ML19317E608
| ML19317E608 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 10/09/1976 |
| From: | Bare L DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML19317E604 | List: |
| References | |
| NUDOCS 7912180808 | |
| Download: ML19317E608 (3) | |
Text
- -
.
- UNIT ,Octn;o Unit 2
- 'N 1/9/76 DOCKETDATE NO. ~ 50-270
- PREPARED BY L. J. Bare OPERATING STATUS
- 1. REPORTING PERIOD: September 1 THROUGH September' 30. 1976 GROSS HOURS IN REPORTING PERIOD: 720.00
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net): 871 _
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)
- 4. REASONS FOR RESTRICTION (IF ANY)
This Month Year to Date Cumulative
- 5. NUMBER OF HOURS THE REACTOR WAS CRITICAL 714.1 3952.4 12511.5
- 6. REACTOR RESERVE SHUTDOWN HOURS
- 7. HOURS GENERATOR ON-LINE 704.9 3793.0 12072.5
- 8. UNIT RESERVE SHUTDOWN HOURS -
_
_
- 9. GROSS THERMAL ENERGY GENERATED (MWH) 1728522 8985952 ,
28658380
- 10. GROSS ELECTRICAL ENERGY GENERATED 3038540 9759096 (ygg) 594910
- 11. NET ELECTRICAL ENERGY GENERATED -
2900005 9255156 567209 (3gg)
- 12. REACTOR SERVICE FACIOR 99.2 60.1 69.2 58.2 67.4
- 13. REACTOR AVAIIABILITY FACTOR _100.0
- 14. UNIT SERVICE FACTOR 97.9 57.7 66.8
- 15. UNIT AVAILABILITY FACTOR 97.9 _57.7 ,
66.8
- 16. UNIT CAPACITY FACTOR (Using Net 90.5 50.6 58.8 Capability)
,
- 17. UNIT CAPACITY FACTOR (Using Design Mwe) 88.8 , 49.7 58.8*
,
i
-l
- 18. UNIT FORCED OUTAGE RATE 2.1 27.0 25.7
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
- 20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: h
[
REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAT. X 100
!!OURS IN REPORTING PERIOD REACTOR AVAILtSILI1Y FACTOR = IIOWdS REACTOR L'AS* AVAIL \RLE TO OPERATE X 100 110URS IN REPORTING PERIOD UNIT SERVICE PACTC;; = Il0PPS CENERATOR ON LTNE
!!OURS IN REPORTING PERIOD '
-
UNIT AVAILABILITY FACTOR = !! CURS UNIT WAS A'/\11 AOLE TO GE!!ERATE X 100 '
HOURS IN REPoliriNG PERIOD UNIT CAPACITY FACTcR = NET ELECTRICAL P0hER Gr.NTRATF1) -- Y 100 (N L C.spatillity or Design (P.we-Net.).1 X ll0URS LN Rt:Poh rM;C PERTOD UNIT FORCED OUTACE RATE = FonCrn OtiTAGE IIOURS X 100 HOURS GENERATOR ON 1.13E + FORCED CUfM; IOURS 7912180 w
. , .
. . I
.
50-270 j DOCKET NO. ~
UNIT Oconee Unit 2 -
.
DATE 10/9/76 i
.
AVERAGE DAILY UNIT POWER LEVEL MONTil september, 1916 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) .
DAY (MWe-net)
.
,
f:
gi7 1
814 17 I 809 18 679 2
816 776 h gg 3 l I
815 20 817 1 4
827 l 811 21-5 806 22 826 6
758 23 832 7
830 8 24 g
738 -
831 f 10
- 807 26 824 f 11 812 27 827 f k
816 28 826 12 Y 818 29 825 l 13 819 30 825 l 14 15 819 31 f 819 ]
16 i
l i
,
DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month. l l
Compute to the nearest whole megawatt.
.i These figures will be used to plot a graph for each reporting month. Note that by using maximum i
dependable capacity for the net electrical ratmg of the unit there may be occasions when the daily !
average power level exceeds the 100'~o line (or the restricted power level linet In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
.
l u
- m
.
.
.
DdCKET NO. 50-270 . .
- UNIT SHUTDOWNS ,
UNIT NAM 1i Oconce Unit 2 '
DATli 10/9/76
.
REPORT MONTil September, 1976 TYPE METHOD OF F FORCED DURATION SHUTTING DOWN NO. DATE S SCHEDULED (HOURS) REASON (1) THE REACTOR (2) CORRECTIVE ACTIONS / COMMENTS 12 76-09 F 15.14 B 3 Speed amplifier circuit failure during '
a scheduled turbine trip test.
.
.
.
(1) REASON (2) MET 110D A EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL B- M AINT. OR TEST. 2-MANUAL C- REI'UELING SCRAM D-REGULATORY RESTRICTION 3- AUTP*1ATIC E-OPERATOR TRAINING AND SCRAA LICENSE EX AMIN AT10N F-ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)
I!-OTilLR (EXPLAIN)
.
.
SUMMARY
No major outages this month. -
-
.
.
'. ] . ..
1 - - - - _ -. - .
. -