ML19320C064

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for June 1980
ML19320C064
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/01/1980
From: Culver M
FLORIDA POWER CORP.
To:
Shared Package
ML19320C061 List:
References
NUDOCS 8007150713
Download: ML19320C064 (3)


Text

_ __

,l OPERATING DATA REPORT s

DOCKET NO. 50-302 DATE 7/1/80 CO51PLETED BY M.

W.

culver TELEPHONE tonn m-6486 OPERATING STATUS Notes

1. Unit Name.

Crystal River Unit 3

2. Reporting Period: A /1/An - A / in/nn
3. Licensed Thermal Power (SIWt): 2452
4. Nameplate Rating (Gross SIWE 1: 890 825
5. Design Electiical Ratm Net SlWe):

821

6. 51ssimum Dependable capacity (Gross 51We):

82

7. Staximum Dependable Capacity (Net 51We):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:
9. Poaer Lere! To Which Restricted.If Any (Net 51Wep:

yene

10. Reasons For Restrictions. If Any:

This 31onth Yr..to.Date Cumulative 720 4367 28943

11. Hours in Reporting Period 0

1305.5 16455.8

12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0

0 1116.9 0

1297.4 15997.6

14. Hours Generator On Line
15. Unit Resene Shutdown Hours 0

0 0

0 3085927 35402838

16. Gross Thermal Energy Generated (.\\1WH) 0 1058396 12030164
17. Gross Electrical Energy Generated (51WH) 0 1009335 11400975 lb. Net Electrical Energy Generated (5:WH1 0

29.7%

55.3%

19. Unit Service Factor 0

29.7%

55.3%

20. Unit Asailability Factor 0

29.6%

50.4%

21. Unit Capacity Factor (Using 51DC Net) 0 28.0%

47.8%

22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 0

18.0%

34.4%

24. Shutdowns Scheduled Oser Next 6.\\lonths (Type.Date,and Duration of Eache:

continuing refueling outage

25. If Shut Down At End Of Report Period. Estimated Date of Startup: 7/14/80
26. Units in Test Status (Prior to Commercial Operationi:

Forecast Achiesed 1/14/77 INITIAL CRITICALITY INITIAL ELECTRICITY 1/30/77 CO\\l51ERCI AL OPER ATION 3/13/77 o

8007150 %

+

AVERAGE D 41LY UNIT POWER LEVEL p,

DOCKET NO. 50-302 FLCRP-3 gg.lT DATE 7/11/80 COMPLETED BY M. W.

culver

't TELEPHONE (904)795-6486 June 1980 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL tMWe-Net)

(ywe.g.,

1 0

37 o

2 0

o gg 0

0 3

g9 l

0 0

4 20 5

0 33 o

0 o

6 22 0

o 7

,J 8

~0 0

24 9

0 o

,3 10 0

0 26 O

o 1I 27 0

o 12 2S 0

0 13 29 0

o I4 30 0

o

.15 3

I 16 -

\\

0 INSTRUC110NS l

On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to l

the nearest whole megawatt.

l' (9/77)

50-302 DOCKET NO.

UNIT SIIUIDOWNS AND POWER REDUCTIONS UNIT NAME FLCRP-3 DATE ~7/1/80 COMPLETED BY M_ w_ culvor REPORT MONTil June TELEPHONE f 9 0 4 1 7 0'i-6 d a n 3E 3

Y Licensee E t, "L

Cause A Corrective

)

No.

Ihte g

3g j$

jj&

Event g'g pu Attion to F

$2 5

35g Report #

mU Prevent Recurrence o

u 0

80-9 800601 s

720 C

4 N/A ZZ ZZZZZZ Continuation of the refueling outage begun on 3/7/80 a

i 1

i I

2 3

4 F: Forced Reason:

Metluxt:

Exhibit G - Instructions S: Schninleil A liquipment Failure (Explain) 1-Manual for Preparation of Data ll-Maintenance of Test 2 Manual Scram.

Entry Sheets for I,icensee C. Refueling 3-Automatic Scram.

Event ReporI (l.ER) File (NtlRI.G-D Regulatory Restriction 4-Other ( Explain) 0161) li Operator Train;ng & l.icense Examination F Administrative 5

G Operational Error (Explain)

I'xhibit 1 - Same Source i

19/77)

II Other (Explain)

<