RNP-RA/04-0129, Response to Regulatory Issue Summary 2004-10, Preparation and Scheduling of Operator Licensing Examinations.

From kanterella
Revision as of 04:15, 16 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Response to Regulatory Issue Summary 2004-10, Preparation and Scheduling of Operator Licensing Examinations.
ML042880314
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 10/04/2004
From: Lucas J
Progress Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-04-010, RNP-RA/04-0129
Download: ML042880314 (3)


Text

C41 Progress Energy Serial: RNP-RA/04-0129 OCT 0 4 2004 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 RESPONSE TO REGULATORY ISSUE

SUMMARY

2004-10, "PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS" Ladies and Gentlemen:

H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, is providing a completed NRC Form 536, "Operator Licensing Examination Data," as an attachment to this letter. This completed form is being provided in accordance with NRC Regulatory Issue Summary 2004-10, "Preparation and Scheduling of Operator Licensing Examinations." Data estimates are provided for initial operator licensing examination needs, including intentions regarding preparation of the examinations and an estimate of the number of applicants to be examined.

If you have any questions concerning this matter, please contact Mr. C. T. Baucom at (843) 857-1253.

Sincerely CO-S Jan\ua Manager - Support Services - Nuclear JFL/cac Attachment c: NRC Resident Inspector, HBRSEP Dr. W. D. Travers, NRC, Region II Mr. M. E. Ernstes, NRC, Region II Mr. C. P. Patel, NRC, NRR Progress Energy Carolinas. Inc.

Robinson Nuclear Plant 3581 West Entranre Road Hartsville, SC 29550 00

United States Nuclear Regulatory Commission Attachment to Serial: RNP-RA/04-0129 2 Pages (including cover sheet)

H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 NRC Form 536, Operator Licensing Examination Data

NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO 3150-0131 EXPIRES 07/3112005 (5-2003) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records Management Branch (T-6 E6) U S Nuclear Regulatory Commssin, 0555000 byInternet email to EX(AMINATION DATA Inoolcsncgvadt h Reglatry EOB1022, ffa ekOfcr fieof Information and 315-011),Offceof Management and BudgtWshinton DC2050. I a eansuse toimpose an information coletion doeshinot display a c~urrently valid0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the Information collection.

FACILITY NRC REGION H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 H A. PROPOSED EXAMINATION PREPARATION SCHEDULE

- PROPOSED NUMBER -- CY 2005 --CY 2006 -CY 2007--- CY 2008 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSING EXAMINATIONS PROPOSED NUMBER CY 2005 CY 2006 CY 2007 CY 2008 NUMBER OF REACTOR 0 4 0 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS-INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 4 0 4 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE N/A 09/08/2006 N/A 06/01/2008 ALTERNATE DATE N/A 09/15/2006 N/A 06/08/2008 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2005 CY 2006 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 8 0 0 0 0 0 0