MONTHYEARIR 05000259/20240102024-11-12012 November 2024 Design Basis Assurance Inspection Program Inspection Report 05000259/2024010 and 05000260/2024010 and 05000296/2024010 IR 05000259/20240032024-11-0404 November 2024 Integrated Inspection Report 05000259/2024003 and 05000260/2024003 and 05000296/2024003 CNL-24-043, Application for Subsequent Renewed Operating Licenses, Second Safety Supplement2024-11-0101 November 2024 Application for Subsequent Renewed Operating Licenses, Second Safety Supplement ML24305A1692024-10-31031 October 2024 Site Emergency Plan Implementing Procedure Revision 05000259/LER-2024-003, Valid Specified System Actuation Caused the Automatic Start of Emergency Diesel Generators2024-10-29029 October 2024 Valid Specified System Actuation Caused the Automatic Start of Emergency Diesel Generators 05000259/LER-2024-001-02, Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure2024-10-28028 October 2024 Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure ML24299A2632024-10-25025 October 2024 Response to Apparent Violation in NRC Inspection Report 05000260/2024090, EA-24-075 ML24289A1232024-10-24024 October 2024 Letter to James Barstow Re Environmental Scoping Summary Report for Browns Ferry CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24308A0042024-10-16016 October 2024 Ahc 24-1578 Environmental Review of the Browns Ferry Nuclear Plant, Units 1, 2 and 3 Subsequent License Renewal Application Limestone County CNL-24-077, Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 12024-10-0909 October 2024 Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 1 ML24270A2162024-09-27027 September 2024 Notice of Intentions Regarding Preliminary Finding from NRC Inspection Report 05000260/2024090, EA-24-075 ML24262A1502024-09-24024 September 2024 Requalification Program Inspection - Browns Ferry Nuclear Plant CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24263A2952024-09-19019 September 2024 Site Emergency Plan Implementing Procedure Revision CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000260/20240902024-09-17017 September 2024 NRC Inspection Report 05000260/2024090 and Preliminary White Finding and Apparent Violation - 1 CNL-24-062, Cycle 16 Reload Analysis Report2024-09-16016 September 2024 Cycle 16 Reload Analysis Report ML24255A8862024-09-10010 September 2024 Core Operating Limits Report for Cycle 16 Operation, Revision 0 IR 05000259/20244042024-09-0303 September 2024 Cyber Security Inspection Report 05000259/2024404 and 05000260-2024404 and 05000296/2024404-Cover Letter ML24239A3332024-09-0303 September 2024 Full Audit Plan IR 05000259/20240052024-08-26026 August 2024 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2024005, 05000260/2024005 and 05000296/2024005 ML24225A1682024-08-16016 August 2024 – Notification of Inspection and Request ML24219A0272024-08-0606 August 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000259/20244022024-08-0606 August 2024 Security Baseline Inspection Report 05000259/2024402 and 05000260/2024402 and 05000296/2024402 IR 05000259/20240022024-08-0202 August 2024 Brown Ferry Nuclear Plant – Integrated Inspection Report05000259/2024002 and 05000260/2024002 and 05000296/2024002 ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24183A4142024-07-10010 July 2024 – License Renewal Regulatory Limited Scope Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-SLE-0000) (Docket Numbers: 50-259, 50-260, and 50-296) 05000296/LER-2024-003, Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints2024-07-0808 July 2024 Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints 05000259/LER-2024-001-01, Inoperability of Unit 3 Diesel Generator Due to Relay Failure2024-07-0303 July 2024 Inoperability of Unit 3 Diesel Generator Due to Relay Failure ML24184A1142024-07-0202 July 2024 Site Emergency Plan Implementing Procedure Revision ML24183A3842024-07-0101 July 2024 Registration of Use of Cask to Store Spent Fuel (MPC-364, -365) ML24179A0282024-06-26026 June 2024 Evaluation of Effects of Out-of-Limits Condition as Described in IWB-3720(a) 05000259/LER-2024-002, Reactor Scram Due to Generator Step-Up Transformer Failure2024-06-24024 June 2024 Reactor Scram Due to Generator Step-Up Transformer Failure ML24175A0042024-06-23023 June 2024 Interim Report of a Deviation or Failure to Comply Associated with a Valve in the Unit 3 High Pressure Coolant Injection System ML24176A1132024-06-23023 June 2024 American Society of Mechanical Engineers, Section XI, Fourth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owner’S Activity Report Cycle 21 Oper ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24155A0042024-06-18018 June 2024 Proposed Alternative to the Requirements of the ASME Code (Revised Alternative Request 0-ISI-47) ML24158A5312024-06-0606 June 2024 Registration of Use of Cask to Store Spent Fuel (MPC-361, -362, -363) ML24071A0292024-06-0505 June 2024 Subsequent License Renewal Application Enclosure 3 - Proprietary Determination Letter ML24068A2612024-06-0505 June 2024 SLRA Fluence Methodology Report - Proprietary Determination Letter ML24151A6322024-05-30030 May 2024 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report IR 05000259/20244032024-05-22022 May 2024 – Security Baseline Report 05000259/2024403 and 05000260/2024403 and 05000296/2024403 05000260/LER-2024-002, High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation2024-05-20020 May 2024 High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A0702024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000259/20240012024-05-14014 May 2024 Integrated Inspection Report 05000259/2024001, 05000260/2024001, and 05000296/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 2024-09-03
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24255A5822024-09-10010 September 2024 SLRA - Requests for Additional Information - Set 1 ML24255A5802024-09-10010 September 2024 SLRA - Requests for Additional Information - Set 1 - Email from Jessica Hammock to James Barstow ML24116A2012024-04-17017 April 2024 Nrctva ISFSI CBS (RFI) ML24045A0272024-02-14014 February 2024 NRR E-mail Capture - Request for Additional Information Related to the Exemption Request for the 10 CFR Part 73 Enhanced Weapons Rule ML23332A0042023-11-27027 November 2023 NRR E-mail Capture - Request for Additional Information Related to Proposed Revised Alternative 0-ISI-47 ML23243A9892023-08-29029 August 2023 Inspection Information Request ML23124A0082023-05-0303 May 2023 NRR E-mail Capture - Request for Additional Information Related to Proposed Alternative Requests for the 5th 10-Year Inservice Testing Interval for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML23041A0022023-02-0909 February 2023 NRR E-mail Capture - Request for Additional Information Related to TVA Alternative Request BFN-0-ISI-32 (CNL-22-025) ML22299A0292022-10-26026 October 2022 NRR E-mail Capture - Request for Additional Information for Relief Request BFN-2-ISI-003 Re Weld Examination Coverage ML22292A2722022-10-19019 October 2022 NRR E-mail Capture - Request for Additional Information Related to TVAs Request to Adopt TSTF-505 and TSTF-439 for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML22208A2172022-07-15015 July 2022 NRR E-mail Capture - Request for Additional Information Related to TVA Relief Request BFN-21-ISI-02 (CNL-21-081) ML22174A2722022-06-24024 June 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22168A0802022-06-17017 June 2022 NRR E-mail Capture - Request for Confirmation of Information and Additional Information Related to TVAs Request to Use Control Bay Chiller Cross-Tie ML22160A4742022-06-0303 June 2022 NRR E-mail Capture - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Re LAR to Use Advanced Framatome Methodologies in Support of Atrium 11 Fuel ML22168A0392022-05-13013 May 2022 NRR E-mail Capture - Draft Request for Confirmation of Information and Additional Information Related to TVAs Request to Use Control Bay Chiller Cross-Tie ML22144A1002022-05-12012 May 2022 NRR E-mail Capture - Request for Additional Information Related to TVAs Request to Revised the TVA Plants Radiological Emergency Plans ML22047A1612022-02-16016 February 2022 NRR E-mail Capture - Request for Additional Information Regarding TVAs Request to Expand the SFP Criticality Safety Analysis for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML22025A4132022-01-25025 January 2022 RP Inspection Doc Request ML21343A4232021-12-0909 December 2021 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000259/2022010, 05000260/2022010, and 05000296/2022010) and Request for Information (RFI) ML21173A1042021-06-21021 June 2021 NRR E-mail Capture - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Regarding Request to TS 3.8.6 ML21041A5422021-02-10010 February 2021 NRR E-mail Capture - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Regarding Request to Adopt 10 CFR 50.69 ML21041A5432021-02-0505 February 2021 NRR E-mail Capture - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Draft Request for Additional Information Regarding 10 CFR 50.69 LAR ML21026A1652021-01-26026 January 2021 Document Request for Browns Ferry Nuclear Plant - Radiation Protection Inspection - Inspection Report 2021-02 ML20297A3012020-10-22022 October 2020 NRR E-mail Capture - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Regarding Request to Adopt TSTF-425 