ML20003A592
| ML20003A592 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 12/18/1980 |
| From: | Hancock J FLORIDA POWER CORP. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20003A591 | List: |
| References | |
| CS-80-290, NUDOCS 8102040348 | |
| Download: ML20003A592 (2) | |
Text
r 2 07bb4 _ . . . ,
I 4155Q6$, ' @ . 7 1- ~.
e w g.
'tO & p p 5 10 F C 22 N2 4E Florida December 18, 1980 c a .o,0. u .a ~P wer 3-0-3-a-2 CS-80-290 3-120-31 Mr. J, P. O'Reilly, Director Docket No. 50-302 Office of Inspection & Enforcement Licensee No DPR-72 U.S. Nuclear Regulatory Commission Ref: 80-33/RII:TFS Atlanta, GA 30303 50/302/80-33
Dear Mr. O'Reilly:
We offer the following responses to the Items of Noncompliance in the referenced report.
NOTICE OF VIOLATION A. Based on the NRC inspection September 2 - October 3, 1980, certain of your activities were apparently not conducted in full compliance with NRC requirements as indicated below:
- a. The intent of the original procedure is not altered,
- b. The change is approved by two members of the plant staff management staff, at least one of whom holds a Senior Reactor Operator's License on the unit affected,
- c. The change is documented, reviewed by the PRC and approved by the Nuclear Plant Manager within 14 days of implementation.
Contrary to the above, tn April 12, 1980, a temporary change was made to Surveillance Procedure SP-161, Remote Shutdown Instru-ment Calibration, without the approval of two members of the plant management staff and was not reviewed by the PRC and ap-proved by the Nuclear Plant Manager within 14 days of in. 'ementa-tion.
A. Response: As a result of this event, appropriate plant procedures have been reviewed with the cognizant supervisers to assure their understanding of the consequences of noncompliance with procedures, A modification (80-9-76) has been initiated to install 0-3000 psig pressure gauges in place of the 0-2000 psig gauges. In addition, a revision will be submitted to Surveillance Procedure SP-161, Remote Shutdown Instrumentation Calibration to change the appropriate 810 204 0 h General Office 3201 in.rty-fourtn street soutn . P O Box 14042. st Petersburg. Fionda 33733 813 - 866-5151
r i,3 Notice of Violation Response-Ref: 80-33/RII:TFS Page 2 pressure indicator calibration sheets to conform to the higher range gauges.
Full compliance will be achieved upon procurement of the gauges which is anticipated prior to 1 May 1981.
Should you have any further questions, please contact us.
Very truly yours, o FLORIDA POWER CORPORATION M
O 7" Nuclear Plant Manager J. A. Hancock #
Assistant Vice President Nuclear Operations KFL/rc w -. , p 1
, - .