NTROLLED DOCUME" 1
Page 20 of 82 Window No.
Procedure Number 40AL-9RIVB Revision 00.05 2B08A RC LO TEMP OVER PRESS Page 1 of 3 IAT WIND W INDEX IBLE A E SETPIEINT A RCYS22 SDC Isolation Valve Train A Alignment RC Loop Temp
<260 F and UV-651 or 653 OR UV-652 or 654 CLOSED RCYS23 SDC Isolation Valve Train B Alignment RC Loop Temp
<260 F and UV-651 or 653
.OR UV-652 or 654 CLOSED RCYS24 Low Temp Overpressure (LTOP) RC System Press
> 410 psia*
~And when one of the following conditions exist; Safety Injection SDC Isolation VLVUV-651 Not Full Closed and Safety Injection SDC Isolation VLVUV-653 Not Full Closed or Safety Injection SDC Isolation VLVUV-652 Not Full Closed and Safety Injection SDC Isolation VLVUV-654 Not Full Closed.
9209250254 920903 PDR ADOCK 05000528 PDR
a 0
~
' I ~
~ ~
I ~ II I ~ ~ ~
ol ~
~
~ I ~ 0 I ~ ~ ~
~ ~
~
~ ~
~
' ~ ~
' ' ~ ~ ~ ~ I ' ~ ~ I I ~
~ .I I ~ I I I I ~ ' ~ ~ ~ Ii . ~ ~
~ ~ ~
~ ~
~ ~
~ '
I ~
~ ~
~ I I I ~
~ I ~ ~ I I ~
' ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ I
~ I I ~ ~ ~ ~ ~ ~
~ ~ ' ~ ~ ~ ~ ~
~
P ~
~
I 4f
CONTROLLED DOCUME'rocedure Number 40AL-9RIKB Page 22 of 82 Revision 00.05 Window No.
2BOSA dow Labe] RC LO TEMP OVER PRESS Page 3 of 3 RESPONSE SECTION QRR)QP B PT. ID POSSIBLE CAUSE SETPOINT RCYS24 Low Temp Overpressure (LTOP) RC System Press
> 410 psia and UV-651 and UV-653 OR UV-652 and UV-654 NOT FULLYCLOSED A~A None Monitor the following on Panel B02 to verify pressure and the validity of the alarm.
~ PRESSURIZER PRESSURE, RCA-PI-103
~ PRESSURIZER PRESSURE, RCB-PI-104
~ PRESSURIZER PRESSURE, RCC-PI-105
~ PRESSURIZER PRESSURE, RCD-PI-106
- 2. Determine the cause of the overpressure condition.
Ifthe Low Temperature Overpressure Relief Valves are in service, correct the causes of the pressure transient.
- 2. Warn personnel in Containment of the possible radiological hazard.
- 3. Ifthe LTOP Relief Valves were originally isolated, close/check closed the following valves on Panel B02:
~ RC LOOP 1 S/D CLG-LPSI PUMP A SUCT VLV, SIA-UV-651
~ RC LOOP 1 S/D CLG-LPSI PUMP A SUCT VLV, SIC-UV-653 RC LOOP 2 S/D CLG-LPSI PUMP B SUCT VLV, SIB-UV-652
~ RC LOOP 2 S/D CLG-LPSI PUMP B SUCT VLV, SID-UV-654
- 4. Perform independent verification on all applicable valves, breakers and components that were operated by this alarm response per 02AC-OZZ01, Independent Verification of Valves, Breakers and Components.