|
---|
Category:Letter
MONTHYEARIR 05000354/20230042024-02-0101 February 2024 Integrated Inspection Report 05000354/2023004 ML24030A8752024-02-0101 February 2024 Operator Licensing Examination Approval ML24009A1022024-01-26026 January 2024 Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000354/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000354/2023401 ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23335A1122023-12-15015 December 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers ML23307A1532023-12-15015 December 2023 NRC Investigation Report No. 1-2023-001 ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000354/20230032023-11-0707 November 2023 Integrated Inspection Report 05000354/2023003 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0065, Submittal of 2023 Annual 10 CFR 50.46 Report2023-10-0202 October 2023 Submittal of 2023 Annual 10 CFR 50.46 Report LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000354/20230052023-08-31031 August 2023 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2023005) ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 IR 05000354/20230102023-08-0303 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000354/2023010 LR-N23-0052, Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.12023-07-31031 July 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.1 LR-N23-0042, Spent Fuel Cask Registration2023-07-12012 July 2023 Spent Fuel Cask Registration LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 IR 05000354/20230112023-05-0101 May 2023 Commercial Grade Dedication Report 05000354/2023011 ML23121A1412023-05-0101 May 2023 Senior Reactor and Reactor Operator Initial License Examinations LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) IR 05000354/20230012023-04-26026 April 2023 Integrated Inspection Report 05000354/2023001 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location LR-N23-0009, License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains2023-04-18018 April 2023 License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains ML23087A1492023-04-17017 April 2023 NRC to PSEG Salem, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23089A0942023-04-17017 April 2023 NRC to PSEG Hope Creek, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23103A3232023-04-13013 April 2023 Submittal of Updated Final Safety Analysis Report, Rev. 26, Summary of Revised Regulatory Commitments for Hope Creek, Summary of Changes to PSEG Nuclear LLC, Quality Assurance Topical Report, NO-AA-10, Rev. 89 ML23095A3682023-04-12012 April 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership LR-N23-0024, Submittal of Hope Creek Generating Station Technical Specification Bases Changes2023-03-29029 March 2023 Submittal of Hope Creek Generating Station Technical Specification Bases Changes LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23086A0912023-03-24024 March 2023 NMFS to NRC, Transmittal of Biological Opinion for Continued Operations of Salem and Hope Creek Nuclear Generating Stations LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report IR 05000354/20220062023-03-0101 March 2023 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2022006) LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0018, Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges2023-02-27027 February 2023 Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 IR 05000354/20220042023-01-24024 January 2023 Integrated Inspection Report 05000354/2022004 LR-N23-0011, In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage2023-01-19019 January 2023 In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage LR-N22-0096, and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination2023-01-0505 January 2023 and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination LR-N22-0094, Emergency Plan Document Revisions Implemented November 21, 20222022-12-14014 December 2022 Emergency Plan Document Revisions Implemented November 21, 2022 LR-N22-0091, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2022-12-0202 December 2022 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments ML22335A0412022-12-0101 December 2022 Notification of Commercial Grade Dedication Inspection (05000354/2023011) and Request for Information IR 05000354/20220032022-11-0303 November 2022 Integrated Inspection Report 05000354/2022003 2024-02-01
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report ML22194A8172022-08-10010 August 2022 Issuance of Amendment No. 232 Revise Surveillance Requirements for Electric Power Monitor Channels for Reactor Protection System and Power Range Neutron Monitoring System ML21348A7132022-03-14014 March 2022 Issuance of Amendment No. 231 Revision of Technical Specification Limits for Ultimate Heat Sink ML22056A0102022-03-0404 March 2022 and Salem Nuclear Generating Station, Unit Nos. 1 and 2; Correction Letter of Amendment Nos. 230, 342, and 323 Deletion of Specified Definitions and Figures ML22012A4352022-02-14014 February 2022 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Nos. 230, 342, and 323 Delete Definition in 10 CFR 20 and Figures of Site and Surrounding Areas ML22031A2762022-02-0101 February 2022 Issuance of Indemnity Agreement Amendments-Enclosure 2 ML22021B6592022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000) (Letter) ML21341B4262021-12-0808 December 2021 Correction Letter of Amendment No. 229 Revise Low Pressure Safety Limit to Address General Electric Nuclear Energy Part 21 Safety Communication SC05-03 ML21181A0562021-08-17017 August 2021 Issuance of Amendment No. 229 Revise Low Pressure Safety Limit to Address General Electric Nuclear Energy Part-21 Safety Communication SC05-03 (EPID L 2020 Lla 0210) (Non-Proprietary) ML21098A0872021-04-26026 April 2021 Issuance of Amendment No. 228 Adopt Technical Specifications Task Force TSTF-427, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability ML21050A0022021-03-12012 March 2021 Issuance of Amendment No. 227 Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-582, RPV WIC Enhancements ML21047A3132021-03-10010 March 2021 Issuance of Amendment No. 226 Revise Emergency Core Cooling System Technical Specification for High Pressure Coolant Injection System Inoperability (Non-Proprietary) ML20281A6132020-11-0909 November 2020 Issuance of Amendment No. 225 Revise Technical Specification Actions for Suppression Pool Cooling ML20231A6322020-09-29029 September 2020 Issuance of Amendment No. 224 Regarding Adoption of 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components of Nuclear Power Reactors ML20034E6172020-02-27027 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 222, 333, and 314 Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer ML19352F2312020-02-18018 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2; Issuance of Amendment Nos. 221, 332, and 313 Revise Emergency Plan Staffing Requirements ML19289A8862019-11-0707 November 2019 Issuance of Amendment No. 220 Regarding Revise Technical Specifications to Adopt TSTF-546, Revise APRM (Average Power Range Monitor) Channel Adjustment Surveillance Requirement ML19218A3052019-09-19019 September 2019 Issuance of Amendment No. 219 Regarding Revise Technical Specifications to Adopt TSFF-564, Safety Limit MCPR ML19205A3062019-09-0606 September 2019 Issuance of Amendment No. 218 Regarding Revised Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements ML19186A2052019-08-0606 August 2019 Issuance of Amendment No. 217 Remote Shutdown System ML19073A0732019-04-30030 April 2019 Issuance of Amendment No. 216 Revise Technical Specification 3/4.8.1, A.C. Sources - Operating, Action for Inoperable Diesel Generator ML19065A1562019-03-27027 March 2019 Issuance of Amendment No. 215 Inverter Allowed Outage Time Extension ML19044A6272019-03-0606 March 2019 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 214, 327, and 308 Revise Technical Specifications to Adopt TSTF-529 ML18260A2032018-10-30030 October 2018 Issuance of Amendment No. 213 Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control ML18096A5422018-04-24024 April 2018 Hope Creek Generating Station - Issuance of Amendment Measurement Uncertainty Recapture Power Uprate (CAC MF9930; EPID L-2017-LLS-0002) ML18081A0442018-04-11011 April 2018 Issuance of Amendment No. 211 Safety Limit Minimum Critical Power Ratio Change ML17355A5702018-02-16016 February 2018 Issuance of Amendment Nos. 322, 303, & 