ML100620892

From kanterella
Revision as of 21:19, 13 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Inspection/Activity Plan, 03/01/2010 - 06/30/2010, Enclosure - Report 22
ML100620892
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/03/2010
From:
Division Reactor Projects II
To:
Southern Nuclear Operating Co
Shared Package
ML100620889 List:
References
IR-10-001
Download: ML100620892 (2)


Text

Page 1 of 2 Vogtle 03/03/2010 07:10:38 Inspection / Activity Plan Report 22 03/01/2010 - 06/30/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site OL EXAM - INITIAL EXAM WEEK 4 1 02/22/2010 03/05/2010 V23358 VOGTLE/FEBRUARY 2010 EXAM AT POWER FACILITIES PSB1-RP - RP OCCUPATIONAL BASELINE WEEK1 2 1, 2 03/08/2010 03/12/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/08/2010 03/12/2010 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 03/08/2010 03/12/2010 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/08/2010 03/12/2010 IP 71124.04 Occupational Dose Assessment 1, 2 03/08/2010 03/12/2010 IP 71151 Performance Indicator Verification EB3ISI - UNIT 2 INSERVICE INSPECTION 2 2 03/15/2010 03/19/2010 IP 7111108P Inservice Inspection Activities - PWR EB3TI172 - TI-172 RCS DM BUTT WELDS 2 2 03/15/2010 03/19/2010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds EB3SGISI - UNIT 2 SGISI 1 2 03/22/2010 03/26/2010 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - RP OCCUPATIONAL BASELINE WEEK 2 2 1, 2 03/22/2010 03/26/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/22/2010 03/26/2010 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 03/22/2010 03/26/2010 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/22/2010 03/26/2010 IP 71124.04 Occupational Dose Assessment 1, 2 03/22/2010 03/26/2010 IP 71151 Performance Indicator Verification PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 1, 2 05/17/2010 05/21/2010 IP 7111401 Exercise Evaluation 1, 2 05/17/2010 05/21/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 05/17/2010 05/21/2010 IP 71151 Performance Indicator Verification EB1-CDBI - COMPONENT DESIGN BASES INSPECTION 7 1, 2 05/31/2010 06/04/2010 IP 7111121 Component Design Bases Inspection 1, 2 06/14/2010 06/18/2010 IP 7111121 Component Design Bases Inspection 1, 2 06/28/2010 07/02/2010 IP 7111121 Component Design Bases Inspection 1, 2 07/12/2010 07/16/2010 IP 7111121 Component Design Bases Inspection FP - TFPI 6 1, 2 08/02/2010 08/06/2010 IP 7111105T Fire Protection [Triennial]

1, 2 08/16/2010 08/20/2010 IP 7111105T Fire Protection [Triennial]

PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2 02/07/2011 02/11/2011 IP 71152B Identification and Resolution of Problems 1, 2 02/21/2011 02/25/2011 IP 71152B Identification and Resolution of Problems This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Vogtle 03/03/2010 07:10:38 Inspection / Activity Plan Report 22 03/01/2010 - 06/30/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site OL EXAM - INIITIAL EXAM PREP 2 1 02/14/2011 02/18/2011 V23347 VOGTLE/MARCH 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1 3 1 03/14/2011 03/18/2011 V23347 VOGTLE/MARCH 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 3 1 03/21/2011 04/01/2011 V23347 VOGTLE/MARCH 2011 EXAM AT POWER FACILITIES EB3ISI - UNIT 1 INSERVICE INSPECTION 1 1 03/28/2011 04/01/2011 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - RP RADIOLOGICAL HAZARD ASSESSMENT 1 1, 2 04/04/2011 04/08/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 1, 2 04/04/2011 04/08/2011 IP 7111402 Alert and Notification System Evaluation 1, 2 04/04/2011 04/08/2011 IP 7111403 Emergency Response Organization Augmentation Testing 1, 2 04/04/2011 04/08/2011 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 04/04/2011 04/08/2011 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 04/04/2011 04/08/2011 IP 71151-EP01 Drill/Exercise Performance 1, 2 04/04/2011 04/08/2011 IP 71151-EP02 ERO Drill Participation 1, 2 04/04/2011 04/08/2011 IP 71151-EP03 Alert & Notification System MODS - MODIFICATION/50.59 INSPECTION 3 1, 2 05/23/2011 05/27/2011 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1, 2 06/06/2011 06/10/2011 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications EB3HS - HEAT SINK 1 1, 2 06/27/2011 07/01/2011 IP 7111107T Heat Sink Performance This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure