ML031970436
ML031970436 | |
Person / Time | |
---|---|
Site: | Arkansas Nuclear |
Issue date: | 07/09/2003 |
From: | Entergy Operations |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
006-01-0 OP-1903.021 | |
Download: ML031970436 (7) | |
Text
_N S. I; Arkansas Nuclear One - Administrative Services Document Control Wednesday, July 09, 2003 Document Update Notification COPYHOLDER NO: 103 TO: ANO-NRC (EMERGENCY RESPONSE COORD.) - WASHINGTON ADDRESS: OS-DOC CNTRL DESK MAIL STOP OPI-17 WASHINGTON DC 20555-DC DOCUMENTNO: OP-i903.021 TITLE. NORAM NATURAL GAS LINE RUPTURE CHANGE NO: 006-01-0 ADDITIONAL INFO:
!d,please sign, date, andreturn within 5 days.
O ANO-1 Docket 50-313 O ANO-2 Docket 50-368 Signature Date SIGNATURE CONFIRMS UPDATE HAS BEEN MADE RETURN TO:
ATTN: DOCUMENT CONTROL-(N-ADMIN-24)
ARKANSAS NUCLEAR ONE 1448 SR 333 'po RUSSELLVILLE, AR 72801
r -
ENTERGY OPERATIONS INCORPORATED ARKANSAS NUCLEAR ONE TITLE: NORAM NATURAL GAS LINE RUPTURE DOCUMENT NO. CHANGE NO.
1903.021 006-01-0 WORK PLAN EXP. DATE TC EXP. DATE N/A N/A SET # }b3SAFETY-RELATED IPTE 0YES ONO OYES ONO TEMP ALT OYES SINO When you see these TRAPS Get these TOOLS Time Pressure Effective Communication Distractionhlnterruption Questioning Attitude Multiple Tasks Placekeeping Overconfidence Self Check Vague or Interpretive Guidance Peer Check First Shift/Last Shift Knowledge Peer Pressure Procedures Change/Off Normal Job Briefing Physical Environment Coaching Mental Stress (Home or Work) Turnover VERIFIED BY DATE TIME FORM TITLE- FORM NO. I CHANGE NO.
VERIFICATION COVER SHEET I1000.006A 050-00-0
ENTERGY OPERATIONS INCORPORATED ARKANSAS NUCLEAR ONE Page 1 TITLE:NORAM NATURAL GAS LINE RUPTURE DOCUMENT NO. CHANGE NO.
1903.021 006-01-0 AFFECTED UNIT: 0D PROCEDURE D ELECTRONIC DOCUMENT SAFETY-RELATED 3 UNIT 1 0 UNIT 2 5 WORK PLAN, EXP. DATE 109 YES El NO TYPE OF CHANGE:
5 NEW 0 PC E TC El DELETION O REVISION 0D EZ EXP. DATE:
DOES THIS DOCUMENT:
- 1. Supersede or replace another procedure? El YES CNO (if YES, complete 1000.006B for deleted procedure.) (CAN058107)
- 2. Alter or delete an existing regulatory commitment? D YES l NO (If YES, coordinate with Licensing before implementing.) (OCNA128509)(0CAN049803)
- 3. Require a 50.59 review per L-101? (See also 1000.006, Attachment 15)
. (If 50.59 evaluation, OSRC review required.)
El YES 1 NO
- 4. Cause the MTCL to be untrue? (See Step 8.5 for details.) D YES lNO (If YES, complete 1000.009A) (1CAN108904. OCAN099001, OCNA128509, OCAN049803)
- 5. Create an Intent Change? DYES 0NO (If YES, Standard Approval Process required.)
- 6. Implement or change IPTE requirements? D YES 1 NO (If YES, complete 1000.143A. OSRC review required.)
- 7. Implement or change a Temporary Alteration? O YES O NO (If YES, then OSRC review required.)
Was the Master Electronic File used as the source document? ED YES 0 NO INTERIM APPROVAL PROCESS STANDARD APPROVAL PROCESS ORIGINATOR SIGNATURE: (Includes review of At. 13)DA ORIGINATOR SIGNATURE: nludes review of Al.13) DATE: - -
Print and Sign name: / PHONE #: Print and Sign name: Roger Freeman PHONE #: 4994 SUPERVISOR APPROVAL: * /L' / DATE: INDEPENDENT REVIEWER: DATE:
SRO UNIT ONE : DATE: ENGINEERING: DATE:
SRO uN.T-rWO:. DATE: QUALITY: DATE:
Interim approval allowed for non-intent changes requiring no UNIT SURVEILLANCE COORDINATOR (CNA049803): DATE:
50.59 evaluation that are stopping work in progress. _____
Standard Approval required for intent changes or changes requiring a 50.59 evaluation.
SWONLEAD f
\ )/TAE Po2I 1-3
- If change not required to support work in progress, QUALITY ASSURANCE: _J' DATE:
Department Head must sign. 4/7A
- If both units are affected by change, both SRO signatures OTHER SECTION LEADERS: DATE:
are required. (SRO signature required for safety related procedures only.) OTHER SECTION LEADERS: DATE:
OTHER SECTION LEADERS: DATE:
OTHER SECTION LEADERS: DATE:
OSRC AIR N/TECHNICAL REVIEWER: (CNA049312) D6T§: OTHER SECTION LEADERS: DATE:
f AL ki5PI wAL z Ad bbe:~ OTHER SECTION LEADERS: DATE:
REQUIRED EFFECI DATE: 7 OTHER SECTION LEADERS: DATE:
FORM TITLE: FORM NO. CHANGE NO.
