Category:Letter
MONTHYEARML24268A3382024-10-16016 October 2024 Issuance of Amendment No. 253 Regarding the Modification of TS Surveillance Requirement 4.3.6.a Related to Adoption of TSTF-425, Revision 3 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP2L2890, Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6)2024-10-0404 October 2024 Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6) IR 05000220/20243022024-10-0303 October 2024 Initial Operator Licensing Examination Report 05000220/2024302 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24190A0012024-09-26026 September 2024 Issuance of Amendment Nos. 252 and 197 Regarding the Revision to Technical Specification Design Features Section to Remove Nine Mile Point Unit 3 Project Designation NMP1L3608, Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-09-20020 September 2024 Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000220/20240052024-08-29029 August 2024 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2024005 and 05000410/2024005) IR 05000220/20240102024-08-22022 August 2024 Age-Related Degradation Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3603, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan2024-08-20020 August 2024 Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000220/20240022024-08-0505 August 2024 Integrated Inspection Report 05000220/2024002 and 05000410/2024002 ML24215A3002024-08-0202 August 2024 Operator Licensing Examination Approval ML24213A1412024-07-31031 July 2024 Requalification Program Inspection NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-07-31031 July 2024 Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation NMP2L2883, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations2024-07-24024 July 2024 Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations ML24198A0852024-07-16016 July 2024 Senior Reactor and Reactor Operator Initial License Examinations RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3584, License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2024-06-13013 June 2024 License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000220/20244012024-05-30030 May 2024 Security Baseline Inspection Report 05000220/2024401 and 05000410/2024401(Cover Letter Only) ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 NMP1L3591, Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request2024-05-18018 May 2024 Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request NMP1L3589, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-05-16016 May 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable NMP1L3582, 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 22024-05-15015 May 2024 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 2 ML24158A2052024-05-15015 May 2024 Annual Radioactive Environmental Operating Report IR 05000220/20240012024-05-10010 May 2024 Integrated Inspection Report 05000220/2024001 and 05000410/2024001 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds 05000410/LER-2024-001, Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum2024-05-0101 May 2024 Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum NMP1L3581, Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report2024-04-30030 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP2L2877, 2023 Annual Environmental Operating Report2024-04-19019 April 2024 2023 Annual Environmental Operating Report NMP2L2878, Core Operating Limits Report2024-04-16016 April 2024 Core Operating Limits Report ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24092A3352024-04-0101 April 2024 NRC Office of Investigations Case No. 1-2023-002 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24074A2812024-03-14014 March 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3577, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-03-13013 March 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable IR 05000220/20230062024-02-28028 February 2024 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2, (Reports 05000220/2023006 and 05000410/2023006) NMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 05000410/LER-2023-001, Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater2024-01-30030 January 2024 Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000220/LER-2023-002, Average Power Range Monitors Declared Inoperable Due to Trip of Reactor Recirculation Pump 122023-12-15015 December 2023 Average Power Range Monitors Declared Inoperable Due to Trip of Reactor Recirculation Pump 12 IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 2024-09-04
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARNMP2L2890, Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6)2024-10-0404 October 2024 Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6) ML23353A1572023-10-31031 October 2023 UFSAR Revision 28 (Redacted Version) ML22292A1132022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML22292A1272022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 14, Figures ML22292A1262022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 15, Table of Contents ML22292A1252022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 15, Appendices ML22292A1292022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 14, Table of Contents ML22292A1242022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Appendix C, Licensee Renewal Supplement - Aging Management Programs and Time-Limited Aging Analyses ML22292A1232022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Appendix a, Figure A.0-1, the Content of Figure A.0-1 Is Historical and Has Been Deleted ML22292A1212022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Appendix B ML22292A1202022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses ML22292A1222022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 17, Quality Assuarance ML22292A1182022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 15, Figures ML22292A1172022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Figures ML22292A1162022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Table 2B-38, Joint Distribution of Wind Direction and Speed Location 100 Ft ML22292A1152022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 6, Table of Contents ML22292A1302022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 17, Figures ML22292A1142022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9A, Degree of Compliance with Branch Technical Position Cmeb 9.5-1, Rev. 2 Dated July 1981 ML22292A1122022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 7, Sections 7.1 Thru 7.3 ML22292A1112022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 6, Sections 6.1 Through 6.2 ML22292A1102022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 1, Figures 1.2-33 Through End ML22292A1092022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Figures 2K.28A Through End ML22292A1082022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 3, Figures 3.2-1 Thru 3C.3-3 ML22292A1062022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Appendices 9B Thru 9C ML22292A1052022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Figures 2.5-110 Through 2H-42 ML22292A1042022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 7, Sections 7.4 Thru 7.7 ML22292A1032022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Tables 2B-8 Through 2B-38 ML22292A1022022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 6, Appendix 6D, Figures 6.2.1 Through 6C-1 ML22292A1012022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Figures 2H.43 Through 2K-27F ML22292A0972022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 3, Sections 3.6A Through 3.8 ML22292A0932022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 10, Figures ML22292A0912022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 5, Table of Contents ML22292A0922022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 11, Figures ML22292A0942022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 7, Table of Contents ML22292A0952022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 8, Section 8.3 Thru Appendix 8A ML22292A0842022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22292A0892022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 5, Figures ML22292A0902022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 4, Table of Contents ML22292A0882022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Table of Contents ML22292A0872022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 3, Table of Contents ML22292A0862022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2A, Hazardous Materials Data Collection ML22292A0852022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B Table 2B-40 Thru 2B-55 ML22292A0962022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Table of Contents ML22292A1282022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Appendix a, Reload Analysis ML22292A0982022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Table 2B-35, Joint Distribution of Wing Direction and Speed ML22292A0992022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures 9.4-2e Thru End ML22292A1002022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Appendices 2C Through 2I NMP2L2821, 5 to Updated Final Safety Analysis Report, Chapter 18, Human Factor Engineering/Safety Parameter Display System2022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 18, Human Factor Engineering/Safety Parameter Display System ML22292A1382022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 18, Figures ML22292A1372022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 12, Figures 2024-10-04
[Table view] |