ML20296A3782020-10-22022 October 2020 NRR E-mail Capture - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Regarding Request to Incorporate TMRE ML20294A3762020-09-23023 September 2020 NRR E-mail Capture - Draft Request for Additional Information - Browns Ferry Nuclear Plant, Units 1, 2, and 3, Request to Adopt TSTF-425 ML20266G4472020-09-22022 September 2020 Notification of Inspection and Request for Information ML20224A4732020-08-11011 August 2020 Requalification Program Inspection Browns Ferry Nuclear ML20195B1302020-07-13013 July 2020 NRR E-mail Capture - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Regarding Alternative Request No. 0-ISI-47 ML20149K3212020-05-27027 May 2020 RP Inspection Document Request, Browns Ferry 2020-003 ML20254A3032020-05-13013 May 2020 Request for Supporting Information for the Browns Ferry, Units 1, 2, and 3 Seismic Probabilistic Risk Assessment Audit Review ML20054B8592020-02-20020 February 2020 Emergency Preparedness Program Inspection Request for Information ML20014E6552020-01-14014 January 2020 01 RP Inspection Document Request ML19196A0752019-07-12012 July 2019 NRR E-mail Capture - Final RAIs Browns Ferry Nuclear, Units 1, 2, 3 - Application to Revise Technical Specifications to Adopt TSTF-542 Revision 2, Reactor Pressure Vessel Water Inventory Control ML19116A0712019-06-0303 June 2019 Request for Additional Information Related Resubmittal of Proposed Alternative Request No. 1-ISI-27 for the Period of Extended Operation ML18331A5442018-12-0606 December 2018 Request for Additional Information Regarding Maximum Extended Load Line Limit Plus License Amendment Request (EPID L-2018-LLA-0048) - (Non-Proprietary) ML18317A1642018-11-20020 November 2018 Request for Additional Information Regarding Maximum Extended Load Line Limit Plus License Amendment Request (EPID L-2018-LLA-0048) - Non-Proprietary ML18263A1412018-09-11011 September 2018 NRR E-mail Capture - Browns Ferry Unit 1: RAI Associated with Relief Request 1-ISI-28 ML18138A1102018-05-17017 May 2018 Enclosurequest for Additional Information (Letter to E. D. Schrull Request for Additional Information Regarding Tennessee Valley Authority'S Decommissioning Funding Plan Update for Browns Ferry and Sequoyah Isfsis) ML18108A1872018-04-18018 April 2018 Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000259/2018411, 05000260/2018411, and 05000296/2018411 ML18057A6372018-02-23023 February 2018 NRR E-mail Capture - Request for Additional Information Related to TVA Fleet Topical Report TVA-NPG-AWA16 - EPIC: L-2016-TOP-0011) ML17216A0062017-08-18018 August 2017 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Related to LAR to Revise Modifications and Implementations Related to NFPA 805 for Fire Protection for Light Water Reactor Generating Plants (CAC Nos. MF9814-MF9816) ML17163A0502017-06-0808 June 2017 NRR E-mail Capture - RAI for Browns Ferry RR 3-ISI-28 CAC No. MF9257 ML17150A0792017-05-23023 May 2017 NRR E-mail Capture - Request for Additional Information Related to TVA Fleet LAR for EAL Change to Adopt NEI-99-01 Rev.6 (CAC Nos. MF9054 - MF9060) ML16288A0182016-10-27027 October 2016 Browns Ferry Nuclear Plant, Units 2 and 3 - RAI Related to Relief Request for the Use of Alternatives to Certain American Society of Mechanical Engineers, Boiler and Pressure Vessel Code, Section XI Requirements (CAC Nos. MF7795 and MF7796) ML16236A0732016-08-31031 August 2016 Request for Additional Information Related to License Amendment Request to Add New Technical Specification 3.3.8.3 ML16203A0272016-07-25025 July 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Related to License Amendment Request for Adding New Specifications to Technical Specification 3.3.8.3 (CAC Nos. MF6738, MF6739, and MF6740) ML16194A2292016-07-21021 July 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate ML16187A2932016-07-21021 July 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate (CAC Nos. MF6741, MF6742, and MF6743) ML16154A5442016-06-21021 June 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate 2024-09-10
[Table view] |
Text
September 22, 2008 Mr. William R. Campbell, Jr.
Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
BROWNS FERRY NUCLEAR POWER STATION UNIT 1- NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION
Dear Mr. Campbell:
From November 3-7, 2008, the NRC will perform the baseline in-service inspection (ISI) at the Browns Ferry Nuclear Plant - Unit 1 (NRC Inspection Procedure 71111.08). Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups. The first group (section A of the enclosure) identifies information to be provided prior to the inspection to ensure that the inspectors are adequately prepared.
