ML19030A327
From kanterella
ML19030A327 | |
Person / Time | |
---|---|
Site: | Clinch River |
Issue date: | 01/18/2019 |
From: | James Shea Tennessee Valley Authority |
To: | Office of New Reactors |
Fetter A | |
References | |
TVACLINCHRIVERESP, TVACLINCHRIVERESP.SUBMISSION.6, CRN.P.PART02, CRN.P.PART02.2 | |
Download: ML19030A327 (170) | |
Similar Documents at Clinch River | |
---|---|
Category:Site Safety Analysis Report (SSAR)
MONTHYEARML19029A5322019-01-18018 January 2019
[Table view]Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.01 - Geography and Demography ML19029A5772019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.04.12C - Groundwater Flow Model ML19029A5222019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Table of Contents ML19029A5262019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 01 - General and Administrative Information - Introduction and General Description ML19029A5292019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.00 - Plant Parameter Envelope ML19029A5342019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.02 - Nearby Industrial, Transportation, and Military Facilities ML19029A5372019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.03 - Meteorology ML19029A5392019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.04.00 - Hydrology Review ML19029A5412019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.04.01 - Hydrologic Description ML19029A5432019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.04.02 - Floods ML19029A5472019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.04.03 - Probable Maximum Flood on Streams and Rivers ML19029A5492019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.04.04 - Potential Dam Failures ML19029A5512019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.04.05 - Probable Maximum Surge and Seiche Flooding ML19029A5542019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.04.06 - Probable Maximum Tsunami Hazards ML19029A5562019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.04.07 - Ice Effects ML19029A5582019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.04.08 - Cooling Water Canals and Reservoirs ML19029A5612019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.04.09 - Channel Diversions ML19029A5632019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.04.10 - Flooding Protection Requirements ML19029A5652019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.04.11 - LOW Water Considerations ML19029A5682019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.04.12 - Groundwater ML19029A5702019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.04.12A - List of Water Systems in EPA Safe Drinking Water Information System ML19029A5732019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.04.12B - Aquifer Pumping Test Results ML19029A5792019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.04.13 - Accidental Releases of Liquid Effluents to Ground and Surface Waters ML19029A5812019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.04.14 - Technical Specifications and Emergency Operation Requirements ML19029A5832019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.05.01 - Geologic Characterization Information ML19029A5862019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.05.01 - Geologic Characterization Information - Figures 01-35 ML19029A5892019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.05.01 - Geologic Characterization Information - Figures 36-63 ML19029A5952019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.05.01 - Geologic Characterization Information - Figures 64-92 ML19029A5982019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.05.02 - Vibratory Ground Motion ML19029A6012019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.05.03 - Surface Deformation ML19029A6032019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.05.04 - Stability of Subsurface Materials and Foundations ML19029A6072019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.05.05 - Stability of Slopes ML19029A6132019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 03 - Design of Structures, Systems, Components, and Equipment ML19029A6172019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 11 - Radioactive Waste Management ML19029A6192019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 13 - Conduct of Operations ML19029A6232019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 15 - Accident Analysis ML19029A6272019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 17 - Quality Assurance ML19030A2752019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Table of Contents ML19030A3422019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.05.03 - Surface Deformation ML19030A3172019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.04.12B - Aquifer Pumping Test Results ML19030A3202019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.04.12C - Groundwater Flow Model ML19030A3232019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.04.13 - Accidental Releases of Liquid Effluents to Ground and Surface Waters ML19030A3252019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.04.14 - Technical Specifications and Emergency Operation Requirements ML19030A3272019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.05.01 - Geologic Characterization Information ML19030A3302019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.05.01 - Geologic Characterization Information - Figures 01-35 ML19030A3332019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.05.01 - Geologic Characterization Information - Figures 36-63 ML19030A3362019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.05.01 - Geologic Characterization Information - Figures 64-92 ML19030A3392019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.05.02 - Vibratory Ground Motion ML19030A3502019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 11 - Radioactive Waste Management ML19030A3552019-01-18018 January 2019 Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 17 - Quality Assurance 2019-01-18 Category:License-Application for Early Site Permit (ESP) MONTHYEARML19030A5012019-01-18018 January 2019
[Table view]Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix B.1 - Pages 70-77 ML19030A4152019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 02 - Section 02.08 - Noise ML19030A4172019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 02 - Section 02.09 - Related Federal Project Activities ML19030A4202019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 03 - Plant Description ML19030A4222019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 04 - Environmental Impacts of Construction ML19030A4242019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 05 - Section 05.01 - Environmental Impacts of Station Operation ML19030A4262019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 05 - Section 05.02 - WATER-RELATED Impacts ML19030A4282019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 05 - Section 05.03 - Cooling System Impacts ML19030A4302019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 05 - Section 05.04 - Radiological Impacts of Normal Operation ML19030A4322019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 05 - Section 05.05 - Environmental Impacts of Waste ML19030A4342019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 05 - Section 05.06 - Transmission System Impacts ML19030A4362019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 05 - Section 05.07 - Uranium Fuel Cycle and Transportation Impacts ML19030A4392019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 05 - Section 05.08 - Socioeconomic Impacts ML19030A4412019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 05 - Section 05.09 - Decommissioning Impacts ML19030A4422019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 05 - Section 05.10 - Measures and Controls to Limit Adverse Impacts During Operation ML19030A4442019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 05 - Section 05.11 - Cumulative Impacts Related to Station Operation ML19030A4472019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 06 - Environmental Measurements and Monitoring Programs ML19030A4492019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 07 - Environmental Impacts of Postulated Accidents Involving Radioactive Materials ML19030A4502019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 08 - Need for Power ML19030A4532019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 09 - Alternatives ML19030A4552019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 10 - Environmental Consequences of the Proposed Action ML19030A4582019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Appendix a - Consultation - Pages 0-A6 ML19030A4602019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Appendix a - Consultation - Pages A7-A11 ML19030A4632019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Appendix a - Consultation - Pages A12-A34 ML19030A4662019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Appendix a - Consultation - Pages A35-A46 ML19030A4692019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Appendix a - Consultation - Pages A47-A52 ML19030A4712019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Appendix a - Consultation - Pages A53-A54 ML19030A4742019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Appendix a - Consultation - Pages A55-A64 ML19030A4762019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Appendix a - Consultation - Pages A65-A91 ML19030A4772019-01-18018 January 2019 Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Appendix B - Environmental Protection Plan ML19030A4812019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Site Vicinity Geologic Map Plates - Plate 1 ML19030A4822019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Site Vicinity Geologic Map Plates - Plate 2A ML19030A4832019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Site Vicinity Geologic Map Plates - Plate 2B ML19030A4842019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Site Vicinity Geologic Map Plates - Plate 2C CNL-19-018, Resubmittal of Clinch River Nuclear Site Early Permit Application, Revision 22019-01-18018 January 2019 Resubmittal of Clinch River Nuclear Site Early Permit Application, Revision 2 ML19030A4862019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Site Vicinity Geologic Map Plates - Plate 2D ML19030A4872019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Index ML19030A4882019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - TVA Quality Assurance Program - Nuclear Quality Assurance Plan ML19030A4892019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Pages 1-46 ML19030A4902019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Pages 47-82 ML19030A4912019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix a - Pages 1-9 ML19030A4922019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix a - Pages 10-18 ML19030A4932019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix B.1 - Pages 1-22 ML19030A4942019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix B.1 - Pages 23-28 ML19030A4952019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix B.1 - Pages 29-40 ML19030A4962019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix B.1 - Pages 41-44 ML19030A4982019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix B.1 - Pages 45-52 ML19030A4992019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix B.1 - Pages 53-60 ML19030A5002019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix B.1 - Pages 61-69 ML19030A5352019-01-18018 January 2019 Part 08 Enclosures (Rev. 2) - Part 08 - Enclosures - Subsurface Data Report - Appendix B.1 - Pages 353-361 2019-01-18 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML19030A327&oldid=2525736"