ND-18-0004, (VCSNS) Units 2 and 3, ITAAC Completion and Operational Program Implementation Schedule Updates (Required by 10 CFR 52.99(a) and License Conditions 2.D.(11) and 2.D.(12)(e))

From kanterella
Revision as of 11:41, 7 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
(VCSNS) Units 2 and 3, ITAAC Completion and Operational Program Implementation Schedule Updates (Required by 10 CFR 52.99(a) and License Conditions 2.D.(11) and 2.D.(12)(e))
ML18099A218
Person / Time
Site: Summer  South Carolina Electric & Gas Company icon.png
Issue date: 04/09/2018
From: Archie J
SCANA Corp, South Carolina Electric & Gas Co
To:
Document Control Desk, Office of New Reactors
References
NND-18-0004
Download: ML18099A218 (2)


Text

Jeffrey B. Archie SCE&G@ A SCANA COMPANY Senior Vice President, SCANA Senior Vice President & CNO, SCE&G April 9, 2018 NND-18-0004 10 CFR 52.97 10 CFR 52.99 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Combined License Nos. NPF-93 and NPF-94 Docket Numbers52-027 and 52-028

Subject:

ITAAC Completion and Operational Program Implementation Schedule Updates (Required by 10 CFR 52.99(a) and License Conditions 2.D.(11) and 2.D.(12)(e))

References:

1. Letter from April Rice to NRC, ITAAC Completion and Operational Program Implementation Schedule Updates (Required by 10 CFR 52.99(a) and License Conditions 2.D.(11) and 2.D.(12)(e)), dated September 20, 2017(ML172638123)
2. Letter from April Rice to NRC, Operational Program Implementation Schedule in Accordance With License Conditions 2. D.(11) and 2.D.(12)(e), dated March 23, 2017(ML17082A490)
3. Letter from April Rice to NRC, 10 CFR 52.99(a) ITAAC Completion Schedule Submittal, dated March 22, 2017 (ML17082A282)

Pursuant to 10 CFR 52.99(a) and in accordance with License Conditions 2.D.(11) and 2.D.(12)(e) of Combined Licenses (COLs) NPF-93 and NPF-94, South Carolina Electric

& Gas (SCE&G) is submitting this letter to update the ITAAC Completion and Operational Program Implementation Schedules for Virgil C. Summer Nuclear Station (VCSNS), Units 2 and 3.

10 CFR 52.99(a), Licensee schedule for completing inspections, tests, or analyses, requires that SCE&G as a COL holder under 10 CFR Part 52, submit to the NRC updates to its ITAAC schedules per its prescribed frequencies.

License Conditions 2.D.(11) and 2.D.(12)(e) require that the Operational Program Implementation Schedule be updated every 6 months until 12 months before scheduled fuel loading, and every month thereafter until each license condition has been fully implemented.

SCE&G I New Nuclear Deployment* P.O. Box 88 *MC 800

  • www.sceg.com

Document Control Desk NND-18-0004 Page 2of2 In accordance with the cited requirements, this letter is being submitted for the reporting period ending March 30, 2018. All previously uncompleted ITAAC and Operational Program Implementation activities remain in a To Be Determined (TBD) state, as previously described in Reference 1, pending final disposition of the VCSNS Units 2 and 3 COLs.

This letter contains no regulatory commitments.

Should you have any questions regarding this letter, please contact Justin Bouknight by phone at (803) 941-9828, or by email at justin .bouknight@scana.com .

Sincerely,

~ Jeffrey 8. Archie Senior Vice President, SCANA Senior Vice President & CNO, SCE&G JRB/JBA/jrb c: Cathy Haney Justin R. Bouknight Laura Dudes Kyle M. Young Fred Brown Kathryn M. Sutton Vanna Ordaz Susan E. Jenkins Billy Gleaves William M. Cherry Jeffrey B. Archie Jason Williams Alvis J. Bynum Rhonda M. O'Banion Virginia D. Smith DCRM-EDMS@SCANA.COM