Monthly Operating Rept for Sept 1976
ML19317E608
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 10/09/1976
From: Bare L
DUKE POWER CO.
To:
Shared Package
ML19317E604 List:
References
NUDOCS 7912180808
Download: ML19317E608 (3)


Text

- -

- UNIT ,Octn;o Unit 2

- 'N 1/9/76 DOCKETDATE NO. ~ 50-270

  • PREPARED BY L. J. Bare OPERATING STATUS
1. REPORTING PERIOD: September 1 THROUGH September' 30. 1976 GROSS HOURS IN REPORTING PERIOD: 720.00
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net): 871 _
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)
4. REASONS FOR RESTRICTION (IF ANY)

This Month Year to Date Cumulative

5. NUMBER OF HOURS THE REACTOR WAS CRITICAL 714.1 3952.4 12511.5
6. REACTOR RESERVE SHUTDOWN HOURS
7. HOURS GENERATOR ON-LINE 704.9 3793.0 12072.5
8. UNIT RESERVE SHUTDOWN HOURS -
9. GROSS THERMAL ENERGY GENERATED (MWH) 1728522 8985952 ,

28658380

10. GROSS ELECTRICAL ENERGY GENERATED 3038540 9759096 (ygg) 594910
11. NET ELECTRICAL ENERGY GENERATED -

2900005 9255156 567209 (3gg)

12. REACTOR SERVICE FACIOR 99.2 60.1 69.2 58.2 67.4
13. REACTOR AVAIIABILITY FACTOR _100.0
14. UNIT SERVICE FACTOR 97.9 57.7 66.8
15. UNIT AVAILABILITY FACTOR 97.9 _57.7 ,

66.8

16. UNIT CAPACITY FACTOR (Using Net 90.5 50.6 58.8 Capability)
17. UNIT CAPACITY FACTOR (Using Design Mwe) 88.8 , 49.7 58.8*

i

-l

18. UNIT FORCED OUTAGE RATE 2.1 27.0 25.7
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: h

[

REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAT. X 100

!!OURS IN REPORTING PERIOD REACTOR AVAILtSILI1Y FACTOR = IIOWdS REACTOR L'AS* AVAIL \RLE TO OPERATE X 100 110URS IN REPORTING PERIOD UNIT SERVICE PACTC;; = Il0PPS CENERATOR ON LTNE

!!OURS IN REPORTING PERIOD '

UNIT AVAILABILITY FACTOR = !! CURS UNIT WAS A'/\11 AOLE TO GE!!ERATE X 100 '

HOURS IN REPoliriNG PERIOD UNIT CAPACITY FACTcR = NET ELECTRICAL P0hER Gr.NTRATF1) -- Y 100 (N L C.spatillity or Design (P.we-Net.).1 X ll0URS LN Rt:Poh rM;C PERTOD UNIT FORCED OUTACE RATE = FonCrn OtiTAGE IIOURS X 100 HOURS GENERATOR ON 1.13E + FORCED CUfM; IOURS 7912180 w

. . I 50-270 j DOCKET NO. ~

UNIT Oconee Unit 2 -

DATE 10/9/76 i AVERAGE DAILY UNIT POWER LEVEL MONTil september, 1916 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) .

DAY (MWe-net) f:

gi7 1

814 17 I 809 18 679 2

816 776 h gg 3 l I

815 20 817 1 4

827 l 811 21-5 806 22 826 6

758 23 832 7

830 8 24 g

738 -

831 f 10

- 807 26 824 f 11 812 27 827 f k

816 28 826 12 Y 818 29 825 l 13 819 30 825 l 14 15 819 31 f 819 ]

16 i

l i

DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month. l l

Compute to the nearest whole megawatt.

.i These figures will be used to plot a graph for each reporting month. Note that by using maximum i

dependable capacity for the net electrical ratmg of the unit there may be occasions when the daily  !

average power level exceeds the 100'~o line (or the restricted power level linet In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

l u

  • m

DdCKET NO. 50-270 . .

  • UNIT SHUTDOWNS ,

UNIT NAM 1i Oconce Unit 2 '

DATli 10/9/76 REPORT MONTil September, 1976 TYPE METHOD OF F FORCED DURATION SHUTTING DOWN NO. DATE S SCHEDULED (HOURS) REASON (1) THE REACTOR (2) CORRECTIVE ACTIONS / COMMENTS 12 76-09 F 15.14 B 3 Speed amplifier circuit failure during '

a scheduled turbine trip test.

(1) REASON (2) MET 110D A EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL B- M AINT. OR TEST. 2-MANUAL C- REI'UELING SCRAM D-REGULATORY RESTRICTION 3- AUTP*1ATIC E-OPERATOR TRAINING AND SCRAA LICENSE EX AMIN AT10N F-ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)

I!-OTilLR (EXPLAIN)

SUMMARY

No major outages this month. -

'. ] . ..