r 07bb4 2
4155Q6$,
' @. 7 1-
~.
I e w g.
'tO & p p 5
10 F C 22 N2 4 E Florida c a.o,0. u.a ~P wer December 18, 1980 3-0-3-a-2 CS-80-290 3-120-31 Mr. J, P. O'Reilly, Director Docket No. 50-302 Office of Inspection & Enforcement Licensee No DPR-72 U.S. Nuclear Regulatory Commission Ref:
80-33/RII:TFS Atlanta, GA 30303 50/302/80-33
Dear Mr. O'Reilly:
We offer the following responses to the Items of Noncompliance in the referenced report.
Based on the NRC inspection September 2 - October 3, 1980, certain of your activities were apparently not conducted in full compliance with NRC requirements as indicated below:
a.
The intent of the original procedure is not altered, b.
The change is approved by two members of the plant staff management staff, at least one of whom holds a Senior Reactor Operator's License on the unit affected, c.
The change is documented, reviewed by the PRC and approved by the Nuclear Plant Manager within 14 days of implementation.
Contrary to the above, tn April 12, 1980, a temporary change was made to Surveillance Procedure SP-161, Remote Shutdown Instru-ment Calibration, without the approval of two members of the plant management staff and was not reviewed by the PRC and ap-proved by the Nuclear Plant Manager within 14 days of in. 'ementa-tion.
A.
Response
As a result of this event, appropriate plant procedures have been reviewed with the cognizant supervisers to assure their understanding of the consequences of noncompliance with procedures, A modification (80-9-76) has been initiated to install 0-3000 psig pressure gauges in place of the 0-2000 psig gauges.
In addition, a revision will be submitted to Surveillance Procedure SP-161, Remote Shutdown Instrumentation Calibration to change the appropriate 810 204 0 h General Office 3201 in.rty-fourtn street soutn. P O Box 14042. st Petersburg. Fionda 33733 813 - 866-5151
r i,3 Notice of Violation Response-Ref: 80-33/RII:TFS Page 2 pressure indicator calibration sheets to conform to the higher range gauges.
Full compliance will be achieved upon procurement of the gauges which is anticipated prior to 1 May 1981.
Should you have any further questions, please contact us.
Very truly yours, o
FLORIDA POWER CORPORATION O
M 7"
Nuclear Plant Manager J. A. Hancock Assistant Vice President Nuclear Operations KFL/rc w -.,