ML16133A117

From kanterella
Revision as of 02:32, 5 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NRR E-mail Capture - MF7280 - Supplemental Draft RAI Regarding the Proposed FitzPatrick Administrative Technical Specification Amendment for Staffing and Training Upon Permanent Reactor Shutdown
ML16133A117
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 05/06/2016
From: Huffman W
Plant Licensing Branch IV
To: Drews W
Entergy Nuclear Operations
References
MF7280
Download: ML16133A117 (3)


Text

NRR-PMDAPEm Resource From: Huffman, William Sent: Friday, May 06, 2016 7:12 AM To: Bill Drews (WDrews1@entergy.com); Hawes, Mark Cc: Huckabay, Victoria; Lamb, John; Khanna, Meena; Grover, Ravinder

Subject:

MF7280 - Supplemental Draft RAI Regarding the Proposed FitzPatrick Administrative Technical Specification Amendment for Staffing and Training Upon Permanent Reactor Shutdown SUPPLEMENTAL DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED CHANGES TO TECHNICAL SPECIFICATION ADMINISTRATIVE CONTROLS FOR STAFFING AND TRAINING UPON PERMANENT CESSATION OF OPERATION JAMES A. FITZPATRICK NUCLEAR POWER PLANT ENTERGY NUCLEAR OPERATIONS, INC DOCKET NO. 50-333 RENEWED FACILITY OPERATING LICENSE NO. DPR-59 By letter dated January 15, 2016 (ADAMS Accession Number ML16015A456; CAC MF7280), Entergy Nuclear Operations (ENO) submitted a License Amendment Request (LAR) for the James A. FitzPatrick Nuclear Power Plant (JAF) Technical Specifications (TS). On March 16, 2016, ENO certified, pursuant to 10 CFR 50.82(a)(1)(i)

, that JAF would be permanently shut down on January 27, 2017 (ADAMS Accession Number ML16076A391).

Once certifications for permanent cessation of operation and permanent removal of fuel from the reactor are submitted to the NRC, certain TS administrative controls may no longer be applicable. Therefore, ENO is requesting approval of changes to the staffing and training requirements in Section 5.0, Administrative Controls, of the JAF TSs that ENO considers appropriate for a permanently shutdown reactor and consistent with the defueled TSs of other decommissioning power reactors.

On April 14, 2016, the staff issued a draft request for additional information (RAI) (ADAMS No. ML16109A256) on Entergys proposed JAF technical specification changes to administrative controls for staffing and training upon permanent cessation of operation (MF7280).

The NRC staff has determined that additional information is needed based on review by the technical specification branch.

This request for additional information (RAI) is identified as draft at this time to confirm your understanding of the RAIs and of the information needed to complete our evaluation. If the request for information is understood, please respond to this RAI within 30 days of the date of this request. Note that this RAI has been numbered to sequentially follow the previous RAIs issued on April 14, 2014.

Please call me at 301-415-2046 if you would like to set up a conference call to clarify the request for information.

Respectfully, Bill Huffman Project Manager NRR/DORL/LPL4-2 U.S. Nuclear Regulatory Commission 1

RAI-5 Please review TS Section 1.1, Definitions, for inclusion of term CERTIFIED FUEL HANDLER.

2

Hearing Identifier: NRR_PMDA Email Number: 2839 Mail Envelope Properties (William.Huffman@nrc.gov20160506071200)

Subject:

MF7280 - Supplemental Draft RAI Regarding the Proposed FitzPatrick Administrative Technical Specification Amendment for Staffing and Training Upon Permanent Reactor Shutdown Sent Date: 5/6/2016 7:12:09 AM Received Date: 5/6/2016 7:12:00 AM From: Huffman, William Created By: William.Huffman@nrc.gov Recipients:

"Huckabay, Victoria" <Victoria.Huckabay@nrc.gov>

Tracking Status: None "Lamb, John" <John.Lamb@nrc.gov>

Tracking Status: None "Khanna, Meena" <Meena.Khanna@nrc.gov>

Tracking Status: None "Grover, Ravinder" <Ravinder.Grover@nrc.gov>

Tracking Status: None "Bill Drews (WDrews1@entergy.com)" <WDrews1@entergy.com>

Tracking Status: None "Hawes, Mark" <mhawes@entergy.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2523 5/6/2016 7:12:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

