ML110600937
| ML110600937 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 01/30/2011 |
| From: | Egan B Egan Environmental, Pilgrim Watch |
| To: | Atomic Safety and Licensing Board Panel |
| SECY RAS | |
| Shared Package | |
| ML110320036 | List: |
| References | |
| 50-293-LR, ASLBP 06-848-02-LR, RAS 19522 | |
| Download: ML110600937 (2) | |
Text
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before The Atomic Safety And Licensing Board In the Matter of Docket # 50-293-LR Entergy Corporation Pilgrim Nuclear Power Station License Renewal Application January 30, 2011 DECLARATION OF BRUCE A. EGAN, SC.D., CCM, IN SUPPORT OF PILGRIM WATCHS RESPONSE OPPOSING ENTERGYS INITIAL STATEMENT OF POSITION ON PILGRIM WATCH CONTENTION 3 I, Bruce A. Egan prepared the attached document; and declare that under penalty of perjury that it is true and correct to the best of my understanding.
Signed Electronically Bruce A. Egan Sc.D., CCM Air Quality Consulting Services 75 Lothrop St.
Beverly, MA 01915 Tel: 978-524-7677 bruce@eganenvironmental.com Nuclear Regulatory Commission Exhibit # - PWA000022-00-BD01 Docket # - 05000293 Identified: 02/22/2011 Admitted: Withdrawn:
Rejected: Stricken:
02/22/2011
Bruce A. Egan