in hole begin drilling &eo) --

MW-33 Transformer Yard Purging well Get water sample MW-34 Transformer Yard Well installed Sampled water-awaiting results MW-35 Transformer Yard Well installed Sampled water-awaiting results MW-36 U-2 Turbine Bldg Re-locating drill location Get engineering package out MW-37 U-2 Turbine Bldg Re-locating drill location Get engineering package out MW-38 South U-3 Boundary Well in service Continue periodic sampling Note:

  • We are using the vacuum truck on MW-32 to attempt to clear materiai in weji hole hole tha. may be on Lop of a Intluai objecL. This hole has bccn vacuumed approximately 7' down, but a magnetometer is indir-ating metal is in the vicinity of the probe at the 7'deep level. Will get engineering evaluation prior to drilling for status or determination of metv -<-ition.lnformation In thiS record waS &MO inaccordance Nr_W Iof b hmMPUs Ai FOWAwhan

MONITORING WELL STATUS (Nov. 28,2005)

ImIbr LcEEaiion

'-'A

'.,LUuS Saiiijle Rn buiR Number Stev Taken (Hii~hest Value)

MW-111 Transformer Yard Baseline Sample Pt Continue to Sample Weekly 302,000 pCi/l (11/04/05)

MW-30 U-2 SFB Drilled 61' deep Fully Develop Well Raw Water: 399,000 pCi/l (11/23/05)

Packer test Water: 600,000 pCi/l (11/24/05)

"Developed Well": No ready yet for this sample MW-31 U-2 SFB Alley way No action yet Remove pavement Vacuum excavation Drill Well MW-32 U-2 MOB Sidewalk No action yet Remove pavement Vacuum excavation Drill well MW-33 Transformer Yard Vacuumed to bedrock Ready for Drilling MW-34 Transformer Yard Vacuumed to bedrock Ready for Drilling MW-35 Transformer Yard Vacuumed to bedrock Ready for Drilling MW-36 U-2 Turbine Bldg No action yet Jack Hammer pavemtent Vacuum excavation Drill Well LvI v .0 I U- Turbin S.out Bldg:

)

UI BoundIjUr Jo act HOn pcve n T tack TAU . r paement Vacuum excavation Drill Well MW-38 South U-3 Boundar y Jack Hammered pavement Vacuum excavation Drill Well