NRR-PMDAPEm Resource From: Huffman, William Sent: Friday, May 06, 2016 7:12 AM To: Bill Drews (WDrews1@entergy.com); Hawes, Mark Cc: Huckabay, Victoria; Lamb, John; Khanna, Meena; Grover, Ravinder

Subject:

MF7280 - Supplemental Draft RAI Regarding the Proposed FitzPatrick Administrative Technical Specification Amendment for Staffing and Training Upon Permanent Reactor Shutdown SUPPLEMENTAL DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED CHANGES TO TECHNICAL SPECIFICATION ADMINISTRATIVE CONTROLS FOR STAFFING AND TRAINING UPON PERMANENT CESSATION OF OPERATION JAMES A. FITZPATRICK NUCLEAR POWER PLANT ENTERGY NUCLEAR OPERATIONS, INC DOCKET NO. 50-333 RENEWED FACILITY OPERATING LICENSE NO. DPR-59 By letter dated January 15, 2016 (ADAMS Accession Number ML16015A456; CAC MF7280), Entergy Nuclear Operations (ENO) submitted a License Amendment Request (LAR) for the James A. FitzPatrick Nuclear Power Plant (JAF) Technical Specifications (TS). On March 16, 2016, ENO certified, pursuant to 10 CFR 50.82(a)(1)(i)

, that JAF would be permanently shut down on January 27, 2017 (ADAMS Accession Number ML16076A391).

Once certifications for permanent cessation of operation and permanent removal of fuel from the reactor are submitted to the NRC, certain TS administrative controls may no longer be applicable. Therefore, ENO is requesting approval of changes to the staffing and training requirements in Section 5.0, Administrative Controls, of the JAF TSs that ENO considers appropriate for a permanently shutdown reactor and consistent with the defueled TSs of other decommissioning power reactors.

On April 14, 2016, the staff issued a draft request for additional information (RAI) (ADAMS No. ML16109A256) on Entergys proposed JAF technical specification changes to administrative controls for staffing and training upon permanent cessation of operation (MF7280).

The NRC staff has determined that additional information is needed based on review by the technical specification branch.

This request for additional information (RAI) is identified as draft at this time to confirm your understanding of the RAIs and of the information needed to complete our evaluation. If the request for information is understood, please respond to this RAI within 30 days of the date of this request. Note that this RAI has been numbered to sequentially follow the previous RAIs issued on April 14, 2014.

Please call me at 301-415-2046 if you would like to set up a conference call to clarify the request for information.

Respectfully, Bill Huffman Project Manager NRR/DORL/LPL4-2 U.S. Nuclear Regulatory Commission 1

RAI-5 Please review TS Section 1.1, Definitions, for inclusion of term CERTIFIED FUEL HANDLER.

2

Hearing Identifier: NRR_PMDA Email Number: 2839 Mail Envelope Properties (William.Huffman@nrc.gov20160506071200)

Subject:

MF7280 - Supplemental Draft RAI Regarding the Proposed FitzPatrick Administrative Technical Specification Amendment for Staffing and Training Upon Permanent Reactor Shutdown Sent Date: 5/6/2016 7:12:09 AM Received Date: 5/6/2016 7:12:00 AM From: Huffman, William Created By: William.Huffman@nrc.gov Recipients:

"Huckabay, Victoria" <Victoria.Huckabay@nrc.gov>

Tracking Status: None "Lamb, John" <John.Lamb@nrc.gov>

Tracking Status: None "Khanna, Meena" <Meena.Khanna@nrc.gov>

Tracking Status: None "Grover, Ravinder" <Ravinder.Grover@nrc.gov>

Tracking Status: None "Bill Drews (WDrews1@entergy.com)" <WDrews1@entergy.com>

Tracking Status: None "Hawes, Mark" <mhawes@entergy.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2523 5/6/2016 7:12:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: