Exhibit List for April 2008 Evidentiary Hearing - Pilgrim Nuclear Power Station
ML081090243
Person / Time
Site: Pilgrim
Issue date: 04/10/2008
From:
Entergy Nuclear Generation Co, Entergy Nuclear Operations, NRC/OGC, Pilgrim Watch
To:
NRC/SECY/RAS
SECY RAS
References
50-293-LR, ASLBP 06-848-02-LR, RAS J-30
Download: ML081090243 (16)


Text

MAS ENTERGY NUCLEAR GENERATION COMPANY AND ENTERGY NUCLEAR OPERATIONS, INC. DOCKETED USNRC Pilgrim Nuclear Power Station Docket No. 50-293-LR; ASLBP No. 06-848-02-LR April 15, 2008 (10:00am)

April 10, 2008 OFFICE OF SECRETARY Exhibit List RULEMAKINGS AND

.ADJUDICATIONS STAFF OFFICIAL PARTY PARTY WITNESS/ IDENTIFIED ADMITTED Action:

EX# EXHIBIT TITLE NAME EX# PANEL DATE DATE L Admitted Rejected Withdrawn 1 Testimony of Alan Cox, Brian Sullivan, Steve Entergy 'A Cox / 4/10/08 4/10/08 Woods, and William Spataro on Pilgrim Sullivan /

Watch Contention 1, Regarding Adequacy of Woods /

Aging Management Program for Buried Pipes Spataro and Tanks and Potential Need for Monitoring Wells to Supplement Program, including the V Declarations and CVs of Alan B. Cox, Brian R. Sullivan,.Steven P. Woods, and William H. Spataro 2 Rebuttal Testimony of Alan Cox, Brian Entergy B Cox / 4/10/08 4/10/08 Sullivan, Steve Woods, and William Spataro Sullivan /

on Pilgrim Watch Contention I, Regarding Woods /

Adequacy of Aging Management Program for Spataro Buried Pipes and Tanks and Potential Need V for Monitoring Wells to Supplement Program and Response to Atomic Safety and Licensing Board's Questions of February 2 1, 1008, including the Declarations of Alan B.

Cox, Brian R. Sullivan, Steven P. Woods, andWilliam H. Spataro 3 Plant Layout Diagram Entergy 1A Cox/ 4/10/08 4/10/08 Sullivan /

Woods /

Spataro 7~,Lo 5~34h~5ezg'

ENTERGY NUCLEAR GENERATION COMPANY AND ENTERGY NUCLEAR OPERATIONS, INC.

Pilgrim Nuclear Power Station Docket No. 50-293-LR; ASLBP No. 06-848-02-LR April 10, 2008 Exhibit List OFFICIAL EX # EXHIBIT TITLE IPARTY NAME PARTY EX #

WITNESS/

PANEL IDENTIFIED DATE ADMITTED DATE L Action:

Admitted Rejected Withdrawn 4 Condensate Storage System Sketch Entergy 1B Cox / 4/10/08 4/10/08 Sullivan /

Woods /

_ Spataro 5 License Renewal Application - Appendix B Entergy 2 Cox / 4/10/08 4/10/08 (Excerpts) Sullivan /

Woods /

Spataro 6 Specification No. 6498-M-306, "Specification Entergy 3 Cox / 4/10/08 4/10/08 for External Surface Treatment of Sullivan /

Underground Metallic Pipe for Unit No. 1 Woods /

Pilgrim Station No. 600 Boston Edison Spataro I Company" 7 NUREG-1 801, Generic Aging Lessons Entergy 4 Cox / 4/10/08 4/10/08 Learned ("GALL") Report, Vol. 1, Rev. 1 and Sullivan /

Vol. 2, Rev. 1 (Excerpts) Woods PV Spataro 8 Procedure No. EN-DC-343, Rev. 0, Buried Entergy 5 Cox / 4/10/08 4/10/08 Piping and Tanks Inspection and Monitoring Sullivan /

Program Woods /

Spataro 9 License Renewal Application, Appendix A, Entergy 6 Cox/ 4/10/08 4/10/08 Section A.2.1.2 (Excerpts) Sullivan / V

  • Woods /

Spataro ENTERGY NUCLEAR GENERATION COMPANY AND ENTERGY NUCLEAR OPERATIONS, INC.

Pilgrim Nuclear Power Station Docket No. 50-293-LR; ASLBP No. 06-848-02-LR April 10, 2008 Exhibit List OFFICIAL PARTY PARTY WITNESS/ IDENTIFIED ADMITITED Action:

EX # EXHIBIT TITLE NAME EX# PANEL DATE DATE I - -

Admitted Rejected Withdrawn 10 NUREG-1 89 1, "Safety Evaluation Report Entergy 7 Cox/ 4/10/08 4/10/08 Related to the License Renewal of Pilgrim Sullivan /

Nuclear Power Station," (Sept. 2007; Woods /

Published Nov. 2007) Appendix A (Excerpts) Spataro 11 License Renewal Application, Appendix B.0.3 Entergy 8 Cox/ 4/10/08 4/10/08 Sullivan /

Woods /

Spataro 12 Entergy's Answer t6 Board Questions (Feb. Entergy 9 Cox / 4/10/08 4/10/08 /

11,2008), including the Sullivan / V Declaration and CV of Stephen J. Bethay Woods /

Spataro 13 Testimony of Arnold Gundersen Supporting Pilgrim 1-A Gundersen / 4/10/08 4/10/08 Pilgrim Watch Contention 1, March 6, 2008 Watch Ahfeld (PW) 14 Witness, Arnold Gundersen: Declaration of PW 1-B Gundersen / 4/10/08 4/10/08 Arnold Gundersen Supporting Pilgrim Watch's Ahfeld ,/

Petition for Contention 1, January 26, 2008; and Curriculum Vitae, Arnold Gundersen, January 2008 15 Witness, David P. Ahlfeld: Declaration of PW 2 Gundersen / 4/10/08 4/10/08 David P. Ahlfeld, PhD, PE Regarding Ahfeld Groundwater Monitoring Requirements for PNPS, January 28, 2008; Biographical Sketch David P. Ahlfeld.

ENTERGY NUCLEAR GENERATION COMPANY AND ENTERGY NUCLEAR OPERATIONS, INC.

Pilgrim Nuclear Power Station Docket No. 50-293-LR; ASLBP No. 06-848-02-LR April 10, 2008 Exhibit List OFFICIAL PARTY PARTY WITNESS/ IDENTIFIED ADMITTED Action:

EX# EXHIBIT TITLE NAME EX# PANEL DATE DATE Admitted Rejected Withdrawn 16 10 CFR 54.21 PW 3 Gundersen / 4/10/08 4/10/08 Ahfeld j 17 Advisory Committee on Reactor Safeguards, PW 4 Gundersen / 4/10/08 4/10/08 Official Transcript of Proceedings, 485th Ahfeld ,

Meeting, September 6, 2001 - discussion reasonable assurance, 95% confidence.

18 10 CFR Appendix B to Part 50, Quality PW 5 Gundersen / 4/10/08 4/10/08 Assurance Criteria for Nuclear Power Plants, Ahfeld .

NRC; and NRC Inspection Manual, Part 9900 Technical Guidance Operability Determinations & Functionality Assessments for Resolution of Degraded or Nonconforming Conditions Adverse to Quality or Safety, NRC, 09/26/05 19 NUREG-1891, Safety Evaluation Report PW 6 Gundersen / 4/10/08 4/10/08 Related to the License Renewal of Pilgrim Ahfeld ,

Nuclear Power Station, Docket No. 50-293, 3-36 to 3-38. Section 3.0.3.2.1 Buried Piping and Tanks Inspection Program.

ENTERGY NUCLEAR GENERATION COMPANY AND ENTERGY NUCLEAR OPERATIONS, INC.

Pilgrim Nuclear Power Station Docket No. 50-293-LR; ASLBP No. 06-848-02-LR April 10, 2008 Exhibit List OFFICIAL EX # EXHIBIT TITLE PARTY NAME PARTY EX #

WITNESS/

PANEL IDENTIFIED DATE ADMrITED DATE AdIttd i A

Admitted Rejected Withdrawn 20 Liquid Radioactive Release Lessons Learned PW Gundersen 4/10/08 4/10/08 Task Force Final Report, September 1, 2006; Ahfeld Executive Summary; pages 19 and 26; 7 Appendix B Consolidated Recommendations List.

21 NUREG/CR 6876, Risk Informed Assessment PW 8 Gundersen / 4/10/08 4/10/08 of Degraded Buried Piping Systems in Ahfeld Nuclear Power Plants; Brookhaven National Laboratory; US Nuclear Regulatory Commission, June 2005. From Sections (3.1.1) Aging Mechanisms; (3.3) Important Aging Effects for Use in Study; (3.4)

Degradation Rates for Corrosion and Loss Material/Pitting; (4.1) Detection of Age-related Degradation and Condition Assessment; (6)

Risk Evaluation of Degraded Buried Piping Systems; (7.3) Guidance on the Use of degradation Acceptance Criteria; and (8)

Conclusions and Recommendations 22 SSW: Declaration of Alan Cox In Support of PW 9 Gundersen / 4/10/08 4/10/08 Entergy's Motion for Summary Disposition of Ahfeld Pilgrim Watch Contention 1, June 5, 2007. f Describes purpose SSW System, therein.

ENTERGY NUCLEAR GENERATION COMPANY AND ENTERGY NUCLEAR OPERATIONS, INC.

Pilgrim Nuclear Power Station Docket No. 50-293-LR; ASLBP No. 06-848-02-LR April 10, 2008 Exhibit List OFFICIAL PARTY PARTY WITNESS/ IDENTIFIED ADMITTED Action:

EX # EXHIBIT TITLE NAME EX # PANEL DATE DATE Admitted Rejected Withdrawn 23 Corrosion: U.S. Nuclear Plants in the 21st PW 10 Gundersen / 4/10/08 4/10/08 Century: The Risk of a Lifetime, by David Ahfeld Lochbaum, Union of Concerned Scientists.

(May 2004); and "Using Reliability-Centered Maintenance As The Foundation For An Efficient And Reliable Overall Maintenance Strategy," National Aeronautics and Space Administration (NASA), 2001; and Declaration David Lochbaum attesting to fact stands by the contents of the report today. Bathtub Curve discussed therein.

24 SSW: Declaration of Alan Cox in Support of PW 11 Gundersen / 4/10/08 4/10/08 Entergy's Motion for Summary Disposition of Ahfeld Pilgrim Watch Contention 1, June 5,-2007, at FN. 6, page 11.. SSW carbon steel piping -

exterior coatings and surface of the original carbon steel SSW inlet piping was not examined when inlet piping replaced.

25 Corrosion: NRC Preliminary Notification of PW 12 Gundersen / 4/10/08 4/10/08 Event or Unusual Occurrence, PNO-III Ahfeld 021, "Both Units at Byron Shut Down Due to Leak in Pipe", October 23, 2007, ML072960109; and Union of Concerned Scientists Issue Paper, Help Wanted: Dutch Boy at Byron (October 25, 2007).

ENTERGY NUCLEAR GENERATION COMPANY AND ENTERGY NUCLEAR OPERATIONS, INC.

Pilgrim Nuclear Power Station Docket No. 50-293-LR; ASLBP No. 06-848-02-LR April 10, 2008 Exhibit List OFFICIAL PARTY PARTY WITNESS/ IDENTIFIED ADMI TrED Action:

EX# EXHIBIT TITLE NAME EX # PANEL DATE DATE ___ 7d

_Admitted I Rejected Withdrawn 26 Topography: Pilgrim Nuclear Power Station, PW 13 Gundersen/ 4/10/08 4/10/08 Boston Edison Company Docket No. 50-293, Ahfeld May 1972 -U.S. Atomic Energy Commission, Division of Radiological and Environmental Protection, Final EIS, pages 9-10.

Topography Pilgrim Station discussed therein.

27 BPTIMP: Buried Piping and Tanks Inspection PW 14 Gundersen / 4/10/08 4/10/08 and Monitoring Program, Entergy, 11.19.07 Ahfeld 28 Counterfeit and Substandard Products: United PW 15 Gundersen / 4/10/08 4/10/08 States General Accounting Office, Report to Ahfeld the Chairman, Subcommittee on Oversight and Investigations, Committee on Energy and Commerce, House of Representatives, Nuclear Safety and Health Counterfeit and Substandard Products Are A Government Wide Concern, GAO/RCED-91-6; October 1990.

29 Seismic: New Enqland not immune to stronq PW 16 Gundersen / 4/10/08 4/10/08 temblors and specialists say that a maior Ahfeld event in only a matter of time, Boston Globe, Bryan Bender, April 16, 2006.

ENTERGY NUCLEAR GENERATION COMPANY AND ENTERGY NUCLEAR OPERATIONS, INC.

Pilgrim Nuclear Power Station Docket No. 50-293-LR; ASLBP No. 06-848-02-LR April 10, 2008 Exhibit List OFFICIAL PARTY PARTY WITNESS/ IDENTIFIED ADMITTED Action:

EX # EXHIBIT TITLE NAME EX # PANEL DATE DATE

_ Admitted Rejected Withdrawn 30 BPTIP: NUREG-1891, Rev.1, X I M32, PW 17. Gundersen / 4/10/08 4/10/08 3.0.3.2.1 Buried Pipes and Tanks Inspection Ahfeld Program, 3-36 to 3-38.

31 GALL: NUREG-1801, Vol. 1, Rev. 1, Generic PW 18 Gundersen / 4/10/08 4/10/08 lessons Learned (GALL) Report, September Ahfeld 2005, X1 M-12 [10. Operating Experience, BWR Intergranular Stress]; and XI M-96 [10.

Operating Experience "Corrosion pits from the outside diameter have been discovered in buried piping with far less than 60 years of service.; XI.M32 One-time Inspection]; XI.M2 Water Chemistry. I 32 LRA: Pilgrim Nuclear Power Station License PW 19 Gundersen / 4/10/08 4/10/08 Renewal Application A.2.1.2; B.1.2 Ahfeld V 33 Monitoring Wells: Testimony of Alan Cox, PW 20 Gundersen / 4/10/08 4/10/08 Brian Sullivan, Steve Woods, and William Ahfeld Spataro on Pilgrim Watch Contention 1, regarding Adequacy of Aging Management Program for Buried Pipes and Tanks and Potential need For Monitoring Wells to Supplement Program, June 8, 2008, A36.

ENTERGY NUCLEAR GENERATION COMPANY AND ENTERGY NUCLEAR OPERATIONS, INC.

Pilgrim Nuclear Power Station Docket No. 50-293-LR; ASLBP No. 06-848-02-LR April 10, 2008 Exhibit List OFFICIAL PARTY PARTY WITNESS/ IDENTIFIED ADMIT'ED Action:

EX # EXHIBIT TITLE NAME EX # PANEL DATE DATE Admitted Rejected Withdrawn 34 Handling: Affidavit of Dr. James A. Davis PW 21 Gundersen / 4/10/08 4/10/08 Concerning Entergy's Motion for Summary Ahfeld Disposition of Pilgrim Watch Contention 1, June 28, 2007, 16. Reliance industry practice qualified by there is not damage in application coating and handling therein.

35 OIG: Office of Inspector General's Audit of PW 22 Gundersen / 4/10/08 4/10/08 NRC's License Renewal Program, OIG-07-A- Ahfeld 15, September 6, 2007. f 36 Safety Review Process: Event Notification PW 23 Gundersen / 4/10/08 4/10/08 Report, Number 43832, Palisades, Ahfeld 12/10/2007. Notification to Offsite Agencies Due to Elevated Tritium Levels.

37 Monitoring Well Location: Approximate PW 25 Gundersen / 4/10/08 4/10/08 location Monitoring Wells Document Provided Ahfeld ,

by Entergy, November 2007.

ENTERGY NUCLEAR GENERATION COMPANY AND ENTERGY NUCLEAR OPERATIONS, INC.

Pilgrim Nuclear Power Station Docket No. 50-293-LR; ASLBP No. 06-848-02-LR April 10, 2008 Exhibit List OFFICIAL PARTY PARTY WITNESS/ IDENTIFIED ADMITTED Action:

EX # EXHIBIT TITLE NAME EX # PANEL DATE DATE EXHIBIT TITLE Admitted Rejected Withdrawn 38 Tritium Leak, PNPS: Discovery in Pilgrim PW 26 Gundersen/ 4/10/08 4/10/08 wells fuels debate, Robert-Knox, Boston Ahfeld Globe, December 20, 2007; and Analysis Tritium samples for Massachusetts Department of Public Health Split Samples, December 5, 2007 with cover letter from Mr.

Robert Walker, Director MA Department Public Health Radiation Control Program; December 26, 2007.

39 NRC STAFF TESTIMONY OF DR. JAMES A. NRC 1 Davis /Chan 4/10/08 4/10/08 DAVIS CONCERNING PILGRIM WATCH / Keim CONTENTION 1 (JANUARY 29, 2008) Y 40 NRC STAFF TESTIMONY OF TERENCE L. NRC 2 Davis /Chan 4/10/08 4/10/08' CHAN AND ANDREA T. KEIM / Keim CONCERNING PILGRIM WATCH CONTENTION 1 (JANUARY 29, 2008) 41 REBUTTAL TESTIMONY AND RESPONSES NRC 3 Davis /Chan 4/10/08 4/10/08 TO BOARD QUESTIONS OF DR. JAMES A. / Keim DAVIS, TERENCE L. CHAN AND ANDREA T. KEIM CONCERNING PILGRIM WATCH CONTENTION 1 (MARCH 6, 2008) 42 NUREG-1801, Rev. 1 (Sept. 2005) EXCERPT NRC 4 Davis / Chan 4/10/08 4/10/08

-'XI.M34 "BURIED PIPING AND TANKS / Keim INSPECTION" V ENTERGY NUCLEAR GENERATION COMPANY AND ENTERGY NUCLEAR OPERATIONS, INC.

Pilgrim Nuclear Power Station Docket No. 50-293-LR; ASLBP No. 06-848-02-LR April 10, 2008 Exhibit List OFFICIAL PARTY PARTY WITNESS/ IDENTIFIED ADMITIED Action:

EX # EXHIBIT TITLE NAME EX # PANEL DATE DATE Admitted Rejected Withdrawn 43 NUREG-1801, Rev. 1 (Sept. 2005) EXCERPT NRC 5 Davis /Chan 4/10/08 4/10/08

- XI.M20 "OPEN-CYCLE COOLING WATER / Keim SYSTEM" 44 07/18/1989 GENERIC LETTER RE SERVICE NRC 6 Davis /Chan 4/10/08 4/10/08 WATER SYSTEM PROBLEMS AFFECTING / Keim SAFETY-RELATED EQUIPMENT (GENERIC y LETTER 89-13) 45 PILGRIM LICENSE RENEWAL NRC 7 Davis /Chan 4/10/08 4/10/08 APPLICATION EXCERPT - B.1.2 "BURIED / Keim PIPING AND TANKS INSPECTION" 46 PILGRIM LICENSE RENEWAL NRC 8 Davis /Chan 4/10/08 4/10/08 APPLICATION EXCERPT - B.1.28 "SERVICE / Keim WATER INTEGRITY" 47 NUREG-1891 (Sept. 2007, Published Nov. NRC 9 Davis /Chan 4/10/08 4/10/08 2007) EXCERPT - 3.0.3.2.16 "SERVICE / Keim WATER INTEGRITY PROGRAM" 48 PDC No. 99-21 "EXCAVATION FOR SSW NRC 10 Davis / Chan 4/10/08 4/10/08 PIPE REPLACEMENT (RFO #12 SCOPE) /Keim 49 NUREG-1891 (Sept. 2007, Published Nov. NRC 11 Davis / Chan 4/10/08 4/10/08 2007) EXCERPT - 3.0.3.1.13 'WATER /Keim CHEMISTRY CONTROL BWR PROGRAM" ENTERGY NUCLEAR GENERATION COMPANY AND ENTERGY NUCLEAR OPERATIONS, INC.

Pilgrim Nuclear Power Station Docket No. 50-293-LR; ASLBP No. 06-848-02-LR April 10, 2008 Exhibit List OFFICIAL EX # EXHIBIT TITLE PAR NAME PARTY EX #

WITNESS/

PANEL IDENTIFIED DATE -

ADMITTED DAT Action:

EAdmitted I Reiected Withdrawn 50 NUREG-1891 (Sept. 2007, Published Nov. NRC 12 Davis / Chan 4/10/08 4/10/08 2007) EXCERPT - 3.0.3.1.8 "ONE-TIME / Keim INSPECTION PROGRAM" 51 12/06/2002 LETTER FROM ENTERGY TO NRC 13 Davis /Chan 4/10/08 4/10/08 NRC RE "PILGRIM NUCLEAR POWER / Keim STATION FOURTH TEN-YEAR INSERVICE V TESTING (IST) PROGRAM AND REQUEST FOR APPROVAL OF IST RELIEF REQUESTS 52 AMENDMENT NO. 176 EXCERPT (3/4.5 NRC 14 Davis/Chan 4/10/08 4/10/08 3/4.5-8) /Keim V1 53 PNPS-FSAR EXCERPT - 11.9 NRC 15 Davis / Chan 4/10/08 4/10/08 "CONDENSATE STORAGE'SYSTEM" / Keim I 54 PNPS-FSAR REV. 26 EXCERPT - "QUALITY NRC 16 Davis / Chan 4/10/08 4/10/08 ASSURANCE PROGRAM" /Keim I 55 06/29/2005 LETTER FROM ENTERGY TO NRC 17 Davis / Chan 4/10/08 4/10/08 NRC RE PILGRIM FOURTH TEN-YEAR / Keim INSERVICE INSPECTION PROGRAM PLAN, AND THE ASSOCIATED RELIEF I

REQUESTS FOR NRC APPROVAL ENTERGY NUCLEAR GENERATION COMPANY AND ENTERGY NUCLEAR OPERATIONS, INC.

Pilgrim Nuclear Power Station Docket No. 50-293-LR; ASLBP No. 06-848-02-LR April 10, 2008 Exhibit List OFFICIAL PARTY PARTY WITNESS/ IDENTIFIED ADMITTED Action:

EX# EXHIBIT TITLE NAME EX # PANEL DATE DATE Admitted Rejected Withdrawn 56 ATTACHMENT 71111.07 (ISSUE DATE NRC 18 Davis /Chan. 4/10/08 4/10/08 05/25/2006) "HEAT SINK PERFORMANCE" / Keim 57 05/12/2006 LETTER FROM CLIFFORD NRC 19 Davis/Chan 4/10/08 4/10/08 ANDERSON (NRC) TO ENTERGY RE / Keim PILGRIM NUCLEAR POWER STATION -

NRC INTEGRATED INSPECTION REPORT 05000293/2006002 58 PNPS-FSAR - EXCERPT - 10.7 "SALT NRC 20 Davis / Chan 4/10/08 4/10/08 SERVICE WATER SYSTEM" /Keim 59 11/07/1991 GENERIC LETTER (GENERIC NRC 21 Davis /Chan 4/10/08 4/10/08 LETTER 91-18) RE "INFORMATION TO / Keimr LICENSEES REGARDING TWO NRC INSPECTION MANUAL SECTIONS ON RESOLUTION OF DEGRADED AND NONCONFORMING CONDITIONS AND ON OPERABILITY ENTERGY NUCLEAR GENERATION COMPANY AND ENTERGY NUCLEAR OPERATIONS, INC.

Pilgrim Nuclear Power Station Docket No. 50-293-LR; ASLBP No.06 84 LR April 10, 2008 Exhibit List OFFICIAL 1 PARTY PARTY WITNESS/ IDENTIFIED ADMITTED Action:

EX # EXHIBIT TITLE NAME EX # PANEL DATE DATE Admitted I Rejected Withdrawn 60 NRC REGULATORY ISSUE

SUMMARY

NRC 22 Davis /Chan 4/10/08 4/10/08 2005-20: REVISION TO GUIDANCE / Keim FORMERLY CONTAINED IN NRC GENERIC V LETTER 91-18, "INFORMATION TO LICENSEES REGARDING TWO NRC INSPECTION MANUAL SECTIONS ON RESOLUTION OF DEGRADED AND NONCONFORMING CONDITIONS AND ON OPERABILITY' 61 NUREG-1891 (Sept. 2007, Published Nov. NRC 23 Davis /Chan 4/10/08 4/10/08 2007) EXCERPT - 3.0.2 "STAFF'S REVIEW / Keim PROCESS" 62 NRC BULLETIN NO. 87-01: THINNING OF NRC 24 Davis /Chan 4/10/08 4/10/08 PIPE WALLS IN NUCLEAR POWER PLANTS /Keim (JULY 9, 1987) _

63 CORROSION INDUCED BY LOW-ENERGY NRC 25 Davis /Chan 4/10/08 4/10/08 RADIONUCLIDES (2004) EXCERPT - / Keim "STRATEGY FOR CONTROLLING CORROSION" 64 NRC INSPECTION MANUAL - INSPECTION NRC 26 Davis / Chan 4/10/08 4/10/08 PROCEDURE 35101 - QA PROGRAM / Keim IMPLEMENTATION INSPECTION FOR OPERATIONAL- PROGRAMS (10/03/2007) _

ENTERGY NUCLEAR GENERATION COMPANY AND ENTERGY NUCLEAR OPERATIONS, INC.

Pilgrim Nuclear Power Station Docket No. 50-293-LR; ASLBP No. 06-848-02-LR April 10, 2008 Exhibit List OFFICIAL PARTY PARTY WITNESS/ IDENTIFIED ADMITTED Action:

EX # E X H IB IT T IT L E NA ME EX # P A NE L DATE DATE Ad mitte d R Wit hd r a wn 65 AFFIDAVIT OF DR. JAMES A. DAVIS AND NRC 27 Davis / Chan 4/10/08 4/10/08 ANDREA T. KEIM IN RESPONSE TO / Keim LICENSING BOARD QUESTIONS IN ORDER (BOARD QUESTIONS FOR THE NRC STAFF AND APPLICANT) 66 NRC REGION III REPORT EXCERPT - NRC 28 Davis / Chan 4/10/08 4/10/08 SERVICE WATER (SX) SYSTEM /Keim 67 Photographs of Corrosion on Pipes at Pilgrim PW 53 Gundersen / 4/10/08 4/10/08 Nuclear Power Station Ahfeld 68 Entergy Condition Report CR-PNP-2003- Entergy 10 Cox / 4/10/08 4/10/08 01706 Sullivan/

Woods /

Spataro 69 Entergy Nonconformance Report Entergy 11 Cox / 4/10/08 4/10/08 Sullivan /

Woods /

Spataro 70 AMRM-H, Aging Management Review of the Entergy 12 Cox / 4/10/08 4/10/08 Salt Service Water System Sullivan /

Woods / V Spataro ENTERGY NUCLEAR GENERATION COMPANY AND ENTERGY NUCLEAR OPERATIONS, INC.

Pilgrim Nuclear Power Station Docket No. 50-293-LR; ASLBP No. 06-848-02-LR April 10, 2008 Exhibit List OFFICIAL PARTY PARTY WITNESS/ IDENTIFIED ADMITTED Action:

EX EXHIBIT TITLE NAME EX# PANEL DATE DATE T PANEL_ I I Admitted Rejected Withdrawn 71 GALL Report, X1 M Xl M-96 PW 58 Gundersen / 4/10/08 4/10/08 Ahfeld 72 Pilgrim Nulcear Power Station Chemistry PW 52A Gundersen / 4/10/08 4/10/08 Corporate Assessment Ahfeld /