ML12227A519

From kanterella
Revision as of 13:47, 6 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Calculation 98-ENG-02405D2, Revision 2, Attachment 5, Page 1 of 3
ML12227A519
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/09/2012
From:
Dominion Nuclear Connecticut
To:
Office of Nuclear Reactor Regulation
References
12-474A 98-ENG-02405D2, Rev 2
Download: ML12227A519 (4)


Text

Calculation 98-ENG-02405D2, Revision 2 Attachment 5

E

/4~~7L 592-- 721~9e 6L'aicja#,bA ~Af6' O~2

- ~'aS2~2~, ~

/~,J93 Work Order ýT Description - Work Against k Statu, 53102272470 PM, 1 YEAR (JULIAN) - CALIBRATE TT-6928 M2TT-6928 85 53102385852 CHECK ELECTRICAL CONNECTIONS IN SUPPORT OF AWO M2TT-6928 42 53102272470 53102386282 PM, 1 YEAR (JULIAN) - CALIBRATION OF TT-6928 & TI-6928 M2TT-6928 85 53102399552 FTPM: PM, 5 YEAR (Julian) - Instrument Calibration M2TE-6928 20 53102467528 PM, 1 YEAR (JULIAN) - CALIBRATION OF TT-6928 &T!-6928 M2TT-6928 22 53M20015889 PMMS MODEL: REPLACE TT-6928 AND TE-6928 TO SUPPORT M2TE-6928 85 UNCERTAINTY CAL 53M20115672 INSTALL AMPHENOL CONNECTORS PER CRED CR-01-10048 M2TT-6928 85 53M20210619 M2TI-6928 85 53M20702181 REPLACE FLEXIBLE CONDUIT* NOTIFY OPERATIONS PRIOR M2TI-6928 . 85 TO PERFORMING WORK.* VERIF 53M20707631 PM, 1 YEAR (JULIAN) -- CALIBRATE TE-6928 M2TE-6928 85 53M29215412 MODIFY TEMPERATURE INDICATION PER PDCR 2-13-91. M2TI-6928 85 PROVIDE PMMS WITH A 53M29308216 REPLACE EXISTING TRANSMITER WITH NEW VERSION. M2TT-6928 85 RECORD MODEL, SERIAL 53M29408713 CAL. CHECK TI-6928, (75?F IS MOST CRITICAL POINT) M2TI-6928 85 53M29902245 THIS IS AN ADMINISTRATIVE AWO - NO WORK WAS M2TI-6928 85 PERFORMED USING 53M29908668 REPLACE TE-6928 EVERY 10 YEARS TP SUPPORT M2TE-6928 85 UNCERTAINTY CALCULATION 98-ENG-02405-_

Select Records Device number 6928 Replace and detector and calibrate - Work Order 53M20707631 Calibrate the Temperature Element every 5 years -Work Order 53102399552 One year PM to calibrate the TT and TI - Work Order 53102467528 Please note the work order numbers change each time the work is completed.

Same process for 6929 and 6930

J

ý?-&,J6:,0ý0-ý eV),

(pd1/4( edd IJ0 Y), Ptje ?-0f S REPLACE RTD AND PERFORM WIRE CHECK FROM RTD TO 53M29308249 TRANSMITTER. M2TE-6929 85 53M29908669 REPLACE TE-6929 EVERY 10 YEARS TO SUPPORT M2TE-6929 85 UNCERTAINTY CALCULATION 98-53M20151 0 PMMS MODEL: REPLACE TE-6929 EVERY 10 YEARS TO M2TE-6929 85 SUPPORT UNCERTAINTY CAL 53M20707633 PM, 1 YEAR (JULIAN) - CALIBRATE TE-6929 M2TE-6929 85 53M29408714 CAL. CHECK TI-6929, (75?F IS MOST CRITICAL POINT) M2TI-6929 85 53M29902241 THIS IS AN ADMINISTRATIVE AWO - NO WORK WAS M2TI-6929 85 PERFORMED USING 53M29308218 REMOVE TRANSMITTER AND RETURN TO VENDOR FOR M2TT-6929 85 53M29308218 SOFTWARE UPGRADE. TRANSM M 53102286338 PM, 1 YEAR (JULIAN) -- CALIBRATE TT-6929 M2TT-6929 85 53M20115673 INSTALL AMPHENOL CONNECTORS PER CRED CR-01-10048 M2TT-6929 85 53102371459 PM, 1 YEAR (JULIAN) - CALIBRATION OF TT-6929 &TI-6929 M2TT-6929 85 53M29308253 INSTALL TRANSMITTER AND CALIBRATE PER VENDOR TECH M2TT-6929 85 MANUAL.

53102455638 PM, 1 YEAR (JULIAN) -- CALIBRATION OF TT-6929 &Ti-6929 M2TT-6929 35 53M20210620 M2TI-6929 85 53M29215420 MODIFY TEMPERATURE INDICATION PER PDCR 2-13-91. M2TI-6929 85 53M29215420 PROVIDE PMMS WITH A __________ 85 53M29700513 1) REPLACE SEALTIGHT. M2TE-6929 85 53102399555 JFTPM; PM, 5 YEAR (Julian) - Instrument Calibration JM2TE-6929 ý2o

-Sj eV 3 of 3 53M29308250 REPLACE RTD AND PERFORM WIRE CHECK FROM RTD TO TRNMTE.M2TE-6930 85

______TRANSMITTER.....

53M29908670 REPLACE TE-6930 EVERY 10 YEARS TO SUPPORT M2TE-6930 85 UNCERTAINTY CALCULATION 98-ENG-02405-53M20101199 PMMS MODEL: REPLACE TE-6930 EVERY 10 YEARS TO M2TE-6930 85 SUPPORT UNCERTAINTY CAL 153M29308257 REPLACE AND CALIBRATE METER (SIC# 80000966). PERFORM M2TI-6930 85 IN CONJUN 53M29408715 CAL. CHECK TI-6930, ( 75?F IS MOST CRITICAL POINT) M2TI-6930 85 53102451748 PM, 1 YEAR (JULIAN) -- CALIBRATION OF TT-6930 &TI-6930 M2TT-6930 42 53M29308219 REMOVE TRANSMITTER AND RETURN TO VENDOR FOR M2TT-6930 85 SOFTWARE UPGRADE. TRANSM 53M20115674 INSTALL AMPHENOL CONNECTORS PER CRED CR-01-10048 M2TT-6930 85 53102275363 PM, 1 YEAR (JULIAN) -- CALIBRATE TT-6930 M2TT-6930 85 53102367833 PM, 1 YEAR (JULIAN) -- CALIBRATION OF TT-6930 &TI-6930 M2TT-6930 85 53M29308254 INSTALL TRANSMITTER AND CALIBRATE PER VENDOR TECH M2TT-6930 85 VMANUAL.

53M29902242 THIS IS AN ADMINISTRATIVE AWO - NO WORK WAS M2TI-6930 85 53M2990224 PERFORMED USING 53M29215421 MODIFY TEMPERATURE INDICATION PER PDCR 2-13-91. M2TI-6930 85 PROVIDE PMMS WITH A 53M20707632 PM, 1 YEAR (JULIAN) -- CALIBRATE TE-6930 M2TE-6930 85 53102399558 FTPM: PM, 5 YEAR (Julian) - Instrument Calibration M2TE-6930 20

_ _ _ _ _ I __ _ _ __ _ _ __ _ _ _ __ _ _ _ _,__

.. . .......... ..... ... .. .___