210, to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 (CAC Nos. MF9268/MF9269/MF9270; EPID L-2017-LLA-0173) ML17324A8402017-12-14014 December 2017 Issuance of Amendment to Revise and Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report (CAC No. MF9502; EPID L-2017-LLA-0204) ML17317A6052017-12-13013 December 2017 Issuance of Amendment, License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-535 ML17291A2092017-11-0808 November 2017 Issuance of Amendment Technical Specification Change for Permanent Extension to Type a and Type C Containment Leak Rate Test Frequencies (CAC No. MF8462; EPID L-2016-JLD-0011) ML17216A0222017-08-0404 August 2017 Nonproprietary Issuance of Amendment Regarding Digital Power Range Neutron Monitoring System Upgrade ML17164A3552017-06-28028 June 2017 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML17093A8702017-05-16016 May 2017 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Revised PSEG Nulcear LLC Cyber Security Plan Milestone 8 Implementation Schedule ML17047A0202017-03-21021 March 2017 Issuance of Amendment to Delete Technical Specification Action Statement 3.4.2.1.b Associated with Stuck Open Safety/Relief Valves ML17053A1782017-03-15015 March 2017 Issuance of Amendment to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling ML17012A2922017-02-0606 February 2017 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Issuance of Amendments ML16270A0382016-10-13013 October 2016 Issuance of Amendment No. 200 Safety Limit Minimum Critical Power Ratio Change ML15286A0912015-11-30030 November 2015 Issuance of Amendment Adoption of Technical Specifications Task Force Traveler-522 ML15141A2712015-06-17017 June 2015 and Salem Nuclear Generating Station, Unit Nos.1 and 2, Issuance of Amendments Update of Appendix B to the Renewed Facility Operating Licenses ML14323A9742014-12-23023 December 2014 and Salem Nuclear Generating Station, Units 1 and 2, Issuance of Amendments Revision to Cyber Security Plan Implemenation Schedule and Conditions ML14108A3992014-12-18018 December 2014 Issuance of Amendment Request to Relocate Flood Protection Technical Specification to the Technical Requirements Manual ML14108A3122014-07-29029 July 2014 Issuance of Amendment Request to Relocate Safety Relief Valve Position Instrumentation to Technical Requirements Manual ML13114A0782013-06-26026 June 2013 Issuance of Amendment Request for Technical Specification Change to Average Power Range Monitoring System Operability Requirements in Operating Condition 5 ML12335A2212012-12-10010 December 2012 and Salem Nuclear Generating Station, Units 1 and 2 - Issuance of Amendments Approval of Change to Implementation Milestone 6 of Cyber Security Plan LR-N12-0107, License Amendment Request - APRM Operability Requirements in Opcon 52012-06-0606 June 2012 License Amendment Request - APRM Operability Requirements in Opcon 5 ML1201800782012-02-0808 February 2012 Issuance of Amendment 191 Control Room Emergency Filtration System and Control Room Air Conditioning System ML1123806182011-09-14014 September 2011 Issuance of Amendment Operation with Final Feedwater Temperature Reduction and Feedwater Heaters Out of Service ML1118615602011-07-28028 July 2011 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, License Amendment, Issuance of Amendments Approval of Cyber Security Plan 2024-01-16
[Table view] Category:Safety Evaluation
MONTHYEARML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location ML23095A3682023-04-12012 April 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report ML22194A8172022-08-10010 August 2022 Issuance of Amendment No. 232 Revise Surveillance Requirements for Electric Power Monitor Channels for Reactor Protection System and Power Range Neutron Monitoring System ML22194A8402022-07-15015 July 2022 Correction Letter of Relief Request No. HR-I4R-220 Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs ML22181A1252022-07-0505 July 2022 Issuance of Relief Request No. HR I4R-220 Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs ML21348A7132022-03-14014 March 2022 Issuance of Amendment No. 231 Revision of Technical Specification Limits for Ultimate Heat Sink ML22012A4352022-02-14014 February 2022 