Letter Sequence Approval |
---|
TAC:MC2446, Eliminate the 12 Hour Cot on Power Range and Intermediate Range Channels for Physics Test Exceptions (Approved, Closed) TAC:MC2447, Eliminate the 12 Hour Cot on Power Range and Intermediate Range Channels for Physics Test Exceptions (Approved, Closed) |
|
MONTHYEARML0407608862004-03-0505 March 2004 Technical Specifications (TS) Change 03-05, Physics Tests Exceptions and Refueling Operations. Project stage: Request ML0427103122004-09-20020 September 2004 Technical Specification Changes for Sequoyah, Units 1 and 2 - Issuance of Amendments Regarding Physics Test Exceptions and Refueling Operations Project stage: Approval ML0426605612004-09-20020 September 2004 Issuance of Amendments Regarding Technical Specification Changes for Physics Test Exceptions and Refueling Operations Project stage: Approval 2004-03-05
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML22348A0052023-01-25025 January 2023 Issuance of Amendment Nos. 326, 349, and 309; 363 and 35; 159 and 67 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22349A6472023-01-20020 January 2023 Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules ML22276A1612022-10-24024 October 2022 Issuance of Amendment Nos. 359, 353, 155, & 63 Regarding Adoption of TSTF Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22259A2042022-09-29029 September 2022 Correction to Amendment Nos. 358 and 352 Regarding Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B CNL-22-030, Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03)2022-07-27027 July 2022 Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) ML21084A1902021-05-0404 May 2021 Issuance of Amendment Nos. 355 and 348 Regarding Revision to Technical Specification Table 3.3.3-1, Post Accident Monitoring Instrumentation ML21021A3492021-03-0303 March 2021 Issuance of Amendment Nos. 354 and 347 Regarding Revision to Technical Specification 4.2.2, Control Rod Assemblies ML20282A3452020-11-19019 November 2020 Issuance of Amendment Nos. 313, 336, 296, 350, 344, 138, and 44 Revise Emergency Plan On-Shift Emergency Medical Technician & Onsite Ambulance Requirements ML19319C8312019-11-21021 November 2019 Issuance of Exigent Amendment No. 348 to Operate One Cycle with One Control Rod Removed ML18277A1102019-08-27027 August 2019 Units, 1 & 2 Issuance of Amendment Nos. 309, 332, 292, 345, 339, 128, and 31 Regarding Unbalanced Voltage Protection CNL-16-178, Response to Request for Additional Information (RAI) Regarding Application to Modify Technical Specifications Regarding Diesel Generator Steady State Frequency (SQN-TS-14-02)2016-12-23023 December 2016 Response to Request for Additional Information (RAI) Regarding Application to Modify Technical Specifications Regarding Diesel Generator Steady State Frequency (SQN-TS-14-02) CNL-16-086, Response to Request for Additional Information Technical Specifications 3.7.8 Change - Essential Raw Cooling Water System2016-05-31031 May 2016 Response to Request for Additional Information Technical Specifications 3.7.8 Change - Essential Raw Cooling Water System ML15320A2182015-11-30030 November 2015 Issuance of Amendments to Revise Technical Specification for Containment Leakage Rate Program ML15310A0422015-11-0404 November 2015 License Amendment Nos. 334 and 327, Improved Technical Specifications, Implementation CNL-15-218, Application to Revise Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program, (SQN-TS-14-03) (TAC Nos. MF5366 and MF5367), Supplement to Response to Request for Additional Information2015-10-23023 October 2015 Application to Revise Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program, (SQN-TS-14-03) (TAC Nos. MF5366 and MF5367), Supplement to Response to Request for Additional Information ML15238B4602015-09-30030 September 2015 Issuance of Amendments for the Conversion to the Improved Technical Specifications with Beyond Scope Issues CNL-15-163, Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Proposed License Conditions2015-08-0505 August 2015 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Proposed License Conditions NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 3 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 3 of 9 ML15205A4142015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 9 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 4 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 4 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 5 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 5 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 6 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 6 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 7 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 7 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 8 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 8 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 2 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 2 