The second group (section B of the enclosure) identifies the information the inspectors will need upon arrival at the site. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Jim Davenport of your organization. Our inspection dates are subject to change based on your updated schedule of outage activities. If there are any questions about this inspection or the material requested, please contact the inspector Rich Chou at (404) 562-4670 (rcc2@nrc.gov).
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
George T. Hopper, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-259 License No. DPR-33 (cc: w/encl - See Page 2)
_________________________ XG SUNSI REVIEW COMPLETE OFFICE RII/EB3 RIIPB6 RIIEB3 SIGNATURE /RA/ /RA/ /RA/
NAME R. Chou E. Guthrie G. Hopper DATE 09/22/2008 09/22/2008 09/22/2008 9/ /2008 9/ /2008 9/ /2008 9/ /2008 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
TVA 2 cc w/encl: Nuclear Power Group Ashok S. Bhatnagar Tennessee Valley Authority Senior Vice President 4X Blue Ridge Nuclear Generation Development and 1101 Market Street Construction Chattanooga, TN 37402-2801 Tennessee Valley Authority Electronic Mail Distribution H. Rick Rogers Vice President William R. Campbell, Jr. Nuclear Engineering and Technical Services Chief Nuclear Officer and Executive Vice Tennessee Valley Authority President Electronic Mail Distribution Tennessee Valley Authority 6A Lookout Place Michael D. Skaggs 1101 Market Street Site Vice President Chattanooga, TN 37402-2801 Browns Ferry Nuclear Plant Tennessee Valley Authority James R. Douet Electronic Mail Distribution Vice President Nuclear Support Beth A. Wetzel Tennessee Valley Authority Manager Electronic Mail Distribution Corporate Nuclear Licensing and Industry Affairs Steven M. Douglas Tennessee Valley Authority General Manager Electronic Mail Distribution Browns Ferry Site Operations Tennessee Valley Authority Senior Resident Inspector Electronic Mail Distribution Browns Ferry Nuclear Plant U.S. NRC D. T. Langley 10833 Shaw Road Manager Athens, AL 35611-6970 Licensing and Industry Affairs Tennessee Valley Authority Chairman P.O. Box 2000 Limestone County Commission Decatur, AL 35609 310 West Washington Street Athens, AL 35611 John C. Fornicola General Manager State Health Officer Nuclear Assurance Alabama Dept. of Public Health Tennessee Valley Authority RSA Tower - Administration Electronic Mail Distribution Suite 1552 P.O. Box 303017 General Counsel Montgomery, AL 36130-3017 Tennessee Valley Authority Electronic Mail Distribution Dr. D. E. Williamson State Health Officer Larry E. Nicholson Alabama Dept. of Public Health General Manager Electronic Mail Distribution Performance Improvement Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Michael A. Purcell Senior Technical Advisor
TVA 3 Letter to William R. Campbell, Jr. from George Hopper dated September 22, 2008
SUBJECT:
BROWNS FERRY NUCLEAR POWER STATION UNIT 1- NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION Distribution w/encl:
E. Brown, NRR RIDSNRRDIRS PUBLIC
INSERVICE INSPECTION DOCUMENT REQUEST Inspection Dates: November 3-7, 2008 Inspection Procedure: IP 71111.08 In-service Inspection (ISI) Activities Inspector: Rich Chou, Reactor Inspector A. Information Requested for the In-Office Preparation Week The following information should be sent to the Region II office in hard copy or electronic format (CD preferred), in care of Rich Chou by October 15, 2008, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The inspector will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection week (section B of this enclosure). We ask that the specific items selected from the lists be available and ready for review on the first day of inspection. *Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspector, and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the inspector as soon as possible.
A.1 ISI / Welding Programs and Schedule Information a) A detailed schedule (including preliminary dates) of:
i) Nondestructive examinations (NDEs) planned for Class 1 & 2 systems and containment, performed as part of your ASME Section XI, Risk Informed (if applicable), and augmented ISI Programs during the upcoming outage.
Provide a status summary of the NDE inspection activities vs. the required inspection period percentages for this Interval by category per ASME Section XI, IWX-2400 (Do not provide separately if other documentation requested contains this information) ii) Examinations planned for Alloy 82/182/600 welds/components that are not included in the Section XI scope. (If applicable) iii) Welding activities that are scheduled to be completed during the upcoming outage (ASME Class 1, 2, or 3 structures, systems, or components (SSCs))
b) A copy of ASME Section XI Code Relief Requests and associated NRC Safety Evaluations applicable to the examinations identified above Enclosure
2 c) A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrant, visual VT-1, VT-2, and VT-3) which have identified recordable indications (geometric or flaw) on Code Class 1 & 2 systems since the beginning of the last refueling outage. This should include the previousSection XI pressure test(s) conducted during start up and any evaluations associated with the results of the pressure tests. The list of NDE reports should include a brief description of the SSC where the recordable indication was identified.
d) A list with a brief description (e.g. system, material, pipe size, weld number, and NDE performed) of the welds in Code Class 1 and 2 systems which have been fabricated due to component repair/replacement activities since the beginning of the last refueling outage, or are planned to be fabricated this refueling outage.
e) If reactor vessel weld examinations required by the ASME Code are scheduled to occur during the upcoming outage, provide a detailed description of the welds to be examined, and the extent of the planned examination. Please also provide reference numbers for applicable procedures that will be used to conduct these examinations.
f) Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of Section XI of the ASME Code that have been identified since the beginning of the last refueling outage.
g) A list of any temporary non-code repairs in service (e.g. pinhole leaks).
h) Copies of the most recent self assessments for the ISI and Welding programs.
i) A list with a brief description of ISI related issues (e.g. condition reports) entered into your corrective action program since the beginning of the last refueling outage (Unit 3). For example, a list based upon data base searches using key words such as: ISI, ASME Code,Section XI, NDE, welding, cracks, wear, thinning, leakage, rust, corrosion, or errors in piping examinations.
j) Please provide names and phone numbers for the following program leads:
ISI contacts (Examination, planning)
Containment Exams Snubbers and Supports Repair and Replacement Program Manager Licensing Contact Site Welding Engineer B. Information to be provided on-site to the inspector at the entrance meeting (November 3, 2008):
B.1 ISI / Welding Programs and Schedule Information a) Updated schedules for ISI/NDE activities, planned welding activities, and schedule showing contingency repair plans, if available.
Enclosure
3 b) For ASME Class 1 and 2 welds selected by the inspector from the lists provided from section A of this enclosure, please provide copies of the following documentation for each subject weld:
i) Weld data sheet (traveler) ii) Weld configuration and system location iii) Applicable Code Edition and Addenda for weldment iv) Applicable Code Edition and Addenda for welding procedures v) Applicable weld procedures (WPS) used to fabricate the welds vi) Copies of procedure qualification records (PQRs) supporting the WPS from B.1.b.v vii) Copies of mechanical test reports identified in the PQRs above viii) Copies of the nonconformance reports for the selected welds (If Applicable) ix) Radiographs of the selected welds and access to equipment to allow viewing radiographs (If RT was performed) x) Copies of the pre-service examination records for the selected welds.
xi) Copies of welder performance qualifications records applicable to WPS, including documentation that welder maintained proficiency in the applicable welding processes specified in the WPS (At least six months prior to date subject work) xii) Copies of NDE personnel qualifications (VT, PT, UT, RT) As applicable c) For the ISI related corrective action issues selected by the inspector from section A of this enclosure, provide a copy of the corrective actions and supporting documentation.
d) For the NDE reports with recordable indications on Code Class 1 & 2 systems selected by the inspector from Section A above, provide a copy of the examination records, examiner qualification records, and associated corrective action documents.
e) A copy of (or ready access to) the most current revision of the ISI Program Manual and Plan for the current Interval.
f) For the NDEs selected by the inspector from Section A of this enclosure, provide copy of the NDE procedures used to perform the examinations (including calibration and flaw characterization/sizing procedures). For ultrasonic examination procedures qualified in accordance with ASME Code,Section XI, Appendix VIII, provide documentation supporting the procedure qualification (e.g.
the EPRI performance demonstration qualification summary sheets). Also, include documentation of the specific equipment to be used (e.g. ultrasonic unit, cables, and transducers including serial numbers) and NDE personnel qualification records.
g) Ready access to (i.e. copies provided to the inspector for use during the on-site inspection, or room number and location where available): Applicable editions of the ASME Code (Sections V, IX and XI) for the in-service inspection and repair/replacement programs.
Enclosure
4 Inspector Contact Information:
Rich Chou Reactor Inspector 404-562-4670 Rcc2@nrc.gov Mailing Address: