IR 05000348/2006007

From kanterella
Revision as of 04:49, 23 January 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Download: ML062830061

Text

DOCUMENT CONTAINS ENCLOSURE CONTAINS UPON SEPARATION THISPAGE IS DECONTROLLED September 27, 2006Southern Nuclear Operating Company, Inc.ATTN:Mr. H. L. SumnerVice PresidentP. O. Box 1295 Birmingham, AL 35201

SUBJECT: FARLEY NUCLEAR PLANT - NRC SECURITY INSPECTION REPORT05000348/2006007 AND 05000364/2006007

Dear Mr. Sumner:

On September 1, 2006, the U. S. Nuclear Regulatory Commission (NRC) completed a securitybaseline inspection at your Farley Nuclear Plant. Portions of the Access Authorization and Fitness For Duty inspection procedures were completed at the Southern Nuclear Company Corporate Office on August 11, 2006. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspectionreport documents the inspection results, which were discussed with Mr. D. Burford, at thecorporate office on August 11, 2006, and with Mr. R. Johnson, and other members of your staffat the site on September 1, 2006. This inspection examined activities conducted under your license as they relate to security andcompliance with the Commission's rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.Based on the results of this inspection no findings of significance were identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMSis accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the PublicElectronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390 a copy of this letter's enclosure will not beavailable for public inspection.

DOCUMENT CONTAINS SNC2DOCUMENT CONTAINS ENCLOSURE CONTAINS UPON SEPARATION THISPAGE IS DECONTROLLEDIn accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements foryour response, if any. This practice will ensure that your response will not be made availableelectronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptableresponse, please provide the level of protection described in 10 CFR 73.21. Otherwise, markyour entire response "Security Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390 (b)(1).

Sincerely,/RA/Brian R. Bonser, ChiefPlant Support Branch Division of Reactor SafetyDocket No.: 50-348, 50-364License No:NPF-2, NPF-8

Enclosure:

NRC Inspection Report No. 05000348/2006007 and 05000364/2006007

w/Attachment:

Supplemental Information (Safeguards Information)cc w/encl:B. D. McKinney, Licensing Services Manager, B-031 Southern Nuclear Operating Company, Inc.

42 Inverness Center Parkway Birmingham, AL 35201-1295J. R. JohnsonGeneral Manager, Farley Plant Southern Nuclear Operating Company, Inc.

P. O. Box 1295 Birmingham, AL 35201-1295cc w/o encl: (See page 3)

DOCUMENT CONTAINS SNC3DOCUMENT CONTAINS ENCLOSURE CONTAINS UPON SEPARATION THISPAGE IS DECONTROLLEDcc w/o encl:J. T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc.

P. O. Box 1295 Birmingham, AL 35201-1295Bentina C. TerrySouthern Nuclear Operating Company, Inc.

Bin B-022 P. O. Box 1295 Birmingham, AL 35201-1295State Health OfficerAlabama Department of Public Health RSA Tower - Administration Suite 700 P. O. Box 303017 Montgomery, AL 36130-3017M. Stanford BlantonBalch and Bingham Law Firm P. O. Box 306 1710 Sixth Avenue North Birmingham, AL 35201William D. OldfieldQuality Assurance Supervisor Southern Nuclear Operating Company P. O. Box 470 Ashford, AL 36312Distribution w/encl:B. Westreich, NSIR E. McNiel, NSIRDistribution w/o encl:R. Martin, NRR RIDSNRRDIRS PUBLIC DOCUMENT CONTAINS SNC2DOCUMENT CONTAINS ENCLOSURE CONTAINS UPON SEPARATION THISPAGE IS DECONTROLLEDIn accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements foryour response, if any. This practice will ensure that your response will not be made availableelectronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptableresponse, please provide the level of protection described in 10 CFR 73.21. Otherwise, markyour entire response "Security Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390 (b)(1).

Sincerely,/RA/

Brian R. Bonser, ChiefPlant Support Branch Division of Reactor SafetyDocket No.: 50-348, 50-364License No:NPF-2, NPF-8

Enclosure:

NRC Inspection Report No. 05000348/2006007 and 05000364/2006007

w/Attachment:

Supplemental Information (Safeguards Information)cc w/encl:B. D. McKinney, Licensing Services Manager, B-031 Southern Nuclear Operating Company, Inc.

42 Inverness Center Parkway Birmingham, AL 35201-1295J. R. JohnsonGeneral Manager, Farley Plant Southern Nuclear Operating Company, Inc.

P. O. Box 1295 Birmingham, AL 35201-1295cc w/o encl: (See page 3)XG PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLEG SENSITIVEXG NON-SENSITIVEADAMS: XG YesACCESSION NUMBER:_________________________(FOR LETTER ONLY) OFFICERII:DRSRII:DRSRII:DRSRII:DRPRII:DRPRII:DRPSIGNATURERARARARANAMEDForbesJSheheeBBonserSShaefferDATE9/27/20069/27/20069/27/20069/27/2006E-MAIL YESNO YESNO YESNO YESNO YESNO PUBLICYESw/o SGIOFFICIAL RECORD COPY DOCUMENT NAME: E:\Filenet\ML062830061.wpd