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 1 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 1 of 9 CNL-15-156, Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 1 of 92015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 1 of 9 ML15205A4062015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 2 of 9 ML15205A4072015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 3 of 9 ML15205A4082015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 4 of 9 ML15205A4092015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 5 of 9 ML15205A4112015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 6 of 9 ML15205A4122015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 7 of 9 ML15205A4132015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 8 of 9 ML13330A9242013-11-22022 November 2013 Enclosure 2 - Volume 12 - Improved Technical Specifications Conversion, ITS Section 3.7, Plant Systems ML13330A9272013-11-22022 November 2013 Enclosure 2 - Volume 13 - Improved Technical Specifications Conversion, ITS Section 3.8, Electrical Power Systems ML13329A7182013-11-22022 November 2013 Enclosure 1 - Improved Technical Specifications (ITS) Submittal, Enclosure 3 - Licensee Identified Changes That May Require a Formal Technical Branch Review Through Enclosure 10 ML13330A9282013-11-22022 November 2013 Enclosure 2 - Volume 9 - Improved Technical Specifications Conversion, ITS Section 3.4, Reactor Coolant System (Rcs), Revision 0 ML13329A7902013-11-22022 November 2013 Enclosure 2 - Volume 3 - Improved Technical Specifications Conversion, ITS Chapter 1.0, Use and Application, Revision 0 ML13330A9312013-11-22022 November 2013 Enclosure 2 - Volume 11 - Improved Technical Specifications Conversion, ITS Section 3.6, Containment Systems ML13330A9532013-11-22022 November 2013 Enclosure 4, Attachments 3, 4 and 5, Reactor Trip System (RTS) and Engineered Safety Fatures Actuation System (ESFAS) Instrumentation Completion Times, Bypass Times, and Surveillance Test Interval Extensions Based On.. ML13330A9302013-11-22022 November 2013 Enclosure 2 - Volume 14 - Improved Technical Specifications Conversion, ITS Section 3.9 Refueling Operations ML13330A9292013-11-22022 November 2013 Enclosure 2 - Volume 10 - Improved Technical Specifications Conversion, ITS Section 3.5, Emergency Core Cooling Systems (Eccs), Revision 0 ML13330A9252013-11-22022 November 2013 Enclosure 2 - Volume 15 - Improved Technical Specifications Conversion, ITS Chapter 4.0, Design Features, Revision 0 ML13330A9222013-11-22022 November 2013 Enclosure 2 - Volume 16 - Improved Technical Specifications Conversion, ITS Chapter 5.0 Administrative Controls, Revision 0 ML13329A9162013-11-22022 November 2013 Sequoyah, Units 1 and 2, Enclosure 2 - Volume 6 - Improved Technical Specifications Conversion, ITS Section 3.3 Instrumentation, Revision 0 ML13329A8592013-11-22022 November 2013 Enclosure 2 - Volume 7 - Improved Technical Specifications Conversion, ITS Section 3.2 Power Distribution Limits, Revision 0 ML13329A8582013-11-22022 November 2013 Enclosure 2 - Volume 6 - Improved Technical Specifications Conversion, ITS Section 3.1 Reactivity Control Systems, Revision 0 2024-01-29
[Table view] |
Text
REFUELING OPERATIONS 3/4.9.2 INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.9.2 As a minimum, two source range neutron flux monitors shall be OPERABLE and operating, each with continuous visual indication in the control room and one with audible indication in the containment and control room.
APPLICABILITY: MODE 6.
ACTION:
- a. With one of the above required monitors inoperable or not operating, immediately suspend all operations involving CORE ALTERATIONS and suspend operations that would cause introduction of coolant into the RCS with boron concentration less than required to meet LCO 3.9.1.
- b. With both of the above required monitors inoperable or not operating, determine the boron concentration of the reactor coolant system at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
- c. The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
SURVEILLANCE REQUIREMENTS 4.9.2 Each source range neutron flux monitor shall be demonstrated OPERABLE by performance of:
- a. A CHANNEL CHECK at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, and I
- b. A CHANNEL FUNCTIONAL TEST at least once per 7 days. I I
SEQUOYAH - UNIT 1 3/4 9-2 Amendment No. 12,146, 285, 295
SPECIAL TEST EXCEPTIONS 3/4.10.3 PHYSICS TESTS LIMITING CONDITION FOR OPERATION 3.10.3 The limitations of Specifications 3.1.1.3, 3.1.1.4, 3.1.3.1, 3.1.3.5 and 3.1.3.6 may be suspended during the performance of PHYSICS TESTS provided:
- a. The THERMAL POWER does not exceed 5% of RATED THERMAL POWER,
- b. The reactor trip setpoints on the OPERABLE Intermediate and Power Range Nuclear Channels low trip setpoints are set at less than or equal to 25% of RATED THERMAL POWER, and
- c. The Reactor Coolant System lowest operating loop temperature (Tavg) is greater than or equal to 531 OF.
APPLICABILITY: MODE 2.
ACTION:
- a. With the THERMAL POWER greater than 5% of RATED THERMAL POWER, immediately open the reactor trip breakers.
- b. With a Reactor Coolant System operating loop temperature (Tfg) less than 531 OF, restore Tavg to within its limits within 15 minutes or be in at least HOT STANDBY within the next 15 minutes.
SURVEILLANCE REQUIREMENTS 4.10.3.1 The THERMAL POWER shall be determined to be less than or equal to 5% of RATED THERMAL POWER at least once per hour during PHYSICS TESTS.
4.10.3.2 Each Intermediate and Power Range Channel shall be subjected to a CHANNEL FUNCTIONAL TEST prior to initiating PHYSICS TESTS.
4.10.3.3 The Reactor Coolant System temperature (T.,g) shall be determined to be greater than or equal to 5310 F at least once per 30 minutes during PHYSICS TESTS.
SEQUOYAH - UNIT 1 3/4 10-3 Amendment No. 295
SPECIAL TEST EXCEPTIONS 3/4.10.4 REACTOR COOLANT LOOPS LIMITING CONDITION FOR OPERATION 3.10.4 The limitations of Specification 3.4.1.1 may be suspended during the performance of startup and PHYSICS TESTS provided:
- a. The THERMAL POWER does not exceed the P-7 Interlock Setpoint, and
- b. The Reactor Trip Setpoints on the OPERABLE-intermediate and Power Range Channels are set less than or equal to 25% of RATED THERMAL POWER APPLICABILITY: During operation below the P-7 Interlock Setpoint.
ACTION:
With the THERMAL POWER greater than the P-7 Interlock Setpoint, immediately open the reactor trip breakers.
SURVEILLANCE REQUIREMENTS 4.10.4.1 The THERMAL POWER shall be determined to be less than P-7 Interlock Setpoint at least once per hour during startup and PHYSICS TESTS.
4.10.4.2 Each Intermediate, Power Range Channel and P-7 Interlock shall be subjected to a CHANNEL FUNCTIONAL TEST prior to initiating startup or PHYSICS TESTS.
SEQUOYAH - UNIT 1 3/4 10-4 Amendment No.295
3/4.9 REFUELING OPERATIONS BASES 3/4.9.1 BORON CONCENTRATION The limitations on reactivity conditions during REFUELING ensure that: 1) the reactor will remain subcritical during CORE ALTERATIONS, and 2) a uniform boron concentration is maintained for reactivity control in the water volume having direct access to the reactor vessel. Maintaining the listed valves in the closed position precludes an uncontrolled boron dilution accident by closing the flow paths for possible sources of unborated water. These limitations are consistent with the initial conditions assumed for the boron dilution incident in the accident analyses.
3/4.9.2 INSTRUMENTATION The OPERABILITY of the source range neutron flux monitors ensures that redundant monitoring capability is available to detect changes in the reactivity condition of the core. Testing within the required I frequency is sufficient for verification that the source range monitors are properly functioning.
3/4.9.3 DECAY TIME The minimum requirement for reactor subcriticality prior to movement of irradiated fuel assemblies in the reactor pressure vessel ensures that sufficient time has elapsed to allow the radioactive decay of the short lived fission products. This decay time is consistent with the assumptions used in the accident analyses.
3/4.9.4 CONTAINMENT BUILDING PENETRATIONS The requirements on containment building penetration closure and OPERABILITY ensure that a significant release of radioactive material within containment will be restricted from leakage to the environment. The OPERABILITY and closure restrictions are sufficient to restrict radioactive material release from a fuel element rupture based upon the lack of containment pressurization potential while in the REFUELING MODE. Containment penetrations that provide direct access from containment atmosphere to outside atmosphere must be isolated on at least one side during movement of irradiated fuel. The containment building equipment door must be closed during movement of recently irradiated fuel (i.e., fuel that has occupied part of a critical reactor core within the previous 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />). Isolation may be achieved by an OPERABLE automatic isolation valve, or by a manual isolation valve, blind flange, or equivalent. Equivalent isolation methods must be approved and may include use of a material that can provide a temporary, atmospheric pressure, ventilation barrier for containment penetrations during fuel movements. Both sets of the containment personnel airlock doors may be open during movement of irradiated fuel in containment provided one train of Auxiliary Building Gas Treatment System (ABGTS) is available for manual operation. The basis of this is that SON is analyzed for a fuel handling accident (FHA) in either the containment or the auxiliary building; however, a manual ABGTS start may be necessary for a containment FHA. The requirement for an airlock door to be capable of closure is provided to allow for long-term recovery from a FHA in containment.
During movement of irradiated fuel assemblies, a single normal or contingency method to promptly close the containment building equipment door will be in place. Such prompt methods need not completely block the penetration or be capable of resisting pressure. The purpose is to enable ventilation systems to draw the release from a postulated fuel handling accident in the proper directions such that it can be treated and monitored.
The LCO is modified by a footnote allowing penetration flow paths with direct access from the containment atmosphere to the Auxiliary Building Secondary Containment Enclosure (ABSCE) to be unisolated under administrative controls. These flow paths must be within the ABSCE structure or in qualified piping that constitutes the ABSCE boundary and either terminate or have an isolation device within the ABSCE. Administrative controls ensure that 1) appropriate personnel are aware of the open status of the penetration flow path during movement of Irradiated fuel assemblies within containment, 2) specified individuals are designated and readily available to isolate the flow path in the event of an FHA, and 3) one train of the ABGTS is OPERABLE in accordance with Technical Specification 3.9.12. As discussed above for the containment airlock doors, the basis for this allowance is the SQN analysis for an FHA in containment or the auxiliary building and the potential need for a manual start of the ABGTS for an FHA in containment. This allowance is not applicable to the containment ventilation isolation flow paths because of the potential motive force associated with the containment purge system that could result in additional releases of radioactivity. Additionally, this allowance is not applicable to those flow paths that terminate or are routed outside the ABSCE in piping that does not meet the requirements for an ABSCE boundary.
SEQUOYAH - UNIT 1 B 3/4 9-1 Amendment No. 209, 249, 260, 288,295
3/4.10 SPECIAL TEST EXCEPTIONS BASES 3/4.10.1 SHUTDOWN MARGIN This special test exception provides that a minimum amount of control rod worth is immediately available for reactivity control when tests are performed for control rod worth measurement. This special test exception is required to permit the periodic verification of the actual versus predicted core reactivity condition occurring as a result of fuel bumup or fuel cycling operations.
3/4.10.2 GROUP HEIGHT. INSERTION. AND POWER DISTRIBUTION LIMITS This special test exception permits Individual control rods to be positioned outside of their normal group heights and insertion limits during the performance of such PHYSICS TESTS as those required to
- 1) measure control rod worth and 2) determine the reactor stability index and damping factor under xenon oscillation conditions.
3/4.10.3 PHYSICS TESTS This special test exception permits PHYSICS TESTS to be performed at less than or equal to 5%
of RATED THERMAL POWER with the RCS TAVG slightly lower than normally allowed so that the fundamental nuclear characteristics of the reactor core and related instrumentation can be verified. In order for various characteristics to be accurately measured it is, at times, necessary to operate outside the normal restrictions of these technical Specifications. For instance, to measure the moderator temperature coefficient at BOL it is necessary to position various control rods at heights which may not normally be allowed by Specification 3.1.3.6 which may cause the RCS TAVG to fall slightly below the minimum temperature of Specification 3.1.1.4.
Testing performed pursuant to Specification 4.10.3.2 ensures that the intermediate and power range reactor trip functions which operate at less than or equal to 25% RATED THERMAL POWER are available to limit power excursions during PHYSICS TESTS. Testing within the required frequency is sufficient for verification that the power range and intermediate range monitors are properly functioning.
3/4.10.4 REACTOR COOLANT LOOPS This special test exception permits reactor criticality under no flow conditions and is required to perform certain startup and PHYSICS TESTS while at low THERMAL POWER levels. Testing within the required frequency is sufficient for verification that the power range and intermediate range monitors are properly functioning.
3/4 10.5 POSITION INDICATION SYSTEM-SHUTDOWN (This specification is deleted)
SEQUOYAH - UNIT 1 B 314 10-1 Amendment No. 264, 295