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Nos. 230, 342, and 323 Delete Definition in 10 CFR 20 and Figures of Site and Surrounding Areas ML21181A0562021-08-17017 August 2021 Issuance of Amendment No. 229 Revise Low Pressure Safety Limit to Address General Electric Nuclear Energy Part-21 Safety Communication SC05-03 (EPID L 2020 Lla 0210) (Non-Proprietary) ML21098A0872021-04-26026 April 2021 Issuance of Amendment No. 228 Adopt Technical Specifications Task Force TSTF-427, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability ML21050A0022021-03-12012 March 2021 Issuance of Amendment No. 227 Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-582, RPV WIC Enhancements ML21047A3132021-03-10010 March 2021 Issuance of Amendment No. 226 Revise Emergency Core Cooling System Technical Specification for High Pressure Coolant Injection System Inoperability (Non-Proprietary) ML20281A6132020-11-0909 November 2020 Issuance of Amendment No. 225 Revise Technical Specification Actions for Suppression Pool Cooling ML20231A6322020-09-29029 September 2020 Issuance of Amendment No. 224 Regarding Adoption of 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components of Nuclear Power Reactors ML20224A2982020-08-20020 August 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20091L9992020-04-13013 April 2020 Issuance of Relief Request HC-I4R-190 for the Fourth 10-Year Inservice Inspection Interval ML20034E6172020-02-27027 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 222, 333, and 314 Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer ML19352F2312020-02-18018 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2; Issuance of Amendment Nos. 221, 332, and 313 Revise Emergency Plan Staffing Requirements ML19289A8862019-11-0707 November 2019 Issuance of Amendment No. 220 Regarding Revise Technical Specifications to Adopt TSTF-546, Revise APRM (Average Power Range Monitor) Channel Adjustment Surveillance Requirement ML19218A3052019-09-19019 September 2019 Issuance of Amendment No. 219 Regarding Revise Technical Specifications to Adopt TSFF-564, Safety Limit MCPR ML19220A1022019-09-0606 September 2019 Alternative Request VR-03 to Use ASME Code Case OMN-17, Alternative Rules for Testing ASME Class 1 Pressure Relief/Safety Valve for the Fourth 10-Year Inservice Test Interval ML19205A3062019-09-0606 September 2019 Issuance of Amendment No. 218 Regarding Revised Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements ML19186A2052019-08-0606 August 2019 Issuance of Amendment No. 217 Remote Shutdown System ML19136A0262019-07-11011 July 2019 Issuance of Relief Request No. HC-I3R-08, Revision 0, Use of the ASME Code ML19073A0732019-04-30030 April 2019 Issuance of Amendment No. 216 Revise Technical Specification 3/4.8.1, A.C. Sources - Operating, Action for Inoperable Diesel Generator ML19065A1562019-03-27027 March 2019 Issuance of Amendment No. 215 Inverter Allowed Outage Time Extension ML19044A6272019-03-0606 March 2019 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 214, 327, and 308 Revise Technical Specifications to Adopt TSTF-529 ML18290A8762018-12-0606 December 2018 Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC No. MF4458; EPID No. L-2014-JLD-0040) ML18260A2032018-10-30030 October 2018 Issuance of Amendment No. 213 Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control ML18096A5422018-04-24024 April 2018 Hope Creek Generating Station - Issuance of Amendment Measurement Uncertainty Recapture Power Uprate (CAC MF9930; EPID L-2017-LLS-0002) ML18081A0442018-04-11011 April 2018 Issuance of Amendment No. 211 Safety Limit Minimum Critical Power Ratio Change ML17355A5702018-02-16016 February 2018 Issuance of Amendment Nos. 322, 303, & 210, to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 (CAC Nos. MF9268/MF9269/MF9270; EPID L-2017-LLA-0173) ML17324A8402017-12-14014 December 2017 Issuance of Amendment to Revise and Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report (CAC No. MF9502; EPID L-2017-LLA-0204) ML17317A6052017-12-13013 December 2017 Issuance of Amendment, License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-535 ML17321B1062017-11-28028 November 2017 Request to Use Later Edition of