PROCEDURE/WORK PLAN APPROVAL REQUEST 1000.006B 051-00-0l
r %
ENTERGY OPERATIONS INCORPORATED ARKANSAS NUCLEAR ONE TITLE:NORAM NATURAL GAS LINE RUPTURE NO.
DOCUMENT NO.
1903.021 ICHNGE006-01-0 OPROCEDURE OWORK PLAN, EXP. DATE PAGE 1 OF El ELECTRONIC DOCUMENT TYPE OF CHANGE:
El NEW 0 PC El TC O DELETION El REVISION 0 EZ EXP. DATE:_
AFFECTED SECTION: DESCRIPTION OF CHANGE: (For each change made, include sufficient detail to describe (Include step # if reason for the change.)
applicable)
Step 7.3.2 page 3 Added option 2 to telephone number to reflect the answering machines option to report a gas line rupture.
Step 7.3.5 Page 3 Changed Shift Superintendent to Shift Manager to reflect current title.
No 50.59 required as per LI-101.
FORM TITLE: FORM NO. CHANGE NO.
DESCRIPTION OF CHANGE 1000.006C 050-00-0
PROCJWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 1 of 3 1903.021 NORAM NATURAL GAS LINE RUPTURE CHANGE: 006-010 1.0 PURPOSE The purpose of this procedure is to describe the actions to be taken if the 10-inch NORAM natural gas line that traverses the site ruptures or a leak is discovered.
2.0 SCOPE This procedure is limited to response to NORAM natural gas line rupture due to the nature of the follow-up actions. The precautions, symptoms and immediate actions may apply to situations involving other gaseous fuels.
The NORAM gas line crosses Entergy property approximately 200 feet southwest of the Unit II cooling tower and crosses the Unit 1 discharge canal. The line is 10 inches in size and carries 475 psig to 500 psig gas pressure.
3.0 REFERENCES
3.1 References Used in Procedure Preparation:
3.1.1 Arkansas Nuclear One Unit 1 and Unit 2 Final Safety Analysis Reports.
3.1.2 Emergency Plan.
3.2 REFERENCES
USED IN CONJUNCTION WITH THIS PROCEDURE:
3.2.1 1903.010, "Emergency Action Level Classification" 3.2.2 1903.011, "Emergency Response/Notifications" 3.3 RELATED ANO PROCEDURES:
None 3.4 REGULATORY CORRESPONDENCE CONTAINING NRC COMMITMENTS WHICH ARE IMPLEMENTED IN THIS PROCEDURE:
None 4.0 DEFINITIONS None 5.0 RESPONSIBILITY AND AUTHORITY As described in Sections 7.2 and 7.3.
PROCJWORK PLAN NO. PROCEDURENORK PLAN TITLE: PAGE: 2 of 3 1903.021 NORAM NATURAL GAS LINE RUPTURE CHANGE: 006-01-0
.1" 6.0 LIMITS AND PRECAUTIONS 6.1 There should be no smoking or other open flames in the vicinity of the leak.
6.2 Leaking natural gas could be ignited by the corona on electric transmission lines or by automobile engine spark leaks.
7.0 INSTRUCTIONS 7.1 SYMPTOMS 7.1.1 Small Gas Leaks A. Dead Grass B. Ground cracked and gray in color C. Bubbles in wet places D. Bubbles toward the end of the discharge canal E. Gaseous Odors 7.1.2 Large Gas Leaks A. Audible sound ranging in magnitude from a hissing sound to a roar.
B. Hole in the ground with blowing dust and other debris 7.2 IMMEDIATE ACTIONS 7.2.1 Personnel should immediately extinguish all smoking materials and exit the area by the most direct means.
7.2.2 Personnel should immediately notify either Control Room of the leak and remain available to prevent unsuspecting persons from approaching the area.
7.3 FOLLOW-UP ACTIONS 7.3.1 Control room personnel should announce the following message on the public address system:
MESSAGE: "Attention all personnel Attention all personnel A NORAM Natural Gas Line Rupture has occurred in the ... (location)... due to
... (nature of rupture) ... All personnel stay clear of the area."
PROCJWORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 3 of3 1903.021 NORAM NATURAL GAS LINE RUPTURE CHANGE: 006-01-0 7.3.2 The Control Room should notify the NORAM Energy Corporation by telephone as follows: 1-800-230-8004 - option 2 7.3.3 Shift operations personnel not involved with controlling the emergency should report to the Control Room.
7.3.4 The notified Shift Superintendent should designate personnel to cordon off the area, maintain surveillance and warn others that may approach the affected area.
7.3.5 The Shift Manager shall declare a Notification of Unusual Event Emergency Class if a plant evacuation is required as a result of the release as required by procedure 1903.010, "Emergency Action Level Classification".
8.0 ATTACHMENTS AND FORMS None