Press Release-IV-06-012, NRC to Discuss 2005 Performance at Waterford Nuclear Plant

From kanterella
Revision as of 19:55, 7 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Press Release-IV-06-012: NRC to Discuss 2005 Performance at Waterford Nuclear Plant
ML061310104
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/11/2006
From:
Office of Public Affairs Region IV
To:
Category:Press Release
References
Press Release-IV-06-012
Download: ML061310104 (2)


Text

NRC NEWS U. S. NUCLEAR REGULATORY COMMISSION Office of Public Affairs Region IV 611 Ryan Plaza Drive - Suite 400 Arlington, TX 76011-4005 No. IV-06-012 May 11, 2006

Contact:

Victor Dricks E-Mail: opa4@nrc.gov Phone: 817-860-8128 NRC TO DISCUSS 2005 PERFORMANCE AT WATERFORD NUCLEAR PLANT Nuclear Regulatory Commission staff will meet with Entergy Operations officials on May 18, to discuss the NRCs annual assessment of safety performance at the Waterford 3 nuclear plant during 2005.

The 6:30 p.m. meeting at the James M. Cain Energy Education Center, 4224 Hwy. 3127, Killona, La., is open to public observation. Before the session ends, NRC staff will be available to answer questions on the plants safety performance, as well as the agencys role in ensuring safe plant operation.

Each year, the NRC assesses the performance of all of the nations commercial nuclear power plants, said Region IV Administrator Bruce S. Mallett. The meeting gives us an opportunity to discuss our findings with the company, local officials and members of the public.

We look forward to meeting with members of the community and answering any questions they may have about our oversight.

A letter sent from the NRC Region IV Office to plant officials addresses the performance of the plant during 2005 and will serve as the basis for the meeting discussion. It is available on the NRC web site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/wat_2005q4.pdf .

Overall, Waterford 3 operated safely during the period. The NRC uses color-coded inspection findings and performance indicators to assess nuclear power plant performance. The colors start with green and then increase to white, yellow or red, commensurate with the safety significance of the issues involved. Because all of the inspection findings and performance indicators for the plant during the last quarter of 2005 were determined to be green, Waterford 3 will receive a baseline (or routine) level of inspections during the upcoming assessment period.

Routine inspections are performed by two NRC Resident Inspectors assigned to the plant and by inspection specialists from the Region IV Office in Arlington, Texas. Among the areas of plant operations to be inspected during the next year by NRC specialists are emergency preparedness and radiological safety.

Current performance information for Waterford 3 is available on the NRC web site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/WAT3/wat3_chart.html .