NRC Generic Letter 1984-02

From kanterella
Revision as of 02:46, 24 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NRC Generic Letter 1984-002: Notice of Meeting Regarding Facility Staffing
ML031150521
Person / Time
Site: Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Three Mile Island, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000000, Zimmer, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, Skagit, Marble Hill
Issue date: 01/06/1984
From: Eisenhut D
Office of Nuclear Reactor Regulation
To:
References
GL-84-002, NUDOCS 8401090221
Download: ML031150521 (2)


J anuary 6, ~984 TO ALL APPLICANTS FOR OPERATING LICENSES AND FULL-POWER AUTHORIZATIONS

Gentlemen:

Subject: Notice of Meeting Regarding Facility Staffing (Generic Letter 84-02)

We have completed a preliminary analysis of the data submitted in response to a survey that was initiated in early December 1983. One of the concerns that emerges from a review of the data is the potential for a limited amount of commercial nuclear power plant operating experience among members of the operating staff at the time of licensing. This concern has prompted us to arrange a meeting with you where we can discuss the issue in general and give you our views on what needs to be done to deal with the various problem areas.

The meeting is scheduled for 10:00 AM on January 25, 1984 in the Phillips Building, Room P-118, 7920 Norfolk Ave., Bethesda, Md. 20014. We request that at least one, but not more than two individuals, from each utility attend the meeting. A senior officer responsible for staffing and, if desired, the manager of training would be appropriate representatives.

The purpose of the meeting is to inform you of our concern and to share with you our present thinking on acceptable experience profiles for licensing new plants. We would welcome a general discussion of the issues; no plant-specific presentations are requested. Follow-on meetings with individual applicants may be necessary to discuss plant-specific issues and their resolution.

Please advise the NRR Project Manager by January 20, 1984 if you will not be able to attend.

Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation JHan :cs HLThompson f ut

1/ /84 1/4 /84 1] /84 8401090221

0o

/1-

Ic UNITED STATES

NUCLEAR REGULATORY COMMISSION

X iWASHINGTON, D. C. 20555 January 6, 1984 TO ALL APPLICANTS FOR OPERATING LICENSES AND FULL-POWER AUTHORIZATIONS

Gentlemen:

Subject: Notice of Meeting Regarding Facility Staffing (Generic Letter 84-02)

We have completed a preliminary analysis of the data submitted in response to a survey that was initiated in early December 1983. One of the concerns that emerges from a review of the data is the potential for a limited ofamount of commercial nuclear power plant operating experience among members us the operating staff at the time of licensing. This concern has prompted and to give arrange a meeting with you where we can discuss the issue in general areas.

you our views on what needs to be done to deal with the various problem The meeting is scheduled for 10:00 AM on January 25, 1984 in the Phillips Building, Room P-118, 7920 Norfolk Ave., Bethesda, Md. 20014. We request that at least one, but not more than two individuals, from each utility attend the meeting. A senior officer responsible for staffing and, if desired, the manager of training would be appropriate representatives.

The purpose of the meeting is to inform you of our concern and to share with you our present thinking on acceptable experience profiles for licensing new plants. We would welcome a general discussion of the issues; no plant-specific presentations are requested. Follow-on meetings with individual applicants may be necessary to discuss plant-specific issues and their resolution.

Please advise the NRR Project Manager by January 20, 1984 if you will not be able to attend.

Darrell G. Eisenhut, Director Division of Licensing.

Office of Nuclear Reactor Regulation JAW,.  ;,S/.- )Ac

)~

D ' \ S /

Template:GL-Nav