American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants (CAC No. MG0124; EPID L-2017-LLR-0087) ML17291A2092017-11-0808 November 2017 Issuance of Amendment Technical Specification Change for Permanent Extension to Type a and Type C Containment Leak Rate Test Frequencies (CAC No. MF8462; EPID L-2016-JLD-0011) ML17223A4832017-08-17017 August 2017 Relief from the Requirements of the ASME Code for Alternative to Nozzle-to-Vessel Weld and Inner Radius Examinations ML17216A0222017-08-0404 August 2017 Nonproprietary Issuance of Amendment Regarding Digital Power Range Neutron Monitoring System Upgrade ML17125A2662017-06-30030 June 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML17164A3552017-06-28028 June 2017 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML17093A8702017-05-16016 May 2017 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Revised PSEG Nulcear LLC Cyber Security Plan Milestone 8 Implementation Schedule ML17047A0202017-03-21021 March 2017 Issuance of Amendment to Delete Technical Specification Action Statement 3.4.2.1.b Associated with Stuck Open Safety/Relief Valves ML17053A1782017-03-15015 March 2017 Issuance of Amendment to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling ML17012A2922017-02-0606 February 2017 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Issuance of Amendments ML16343A0572016-12-20020 December 2016 Requests for Relief GR-01, PR-01, PR-02, VR-01, and VR-02, for the Fourth Inservice Testing Interval ML16270A0382016-10-13013 October 2016 Issuance of Amendment No. 200 Safety Limit Minimum Critical Power Ratio Change ML16256A6552016-09-30030 September 2016 Hope Creek Generating Station - Request for Relaxation of the Release Point Height Requirement of NRC Order EA-13-109,Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions ML16259A2042016-09-20020 September 2016 Hope Creek Generating Station - Safety Evaluation - Request to revise technical specifications - safety limit minimum critical power ratio.(TAC NO. MF7793) ML15286A0912015-11-30030 November 2015 Issuance of Amendment Adoption of Technical Specifications Task Force Traveler-522 2024-01-16
[Table view] |
Text
August 27, 2007 Mr. William Levis President & Chief Nuclear Officer PSEG Nuclear LLC - N09 Post Office Box 236 Hancocks Bridge, NJ 08038
SUBJECT:
HOPE CREEK GENERATING STATION - ISSUANCE OF AMENDMENT RE:
RELOCATE COMPONENT LISTS FOR PRIMARY CONTAINMENT ISOLATION VALVES FROM TECHNICAL SPECIFICATIONS (TAC NO. MD3600)
Dear Mr. Levis:
The Commission has issued the enclosed Amendment No. 171 to Facility Operating License No. NPF-57 for the Hope Creek Generating Station (HCGS). This amendment consists of changes to the Technical Specifications (TSs) in response to your application dated November 15, 2006, as supplemented by letters dated June 21, and August 23, 2007.
The amendment deletes TS Table 3.6.3-1, Primary Containment Isolation Valves, and relocates the information to the HCGS Technical Requirements Manual. The amendment also revises other TS sections that reference TS Table 3.6.3-1.
A copy of our safety evaluation is also enclosed. Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
/RA/
Richard B. Ennis, Senior Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-354
Enclosures:
- 1. Amendment No. 171 to License No. NPF-57
- 2. Safety Evaluation cc w/encls: See next page
Mr. William Levis President & Chief Nuclear Officer PSEG Nuclear LLC - N09 Post Office Box 236 Hancocks Bridge, NJ 08038
SUBJECT:
HOPE CREEK GENERATING STATION - ISSUANCE OF AMENDMENT RE:
RELOCATE COMPONENT LISTS FOR PRIMARY CONTAINMENT ISOLATION VALVES FROM TECHNICAL SPECIFICATIONS (TAC NO. MD3600)
Dear Mr. Levis:
The Commission has issued the enclosed Amendment No. 171 to Facility Operating License No. NPF-57 for the Hope Creek Generating Station (HCGS). This amendment consists of changes to the Technical Specifications (TSs) in response to your application dated November 15, 2006, as supplemented by letters dated June 21, and August 23, 2007.
The amendment deletes TS Table 3.6.3-1, Primary Containment Isolation Valves, and relocates the information to the HCGS Technical Requirements Manual. The amendment also revises other TS sections that reference TS Table 3.6.3-1.
A copy of our safety evaluation is also enclosed. Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
/RA/
Richard B. Ennis, Senior Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-354
Enclosures:
- 1. Amendment No. 171 to License No. NPF-57
- 2. Safety Evaluation cc w/encls: See next page DISTRIBUTION:
PUBLIC RidsOgcRp RidsNrrPMREnnis LPL1-2 R/F RidsAcrsAcnwMailCenter GHill (2), OIS RidsNrrDorlLpl1-2 RidsNrrDirsltsb RidsNrrDorlDPR RidsNrrLASLittle RidsRgn1MailCenter JHoch Package Accession No.: ML072390350 Amendment Accession No: ML071430403 TS Accession No.: ML072400304 OFFICE LPL1-2/PM LPL1-1/LA ITSB/BC OGC LPL1-2/BC NAME REnnis SLittle TKobetz LSubin HChernoff (LRaghavan for)
DATE 8/27/07 6/5/07 6/7/07 6/29/07 8/27/07 OFFICIAL RECORD COPY
Hope Creek Generating Station cc:
Mr. Thomas Joyce Mr. Michael Gaffney Senior Vice President - Operations Manager - Hope Creek Regulatory Assurance PSEG Nuclear PSEG Nuclear P.O. Box 236 P.O. Box 236 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Mr. Dennis Winchester Township Clerk Vice President - Nuclear Assessment Lower Alloways Creek Township PSEG Nuclear Municipal Building, P.O. Box 157 P.O. Box 236 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Mr. Paul Bauldauf, P.E., Asst. Director Mr. George Barnes Radiation Protection Programs Site Vice President - Hope Creek NJ Department of Environmental PSEG Nuclear Protection and Energy P.O. Box 236 CN 415 Hancocks Bridge, NJ 08038 Trenton, NJ 08625-0415 Mr. Carl Fricker Mr. Brian Beam Vice President - Operations Support Board of Public Utilities PSEG Nuclear 2 Gateway Center, Tenth Floor P.O. Box 236 Newark, NJ 07102 Hancocks Bridge, NJ 08038 Regional Administrator, Region I Mr. John Perry U.S. Nuclear Regulatory Commission Plant Manager - Hope Creek 475 Allendale Road PSEG Nuclear King of Prussia, PA 19406 P.O. Box 236 Hancocks Bridge, NJ 08038 Senior Resident Inspector Hope Creek Generating Station Mr. James Mallon U.S. Nuclear Regulatory Commission Manager - Licensing Drawer 0509 PSEG Nuclear Hancocks Bridge, NJ 08038 P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. Jeffrie J. Keenan, Esquire PSEG Nuclear - N21 P.O. Box 236 Hancocks Bridge, NJ 08038
PSEG NUCLEAR LLC DOCKET NO. 50-354 HOPE CREEK GENERATING STATION AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 171 License No. NPF-57
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment filed by PSEG Nuclear LLC dated November 15, 2006, as supplemented by letters dated June 21, and August 23, 2007, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-57 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 171, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into the license. PSEG Nuclear LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. The license amendment is effective as of its date of issuance and shall be implemented within 90 days. Implementation shall include the relocation of information from the Technical Specifications to the Technical Requirements Manual as described in the licensees application dated November 15, 2006, and letters dated June 21, and August 23, 2007.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Facility Operating License and the Technical Specifications Date of Issuance: August 27, 2007
ATTACHMENT TO LICENSE AMENDMENT NO. 171 FACILITY OPERATING LICENSE NO. NPF-57 DOCKET NO. 50-354 Replace the following page of Facility Operating License No. NPF-57 with the attached revised page as indicated. The revised page is identified by amendment number and contains marginal lines indicating the areas of change.
Remove Insert Page 3 Page 3 Replace the following pages of the Appendix A, Technical Specifications, with the attached revised pages as indicated. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Insert xii xii 1-5 1-5 3/4 3-11 3/4 3-11 3/4 3-12 3/4 3-12 3/4 3-13 3/4 3-13 3/4 3-14 3/4 3-14 3/4 3-15 3/4 3-15 3/4 3-16a 3/4 3-16a 3/4 3-17 3/4 3-17 3/4 3-18 ---
3/4 3-19 ---
3/4 3-20 ---
3/4 3-21 ---
3/4 6-1 3/4 6-1 3/4 6-2 3/4 6-2 3/4 6-3 3/4 6-3 3/4 6-4 3/4 6-4 3/4 6-17 3/4 6-17 3/4 6-18 3/4 6-18 3/4 6-19 3/4 6-19 3/4 6-20 ---
3/4 6-21 ---
3/4 6-22 ---
3/4 6-23 ---
3/4 6-24 ---
3/4 6-25 ---
3/4 6-26 ---
3/4 6-27 ---
3/4 6-28 ---
3/4 6-29 ---
Remove Insert 3/4 6-30 ---
3/4 6-31 ---
3/4 6-32 ---
3/4 6-33 ---
3/4 6-34 ---
3/4 6-35 ---
3/4 6-36 ---
3/4 6-37 ---
3/4 6-38 ---
3/4 6-39 ---
3/4 6-40 ---
3/4 6-41 ---
3/4 6-42 ---
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 171 TO FACILITY OPERATING LICENSE NO. NPF-57 PSEG NUCLEAR LLC HOPE CREEK GENERATING STATION DOCKET NO. 50-354
1.0 INTRODUCTION
By letter dated November 15, 2006 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML063260285), as supplemented by letters dated June 21, 2007 (ADAMS Accession No. ML071840164), and August 23, 2007, PSEG Nuclear LLC (PSEG or the licensee) requested changes to the Hope Creek Generating Station (HCGS) Technical Specification (TSs). The proposed amendment would delete TS Table 3.6.3-1, Primary Containment Isolation Valves, and relocate the information to the HCGS Technical Requirements Manual (TRM). The amendment would also revise other TS sections that reference TS Table 3.6.3-1. The licensees application dated November 15, 2006, stated that the proposed changes are consistent with the guidance in Nuclear Regulatory Commission (NRC or the Commission) Generic Letter (GL) 91-08, Removal of Component Lists from Technical Specifications dated May 6, 1991 (ADAMS Accession No. ML031140516).
The supplements dated June 21, and August 23, 2007, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the NRC staffs original proposed no significant hazards consideration determination as published in the Federal Register on February 13, 2007 (72 FR 6789).
2.0 REGULATORY EVALUATION
In GL 91-08, the NRC staff provided guidance to licensees regarding preparing a proposed license amendment to remove component lists from the TSs. The GL stated that licensees planning to adopt this line-item TS improvement are encouraged to propose TS changes consistent with the guidance in the enclosures to the GL. Enclosure 1 to the GL provides guidance on the TS changes for specific lists of components including containment isolation valves. Enclosure 1 also identifies the following issues that should be addressed as part of a license amendment request to remove component lists from the TSs:
- 1. Each TS should include an appropriate description of the scope of the components to which the TS requirements apply. Components that are defined by regulatory requirements or guidance need not be clarified further. However, the Bases Section of the TS should reference the applicable requirements or guidance.
- 2. If the removal of a component list results in the loss of notes that modify or provide an exception to the TS requirements, the specification should be revised to incorporate that modification or exception. The modification or exception should be stated in terms that identify any group of components by function rather than by plant identification number, if practical.
- 3. Licensees should confirm that the lists of components removed from the TS are located in appropriately controlled plant procedures. The list of components may be included in the next update of the FSAR [Final Safety Analysis Report]. The Bases Section of individual specifications also may reference the plant procedures or other documents that identify each component list. The Bases Section for the containment isolation valve TS should be updated to describe the intent of opening valves under administrative control.
3.0 TECHNICAL EVALUATION
In its application dated November 15, 2006, the licensee proposed to delete TS Table 3.6.3-1, Primary Containment Isolation Valves, and relocate the information to the HCGS TRM. The TRM will be a new licensee-controlled document. As discussed in the licensees letter dated August 23, 2007, the TRM will be controlled in a manner consistent with procedures fully or partially described in the HCGS Updated FSAR (UFSAR). A description of the TRM and the requirement to control the TRM under the provisions of Section 50.59 of Title 10 of Code of Federal Regulations (10 CFR) will be included in the UFSAR when the proposed amendment is implemented. The controls for the TRM will be in accordance with Nuclear Energy Institute (NEI) 98-03, Revision 1, Guidelines for Updating Final Safety Analysis Reports (ADAMS Accession No. ML003779028). The licensee also proposed the following additional TS changes to support the relocation of TS Table 3.6.3-1:
- 1. Revise the TS Index to show Table 3.6.3-1 as being deleted.
- 2. Revise TS Definition 1.32, Primary Containment Integrity, to state the exception to closure of primary containment penetrations in more general terms rather than making a specific reference to TS Table 3.6.3-1.
- 3. Revise TS Table 3.3.2-1, Isolation Actuation Instrumentation, to reflect the removal of Table 3.6.3-1 by deleting Note (d). In addition, the Table Notations for TS Table 3.3.2-1 identifying valves closed by a particular trip signal will be relocated to the TRM.
- 4. Revise Surveillance Requirement (SR) 4.6.1.1.b to state the exception to closure of primary containment penetrations in more general terms rather than making a specific preference to TS Table 3.6.3-1.
- 5. Revise Limiting Condition for Operation (LCO) 3.6.1.2.b, Primary Containment Leakage, to delete the references to Table 3.6.3-1. LCO 3.6.2.1.b will be reworded in its entirety for clarity regarding the exceptions to the combined leakage rate.
- 6. Revise LCOs 3.6.1.2.d and 3.6.1.2.e to delete the reference to TS Table 3.6.3-1.
- 7. Revise LCO Actions 3.6.1.2.b, 3.6.1.2.d, and 3.6.1.2.e to delete the references to Table 3.6.3-1. Action 3.6.1.2.b will be reworded in its entirety for clarity regarding the exceptions to the combined leakage rate.
- 8. Revise LCO Restoration Actions 3.6.1.2.b, 3.6.1.2.d, and 3.6.1.2.e to delete the references to Table 3.6.3-1. Restoration Action 3.6.1.2.b will be reworded in its entirety for clarity regarding the exceptions to the combined leakage rate.
- 9. Revise SRs 4.6.1.2.g and 4.6.1.2.h to delete the references to TS Table 3.6.3-1.
- 10. Revise LCO 3.6.3, "Primary Containment Isolation Valves," to read as follows to delete the references to Table 3.6.3-1:
Each primary containment isolation valve and each reactor instrumentation line excess flow check valve shall be OPERABLE.
- 11. Revise LCO Actions 3.6.3.a and 3.6.3.b, and SRs 4.6.3.1, 4.6.3.2, 4.6.3.3, and 4.6.3.4 to delete the references to Table 3.6.3-1.
- 12. Add a note to SR 4.6.3.4 stating "The reactor vessel head seal leak detection line (penetration J5C) excess flow check valve is not required to be tested pursuant to this requirement."
The licensees application dated November 15, 2006, also submitted proposed TS Bases changes for information only. The TS Bases would be revised under the HCGS Bases Control Program, described in TS 6.15, as part of the implementation of the proposed amendment.
As discussed above in Safety Evaluation Section 2.0, Enclosure 1 to GL 91-08 identifies three specific issues that should be addressed as part of a license amendment request to remove component lists from the TSs. PSEG addressed the three issues in Section 4.0 of to its application dated November 15, 2006, and in its letter dated August 23, 2007. The NRC staff reviewed the proposed TS changes and the licensees justifications for the changes and determined that the changes are consistent with the intent of the guidance in GL 91-08 since: (1) with respect to issue 1, the proposed TS changes do not affect the scope of the components to which the TS requirements apply; (2) with respect to issue 2, the proposed TS changes associated with the notes to Tables 3.6.3-1 and 3.3.2-1 appropriately preserve existing approved modifications or exceptions to the TS requirements; and (3) with respect to issue 3, the list of containment isolation valves to be removed from the TSs will be relocated to the TRM, which is an appropriately controlled licensee document.
Based on review of the information provided by the licensee, the NRC staff finds that: (1) the proposed TS changes do not alter the existing TS requirements or those components the requirements apply to; and (2) future changes to the relocated material will be adequately controlled under the provisions of 10 CFR 50.59. Based on these considerations, the NRC staff concludes that the proposed amendment is acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the New Jersey State Official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 and changes SRs.
The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (72 FR 6789). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributors: J. Hoch R. Ennis Date: August 27, 2007