Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 11
ML110050136
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 12/29/2010
From: Simpson P
Exelon Generation Co, Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
RS-10-215
Download: ML110050136 (3)


Text

SAFEGUARDS INFORMATION Exelon.

Exelon Generation www.exeloncorp.com NucleaT 430.0 Winfield Road Warrenville, IL60555 10 CFR 50.54(p)(2) 10 CFR 50.4(b)(4)

RS-10-215 December 29, 2010 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456, STN 50-457 and 72-73

Subject:

Braidwood Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 11 In accordance with 10 CFR 50.54, "Conditions of licenses," paragraph (p)(2), Exelon Generation Company, LLC (EGO) is submitting Revision 11 to the Braidwood Station Security Plan. Changes to this document were implemented on November 23, 2010. In accordance with 10 CFR 50.54(p)(2), EGC is submitting these changes within 60 days of implementation (i.e., no later than January 22, 2011).

The Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan has been revised to:

1. Implement the changes necessary to reflect the physical changes made to the site Protected Area to accommodate the addition of Independent Spent Fuel Storage (ISFSI) to Braidwood Station.
2. Implement changes to response actions by the Owner Controlled Area (OCA) patrol regarding the Lake Screen House.

EGC has concluded that the changes do not decrease the safeguards effectiveness of the Braidwood Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan.

Attachments 1 and 2 contain Safeguards Information. Therefore, EGC requests that this information be withheld from public disclosure in accordance with 10 CFR 2.390, "Public inspections, exemptions, requests for withholding," paragraph (d)(1), and 10 CFR 73.22, "Protection of Safeguards Information: Specific Requirements," paragraph (a)(1)(i).

ATTACHMENTS 1 AND 2 CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED C

ýj-fa e'

SAFEGUARDS INFORMATION December 29, 2010 U. S. Nuclear Regulatory Commission Page 2 There are no commitments in this letter.

Should you have any questions concerning this letter, please contact Mr. Shawn P. Kirven at (630) 657-2929 Respectfully, Patrick R. Simpson Manager - Licensing Attachments:

1. Braidwood Station, Description of Changes Report, Revision 11 (Contains Safeguards Information)
2. Braidwood Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 11 (Contains Safeguards Information) cc: Regional Administrator - NRC Region III ATTACHMENTS 1 AND 2 CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED

bcc: NRC Project Manager, NRR - Braidwood Station (without attachments)

Site Vice President - Braidwood Station (without attachments)

Regulatory Assurance Manager - Braidwood Station (without attachments)

Director - Licensing and Regulatory Affairs - West (without attachments)

Licensing Engineer - West (without attachments)

Illinois Emergency Management Agency - division of Nuclear Safety (without attachments)

Exelon Document Control Desk - Licensing (Hard Copy)

Commitment Tracking Coordinator - West (M. Mathews)

Regulatory Assurance Specialist - A. Hambly C. Kelley - Cantera (without attachments)

S. Kirven - Cantera (without attachments)