MONTHYEARML1007100832010-03-10010 March 2010 Transmittal of Program Plan for Aging Management of Reactor Vessel Internals (WCAP-17133-NP, Rev. 0) Project stage: Request ML1009204762010-03-31031 March 2010 License Amendment Request: Control Rod Drive Exercise Surveillance Project stage: Request ML1013304552010-05-13013 May 2010 Supplement to License Amendment Request: Control Rod Drive Exercise Surveillance Project stage: Supplement ML1027103812010-11-0303 November 2010 Audit of the Licensee'S Management of Regulatory Commitments Project stage: Other 2010-03-10
[Table View] |
|
---|
Category:Letter
MONTHYEARML24022A1172024-01-23023 January 2024 Acceptance of Requested Licensing Action Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24012A2422024-01-16016 January 2024 Acceptance of Requested Licensing Action License Transfer Request ML23236A0042023-12-27027 December 2023 Issuance of Amendment 274 Re Changes to Perm Defueled Emergency Plan and Perm Defueled Emergency Action Level Scheme ML23355A1242023-12-26026 December 2023 Withdrawal of an Amendment Request Re License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML23192A0772023-12-26026 December 2023 Letter Exemption from the Requirements of 10 CFR 140.11(a)(4) Concerning Offsite Primary and Secondary Liability Insurance ML23191A5222023-12-22022 December 2023 Exemption Letter from the Requirements of 10 CFR 50.54(W)(1) Concerning Onsite Property Damage Insurance (EPID - L-2022-LLE-0032) ML23263A9772023-12-22022 December 2023 Exemption from Certain Emergency Planning Requirements and Related Safety Evaluation ML23354A2602023-12-21021 December 2023 Reference Simulator Inspection Request for Information L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23291A4402023-11-0303 November 2023 Acceptance of Requested Licensing Action Request for Exemption from 10 CFR 50.82(a)(2) to Support Reauthorization of Power Operations IR 05000255/20230032023-10-0404 October 2023 NRC Inspection Report No. 05000255/2023003(DRSS)-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23275A0012023-10-0202 October 2023 Request for Withholding Information from Public Disclosure for Palisades Nuclear Plant PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-023, Special Report High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report High Range Noble Gas Monitor Inoperable ML23215A2302023-08-0303 August 2023 Notice of Organization Change - Chief Nuclear Officer IR 05000255/20230022023-07-19019 July 2023 NRC Inspection Report 05000255/2023002 DRSS-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23087A0362023-05-0202 May 2023 PSDAR Review Letter ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations ML23038A0982023-03-15015 March 2023 Request for Withholding Information from Public Disclosure ML23095A0642023-03-14014 March 2023 American Nuclear Insurers, Notice of Cancellation Rescinded PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23052A1092023-02-17017 February 2023 FEMA Letter to NRC, Proposed Commission Paper Language for Palisades Nuclear Plant Emergency Plan Decommissioning Exemption Request ML23032A3992023-02-0101 February 2023 Regulatory Path to Reauthorize Power Operations IR 05000255/20220032022-12-28028 December 2022 NRC Inspection Report No. 05000255/2022003(DRSS); 07200007/2022001 (Drss) Holtec Decommissioning International, LLC, Palisades Nuclear Plant L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 ML22321A2852022-11-17017 November 2022 LLC Master Decommissioning Trust Agreement for Palisades Nuclear Plant IR 05000255/20224012022-11-0909 November 2022 Decommissioning Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2022401 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance ML22292A2572022-10-25025 October 2022 Permanently Defueled Emergency Plan License Amendment RAI Letter 2024-01-23
[Table view] |
Text
Palisades "'",.''
27780 Blue Star Memorial Highway Covert, MI 49043 Tel 269 764 2000 Christopher J. Schwarz Site Vice President May 13, 2010 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Supplement to License Amendment Request: Control Rod Drive Exercise Surveillance Palisades Nuclear Plant Docket 50-255 License No. DPR-20
Reference:
- 1. Entergy Nuclear Operations, Inc. letter dated March 31,2010, License Amendment Request: Control Rod Drive Exercise Surveillance
Dear Sir or Madam:
In Reference 1, Entergy Nuclear Operations, Inc. (ENO) submitted a license amendment request (LAR) to revise the Palisades Nuclear Plant Renewed Facility Operating License. The proposed amendment would add a new license condition 2.C(4). In telephone calls on 3,2010, and May 10,201 the Nuclear Regulatory Commission staff requested the wording proposed license condition and a note be Specifications Surveillance Requirement SR 3.1.4.3.
response the request wording license and adding a note to SR 3.1.4.3, ENO proposes the changes below. These changes do not change the intent of the submitted in Reference 1.
In the proposed license condition 2.C(4), delete the following words at the end of the sentence: "in a maintenance or refueling outage, whichever is earlier."
The modified proposed license condition 2.C(4) would read:
"Performance of Technical Specifications Surveillance Requirement SR 3.1.4.3 is not required for control rod drive CRD-22 during cycle 21 until the next entry into Mode 3."
the following Technical Specifications Surveillance Requirement SR 3.1.4.3:
"Not required to be performed or met for control rod 22 during cycle 21 provided control rod 22 is administratively declared immovable, but trippable and Condition D is entered for control rod 22." provides the marked-up pages to the operating license and Technical Specifications showing the revised proposed changes. Attachment 2 provides the page change instructions and revised pages to the operating license and Technical Specifications for the revised proposed changes.
In the May 10, 2010, telephone call, ENO modified its request for approval of the LAR to May 28, 2010. The amendment would be implemented by June 10, 2010.
A copy of this supplement letter has been provided to the designa.ted representative of the State of Michigan.
Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.
I declare under penalty of perjury that the foregoing is true and accurate. Executed on May 13, 2010.
Sincerely, cjs/jlk Attachments: 1. Proposed Renewed Facility Operating License and Technical Specifications Change (mark-up)
- 2. Proposed Renewed Facility Operating License and Technical Specifications Change (typed) cc: Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC
1 PROPOSED RENEWED FACILITY OPERATING LICENSE and TECHNICAL SPECIFICATIONS CHANGE (mark-up)
Page 4 of Renewed Operating License 1 Technical Specifications Two pages follow
- a. ENO may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
- b. ENO may alter specific features of the approved fire protection program provided:
- Such changes do not result in failure to complete the fire protection program as approved by the Commission. ENO shall maintain in auditable form, a current record of all such changes, including an analysis of the effects of the change on the fire protection program and shall make such records available to the Commission Inspectors upon request. All changes to the approved program shall be reported along with the FSAR revision as required by 10 CFR 50.71(e); and
- Temporary changes to specific fire protection features which may be necessary to accomplish maintenance or modifications are acceptable provided interim compensatory measures are implemented.
(4)
(5) [deleted]
Renewed License No. DPR-20 Amendment No. 2a4, 235
SURVEILLANCE FREQUENCY SR 3.1.4.1 Verify the position of each control rod to be within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 8 inches of all other control rods in its group.
SR 3.1.4.2 Perform a CHANNEL CHECK of the control rod 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> position indication channels.
SR 3.1.4.3 92 days Verify control rod freedom of movement by moving each individual full-length control rod that is not fully inserted into the reactor core:::: 6 inches in either direction.
SR 3.1.4.4 Verify the rod position deviation alarm is 18 months OPERABLE.
SR 3.1 Perform a of the control 18 months rod position indication channels.
SR 3.1.4.6 Verify each full-length control rod drop time is Prior to reactor
- s; 2.5 seconds. criticality, after each reinstallation of the reactor head Palisades Nuclear Plant 3.1.4-3 Amendment No. 189
2 PROPOSED RENEWED FACILITY OPERATING LICENSE and TECHNICAL SPECIFICATIONS CHANGE (typed)
Renewed Facility Operating License and Technical Specifications Page Change Instructions, Page 4 Renewed Operating License Page 1.4-3 Technical Specifications Three pages follow
DOCKET NO. 50-255 Remove the following page of the Renewed Facility Operating License and replace it with the attached revised page. The revised page is identified by amendment number and contains a marginal line indicating the area of change.
REMOVE INSERT Page 4 Page 4 Replace the following page of the Appendix A Technical Specifications with the attached revised page. The revised page is identified by amendment number and contains a marginal line indicating the area of change.
REMOVE INSERT 3.1.4-3 3.1.4-3
- a. ENO may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
- b. ENO may alter specific features of the approved fire protection program provided:
- Such changes do not result in failure to complete the fire protection program as approved by the Commission. ENO shall maintain in auditable form, a current record of all such changes, including an analysis of the effects of the change on the fire protection program and shall make such records available to the Commission Inspectors upon request. All changes to the approved program shall be reported along with the FSAR revision as required by 10 CFR 50.71 (e); and
- Temporary changes to specific fire protection features which may be necessary to accomplish maintenance or modifications are acceptable provided interim compensatory measures are implemented.
(4) Performance of Technical Specifications Surveillance Requirement SR 3.1.4.3 is not required for control rod drive CRD-22 during cycle 21 until the next entry into Mode 3.
(5) [deleted]
Renewed License No. DPR-20 Amendment No. 224, 235, xxx
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.4.1 Verify the position of each control rod to be within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 8 inches of all other control rods in its group.
SR 3.1.4.2 Perform a CHANNEL CHECK of the control rod 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> position indication channels.
SR 3.1.4.3 ------------------------------N()TE---------------------------- 92 days Not required to be performed or met for control -
rod 22 during cycle 21 provided control rod 22 is administratively declared immovable, but trippable and Condition D is entered for control rod 22.
Verify control rod freedom of movement by moving each individual full-length control rod that is not fully inserted into the reactor core::::: 6 inches in either direction.
SR 3.1.4.4 Verify the rod position deviation alarm is 18 months
()PERABLE.
SR 3.1 Perform a CHANNEL CALIBRATI()N of the control 18 months rod position indication channels.
SR 3.1.4.6 Verify each full-length control rod drop time is Prior to reactor S 2.5 seconds. criticality, after each reinstallation of the reactor head Palisades Nuclear Plant 3.1.4-3 Amendment No. +89, xxx