ML19320C064

From kanterella
Revision as of 03:53, 1 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Rept for June 1980
ML19320C064
Person / Time
Site: Crystal River 
Issue date: 07/01/1980
From: Culver M
FLORIDA POWER CORP.
To:
Shared Package
ML19320C061 List:
References
NUDOCS 8007150713
Download: ML19320C064 (3)


Text

_ __

-. ,l OPERATING DATA REPORT s

DOCKET NO. 50-302 DATE 7/1/80 CO51PLETED BY M. W. culver TELEPHONE tonn m-6486 OPERATING STATUS Crystal River Unit 3 Notes

1. Unit Name.
2. Reporting Period: A /1/An - A / in/nn
3. Licensed Thermal Power (SIWt): 2452
4. Nameplate Rating (Gross SIWE 1: 890
5. Design Electiical Ratm Net SlWe): 825
6. 51ssimum Dependable capacity (Gross 51We):

821 82

7. Staximum Dependable Capacity (Net 51We):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:
9. Poaer Lere! To Which Restricted.If Any (Net 51Wep: yene
10. Reasons For Restrictions. If Any:

This 31onth Yr..to.Date Cumulative

11. Hours in Reporting Period 720 4367 28943
12. Number Of Hours Reactor Was Critical 0 1305.5 16455.8
13. Reactor Reserve Shutdown Hours 0 0 1116.9
14. Hours Generator On Line 0 1297.4 15997.6
15. Unit Resene Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (.\1WH) 0 3085927 35402838
17. Gross Electrical Energy Generated (51WH) 0 - 1058396 12030164 lb. Net Electrical Energy Generated (5:WH1 0 1009335 11400975
19. Unit Service Factor 0 29.7% 55.3%
20. Unit Asailability Factor 0 29.7% 55.3%
21. Unit Capacity Factor (Using 51DC Net) 0 29.6% 50.4%
22. Unit Capacity Factor (Using DER Net) 0 28.0% 47.8%
23. Unit Forced Outage Rate 0 18.0% 34.4%
24. Shutdowns Scheduled Oser Next 6.\lonths (Type.Date,and Duration of Eache:

continuing refueling outage

25. If Shut Down At End Of Report Period. Estimated Date of Startup: 7/14/80
26. Units in Test Status (Prior to Commercial Operationi: Forecast Achiesed INITIAL CRITICALITY 1/14/77 INITIAL ELECTRICITY 1/30/77 CO\l51ERCI AL OPER ATION 3/13/77 o

8007150 %

+

AVERAGE D 41LY UNIT POWER LEVEL p,

DOCKET NO. 50-302 gg.lT FLCRP-3 DATE 7/11/80

't COMPLETED BY M. W. culver TELEPHONE (904)795-6486 MONTH June 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL tMWe-Net) , (ywe.g. ,

1 0 -

37 o 2 0 gg o 3 0 g9 0 -

l 0 0 4 20 5 0 33 o 6 0 , o 22 7

0 ,J o

8 ~0 24 0

9 0 ,3 o 10 0 0 26 O o 1I 27 0 o 12 2S 0 0

, 13 29 0 o I4 30

> 0 o

.15 3

I 16 -

0 \

INSTRUC110NS l On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to l the nearest whole megawatt.

l' (9/77)

50-302 DOCKET NO.

UNIT SIIUIDOWNS AND POWER REDUCTIONS UNIT NAME FLCRP-3 DATE ~7/1/80 COMPLETED BY M_ w_ culvor REPORT MONTil June f 9 0 4 1 7 0'i- 6 d a n ,

TELEPHONE

)

, 3E 3j$ Y Licensee E t, "L Cause A Corrective Attion to No. Ihte g 3g jj& Event g'g mU pu F

$2 5 35g Report # o u

Prevent Recurrence 0

80-9 800601 s 720 C 4 N/A ZZ ZZZZZZ Continuation of the refueling outage begun on 3/7/80 a

i 1

i I 2 3 4 F: Forced Reason: Metluxt: Exhibit G - Instructions S: Schninleil A liquipment Failure (Explain) 1-Manual for Preparation of Data ll-Maintenance of Test 2 Manual Scram. Entry Sheets for I,icensee C. Refueling 3-Automatic Scram. Event ReporI (l.ER) File (NtlRI.G-D Regulatory Restriction 4-Other ( Explain) 0161)

! li Operator Train;ng & l.icense Examination F Administrative 5 G Operational Error (Explain) I'xhibit 1 - Same Source i 19/77) II Other (Explain)

<