Attachment 5: Summary of Regulatory Commitments
ML100850401
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 03/25/2010
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML100850379 List:
References
Download: ML100850401 (1)


Text

ATTACHMENT 5 Summary of Regulatory Commitments The following table identifies commitments made by Exelon Generation Company, LLC (EGC) in this document. Any other actions discussed in the submittal represent intended or planned actions. They are described to the NRC for the NRC's information and are not regulatory commitments.

COMMITTED COMMITMENT TYPE COMMITMENT DATE OR ONE-TIME ACTION PROGRAMMATIC "OUTAGE" (Yes/No) (Yes/No)

Limitations regarding operation with an Prior to uprate Yes No inoperable LEFM system will be included in implementation the TRM.

The LEFM system for LGS, Units 1 and 2 will Prior to uprate Yes No be installed. implementation Plant maintenance and calibration Prior to uprate Yes No procedures will be revised to incorporate implementation Camerons maintenance and calibration requirements.

Final acceptance of the site-specific Prior to uprate Yes No uncertainty analyses will occur after the implementation completion of the commissioning process.

Modifications for the power uprate will be Prior to uprate Yes No implemented. implementation Necessary procedure revisions for the power Prior to uprate Yes No uprate will be completed.

implementation The plant simulator will be modified for the Prior to uprate Yes No uprated conditions and the changes will be implementation validated in accordance with plant configuration control processes.

Maintenance personnel will be qualified on Prior to work on No Yes the LEFM system. the system Operator training will be completed prior to Prior to uprate Yes No implementation of the proposed power uprate implementation changes.

Plant testing for the proposed changes will be As described Yes No completed as described in Attachment 6, Section 10.4, "Testing."

Plant-specific analyses for all potentially Prior to uprate Yes No limiting events will be performed on a cycle- implementation specific basis as part of the reload licensing process.