MONTHYEARML0409905442004-04-0808 April 2004 Notice of Consideration of Issuance of Amendment Re. Control Room Air-conditioning System Project stage: Other ML0415303182004-05-21021 May 2004 Tech Spec Pages for Amendment Nos. 292 & 282 One-Time Temporary Revision of Control Room Air-Conditioning System Project stage: Other ML0415303122004-05-21021 May 2004 Tech Spec Pages for Amendment Nos. 292 & 282 One-Time Temporary Revision of Control Room Air-Conditioning System Project stage: Other ML0414605342004-05-21021 May 2004 Amendment Nos. 292 & 282 Re One-Time Temporary Revision of Control Room Air-Conditioning System Project stage: Other 2004-04-08
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML22348A0052023-01-25025 January 2023 Issuance of Amendment Nos. 326, 349, and 309; 363 and 35; 159 and 67 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22349A6472023-01-20020 January 2023 Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules ML22276A1612022-10-24024 October 2022 Issuance of Amendment Nos. 359, 353, 155, & 63 Regarding Adoption of TSTF Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22259A2042022-09-29029 September 2022 Correction to Amendment Nos. 358 and 352 Regarding Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B CNL-22-030, Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03)2022-07-27027 July 2022 Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) ML21084A1902021-05-0404 May 2021 Issuance of Amendment Nos. 355 and 348 Regarding Revision to Technical Specification Table 3.3.3-1, Post Accident Monitoring Instrumentation ML21021A3492021-03-0303 March 2021 Issuance of Amendment Nos. 354 and 347 Regarding Revision to Technical Specification 4.2.2, Control Rod Assemblies ML20282A3452020-11-19019 November 2020 Issuance of Amendment Nos. 313, 336, 296, 350, 344, 138, and 44 Revise Emergency Plan On-Shift Emergency Medical Technician & Onsite Ambulance Requirements ML19319C8312019-11-21021 November 2019 Issuance of Exigent Amendment No. 348 to Operate One Cycle with One Control Rod Removed ML18277A1102019-08-27027 August 2019 Units, 1 & 2 Issuance of Amendment Nos. 309, 332, 292, 345, 339, 128, and 31 Regarding Unbalanced Voltage Protection CNL-16-178, Response to Request for Additional Information (RAI) Regarding Application to Modify Technical Specifications Regarding Diesel Generator Steady State Frequency (SQN-TS-14-02)2016-12-23023 December 2016 Response to Request for Additional Information (RAI) Regarding Application to Modify Technical Specifications Regarding Diesel Generator Steady State Frequency (SQN-TS-14-02) CNL-16-086, Response to Request for Additional Information Technical Specifications 3.7.8 Change - Essential Raw Cooling Water System2016-05-31031 May 2016 Response to Request for Additional Information Technical Specifications 3.7.8 Change - Essential Raw Cooling Water System ML15320A2182015-11-30030 November 2015 Issuance of Amendments to Revise Technical Specification for Containment Leakage Rate Program ML15310A0422015-11-0404 November 2015 License Amendment Nos. 334 and 327, Improved Technical Specifications, Implementation CNL-15-218, Application to Revise Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program, (SQN-TS-14-03) (TAC Nos. MF5366 and MF5367), Supplement to Response to Request for Additional Information2015-10-23023 October 2015 Application to Revise Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program, (SQN-TS-14-03) (TAC Nos. MF5366 and MF5367), Supplement to Response to Request for Additional Information ML15238B4602015-09-30030 September 2015 Issuance of Amendments for the Conversion to the Improved Technical Specifications with Beyond Scope Issues CNL-15-163, Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Proposed License Conditions2015-08-0505 August 2015 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Proposed License Conditions NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 3 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 3 of 9 ML15205A4142015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 9 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 4 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 4 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 5 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 5 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 6 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 6 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 7 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 7 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 8 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 8 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 2 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 2 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 1 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 1 of 9 CNL-15-156, Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 1 of 92015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 1 of 9 ML15205A4062015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 2 of 9 ML15205A4072015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 3 of 9 ML15205A4082015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 4 of 9 ML15205A4092015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 5 of 9 ML15205A4112015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 6 of 9 ML15205A4122015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 7 of 9 ML15205A4132015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 8 of 9 ML13330A9242013-11-22022 November 2013 Enclosure 2 - Volume 12 - Improved Technical Specifications Conversion, ITS Section 3.7, Plant Systems ML13330A9272013-11-22022 November 2013 Enclosure 2 - Volume 13 - Improved Technical Specifications Conversion, ITS Section 3.8, Electrical Power Systems ML13329A7182013-11-22022 November 2013 Enclosure 1 - Improved Technical Specifications (ITS) Submittal, Enclosure 3 - Licensee Identified Changes That May Require a Formal Technical Branch Review Through Enclosure 10 ML13330A9282013-11-22022 November 2013 Enclosure 2 - Volume 9 - Improved Technical Specifications Conversion, ITS Section 3.4, Reactor Coolant System (Rcs), Revision 0 ML13329A7902013-11-22022 November 2013 Enclosure 2 - Volume 3 - Improved Technical Specifications Conversion, ITS Chapter 1.0, Use and Application, Revision 0 ML13330A9312013-11-22022 November 2013 Enclosure 2 - Volume 11 - Improved Technical Specifications Conversion, ITS Section 3.6, Containment Systems ML13330A9532013-11-22022 November 2013 Enclosure 4, Attachments 3, 4 and 5, Reactor Trip System (RTS) and Engineered Safety Fatures Actuation System (ESFAS) Instrumentation Completion Times, Bypass Times, and Surveillance Test Interval Extensions Based On.. ML13330A9302013-11-22022 November 2013 Enclosure 2 - Volume 14 - Improved Technical Specifications Conversion, ITS Section 3.9 Refueling Operations ML13330A9292013-11-22022 November 2013 Enclosure 2 - Volume 10 - Improved Technical Specifications Conversion, ITS Section 3.5, Emergency Core Cooling Systems (Eccs), Revision 0 ML13330A9252013-11-22022 November 2013 Enclosure 2 - Volume 15 - Improved Technical Specifications Conversion, ITS Chapter 4.0, Design Features, Revision 0 ML13330A9222013-11-22022 November 2013 Enclosure 2 - Volume 16 - Improved Technical Specifications Conversion, ITS Chapter 5.0 Administrative Controls, Revision 0 ML13329A9162013-11-22022 November 2013 Sequoyah, Units 1 and 2, Enclosure 2 - Volume 6 - Improved Technical Specifications Conversion, ITS Section 3.3 Instrumentation, Revision 0 ML13329A8592013-11-22022 November 2013 Enclosure 2 - Volume 7 - Improved Technical Specifications Conversion, ITS Section 3.2 Power Distribution Limits, Revision 0 ML13329A8582013-11-22022 November 2013 Enclosure 2 - Volume 6 - Improved Technical Specifications Conversion, ITS Section 3.1 Reactivity Control Systems, Revision 0 2024-01-29
[Table view] |
Text
s. Primary Coolant Outside Containment (Section 22.2, III.D.1.1)
Prior to exceeding 5 percent power level, TVA is required to complete the leak tests on Unit 2, and results are to be submitted within 30 days from the completion of the testing.
(17) Surveillance Interval Extension The performance interval for the 36-month surveillance requirements in TS 4.3.2.1.3 shall be extended to May 18, 1996, to coincide with the Cycle 7 refueling outage.
The extended interval shall not exceed a total of 50 months for the 36-month surveillances.
(18) Mixed Core DNBR Penalty TVA will obtain NRC approval prior to startup for any cycle's core that involves a reduction in the departure from nucleate boiling ratio initial transition core penalty below that value stated in TVA's submittal on Framatome fuel conversion dated April 6, 1997.
(19) Steam Generator Replacement Project During the Unit 1 Cycle 12 refueling and steam generator replacement outage, lifts of heavy loads will be performed in accordance with Table 3.1 of NRC Safety Evaluation dated March 26, 2003.
(20) Control Room Air-Conditioning System Maintenance TVA commits to the use of a portable chiller package and air-handling unit to provide alternate cooling if both trains of the control room air condition system become inoperable during the maintenance activities to upgrade the compressors and controls or immediately enter Technical Specification 3.0.3.
D. Exemptions from certain requirements of Appendices G and J to 10 CFR Part 50 are described in the Office of Nuclear Reactor Regulation's Safety Evaluation Report, Supplements No. 1 and No. 5.
These exemptions are authorized by law and will not endanger life or property or the common defense and security and are otherwise in the public interest. Therefore, these exemptions are hereby granted. The facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission.
A temporary exemption from General Design Criterion 57 found in Appendix A to 10 CFR part 50 is described in the Office of Nuclear Reactor Regulation's Safety Evaluation Report, Supplement No. 5, Section 6.2.4. This exemption is authorized by law and will not endanger life or property or the common defense and security and is otherwise in the public interest. The exemption, therefore, is hereby granted and shall remain in effect through the first refueling outage as discussed in Section 6.2.4 of Supplement 5 to the Safety Evaluation Report. The granting of the exemption is authorized with the issuance of the Facility Operating License. The facility will operate, to the extent authorized herein, in conformity with the application as amended, the provisions of the Act, and the regulations of the Commission. Additional Exemptions are listed in Attachment 2.
E. Physical Protection The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revision to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR March 26, 2003 Amendment No. 65,162,170, 204, 214, 273, 282
50.90 and 10 CFR 50.54(p). The Safeguards Contingency Plan is incorporated into the Physical Security Plan. The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: "Sequoyah Physical Security Plan,' with revisions submitted through November 23, 1987; and uSequoyah Security Personnel Training and Qualification Plan," with revisions submitted through April 16, 1987.
Changes made in accordance with 10 CFR 73.55 shall be implemented in accordance with the schedule set forth therein.
F. Reactor Safetv Methodology Applications Programs (Section 24.0)
TVA will provide a report prepared by the Kaman Sciences Corporation (KSC) on a full scale nuclear safety and availability analysis within six months from the date of the KSC report.
G. This amended license is subject to the following additional condition for the protection of the environment:
Before engaging in additional construction or operational activities which may result in an environmental impact that was not evaluated by the Commission, Tennessee Valley Authority will prepare and record an environmental evaluation of such activity.
When the evaluation Indicates that such activity may result in a significant adverse environmental impact that was not evaluated, or that is significantly greater than that evaluated in the Final Environmental Statement prepared by the Tennessee Valley Authority and the Environmental Impact Appraisal prepared by the Commission in May 1979, the Tennessee Valley Authority shall provide a written evaluation of such activities and obtain prior approval from the Director, Office of Nuclear Reactor Regulation.
H. Deleted I. TVA shall immediately notify the Commission of any accident at this facility which could result in an unplanned release of quantities of fission products in excess of allowable limits for normal operation established by the Commission.
J. TVA shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.
May 24, 2002 Amendment 2, 267, 282
PLANT SYSTEMS 3/4.7.15 CONTROL ROOM AIR-CONDITIONING SYSTEM (CRACS)
LIMITING CONDITION FOR OPERATION 3.7.15 Two independent control room air-conditioning systems (CRACS) shall be OPERABLE.
APPLICABILITY: ALL MODES and during movement of irradiated fuel assemblies ACTION:
MODES 1, 2, 3, or 4
- a. With one CRACS inoperable, restore the inoperable system to OPERABLE status within 30 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
- b. With both CRACS inoperable, immediately enter LCO 3.0.3.* I MODES 5 or 6, or during movement of irradiated fuel assemblies
- a. With one CRACS inoperable, restore the inoperable system to OPERABLE status within 30 days or initiate and maintain operation of the OPERABLE CRACS or suspend movement of irradiated fuel assemblies.
- b. With both CRACS inoperable, suspend movement of irradiated fuel assemblies.
SURVEILLANCE REQUIREMENTS 4.7.15 Each CRACS shall be demonstrated OPERABLE:
- a. At least once per 18 months by verifying each CRACS train has the capability to remove the assumed heat load.
- An allowance to monitor control room temperature every four hours and verify less than or equal to 90 degrees Fahrenheit is permitted for up to seven days in lieu of the immediate entry into LCO 3.0.3. If control room temperature exceeds 90 degrees Fahrenheit or the duration without a train of CRACS being OPERABLE exceeds seven days, the immediate entry into LCO 3.0.3 will be required. This provision is only applicable during maintenance activities planned for the upgrade of the CRACS compressors and controls and expires on March 31, 2005.
SEQUOYAH - UNIT 2 3/4 7-55 Amendment No. 262, 282