2011 Kewaunee Power Station, Initial Examination Miscellaneous Correspondence
ML112000665
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 02/07/2011
From: Walton R
NRC/RGN-III/DRS/OLB
To:
Shared Package
ML111370599 List:
References
Download: ML112000665 (41)


Text

2011 KEWAUNEE POWER STATION INITIAL EXAMINATION MISCELLANEOUS CORRESPONDENCE

11.'

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 11/

2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINIOIS 60532-4352 January 31, 2011 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060*6711

SUBJECT:

OPERATOR LICENSING EXAMINATION APPROVAL

Dear Mr. Heacock:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Kewaunee Power Station.

The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and separately provided a list of approved applicants to Mr. Daniel E. Laing, Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9, Supplement 1, of NUREG-1021 , "Operator Licensing Examination Standards for Power Reactors," during the week of February 14, 2011.

The NRC staff will administer the operating tests during the weeks of February 7 and 14, 2011.

This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 630-829-9707.

Please contact your Chief Examiner, Mr. Raymond K. Walton, at 630-829-9836, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

D. Heacock -2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: Distribution via ListServ

D. Heacock -2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html(the Public Electronic Reading Room).

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: Distribution via ListServ DISTRIBUTION:

Daniel Merzke RidsNrrDorlLpl3-1 Resource RidsNrrPMKewaunee RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRS III Patricia Buckley Tammy Tomczak John McHale DOCUMENT NAME: G:\DRSIII\DRS\WORK IN PROGRESS\KEW 01 11 DRS OL EXAM APPROVAL.DOCX o Publicly Available 0 Non-Publicly Available -0 Sensitive 0 Non-Sensitive

To receive a copy of this document, Indicate In the box "CO Copy w/o attach/enel "E" Copy with attach/enel "N" =No copy OFFICE RIII:DRS Ic RIII:DRS IN RIII:DRS N I NAME JRKweiser:coat}G RKWalton k\{~1 HPeterson .l/I...t::J DATE 01/(}-'\I2011 If 01/;,/2011 011 >/12011 '(I' OFFICIAL RECORD COpy

  • UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINIOIS 60532-4352 August31,2010 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

KEWAUNEE POWER STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION

Dear Mr. Heacock:

In a telephone conversation on August 10, 2010, between Mr. Dan Lang, Manager of Nuclear Training and Raymond Keith Walton, Chief Examiner, arrangements were made for the administration of licensing examinations at the Kewaunee Power Station during the weeks of February 7 and 14, 2011. In addition, the U. S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of January 17, 2011.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 9, Supplement 1, of NUREG-1 021, "Operator licenSing Examination Standards for Power Reactors!' The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by October 11, 2010. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by November 17, 2010.

Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55..40(b)(3>>. an authorized representative of the facility licensee shall approve the outlines, examinations. and tests before they are submitted to the NRC for review and approval.

All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021 contains a number of NRC pOlicies and guidelines that will be in effect while the written examinations and operating tests are being administered.

  • D. Heacock -2 To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the 'first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Papetwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIAIPrivacy Services Branch (T-5 F52), U. S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-O018), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessibfe from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room}.

Thank you for your cooperation in this matter. Mr. Dan Lang has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Raymond Keith Walton at 630-829-9836, or me at 630-829-9707.

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 DISTRIBUTION See next page

Letter to David A. Heacock from Hironori Peterson, dated August 31, 2010.

SUBJECT:

KEWAUNEE POWER STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION cc: Distribution via ListServ Dan Lang, Manager of Nuclear Training Andrew Fahrenkrug, Lead Exam Developer

D. Heacock -2 To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collectibns, including suggestions for reducing the burden, to the Records and FOINPrivacy Services Branch (T-5 F52), U. S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV;and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Dan Lang has been advised of the poliCies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Raymond Keith Walton at 630-829-9836, or me at 630-829-9707.

Sincerely, IlJI/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 DISTRIBUTION See next page DOCUMENT NAME: KEW 08 10 DRS OL EXAM CONFIRMATION.DOCX o Publicly Available - 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive To receive a copy of this document, Indicate in the concurrence box "C" =Copy without attach/enc. "E" = Copy with attachIencl "N" = No copy OFFICE RIII:DRS IN RIII:DRS 1ft! I I NAME RKWalton:co ().\.J HPeterson JJv1 DATE 08f1.,'110 08fl:,V10 *~V OFFICIAL RECORD COPY

, .

Letter to David A. Heacock from Hironori Peterson dated August 31,2010.

SUBJECT:

KEWAUNEE POWER STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION cc: Distribution via ListServ Dan Lang, Manager of Nuclear Training Andrew Fahrenkrug, Lead Exam Developer Distribution:

Susan Bagley RidsNrrDorlLpl3-1 Resource RidsNrrPMKewaunee RidsNrrDirslrib Resource Steven Reynolds Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak John McHale

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINOIS 60532*4352 February 19, 2010 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS:

KEWAUNEE POWER STATION

Dear Mr. Heacock:

In a letter dated September 11,2009 (09-0461), Dominion Resources Services, Inc., requested we schedule initial operator license examinations in February 2011 and February 2013 at the Kewaunee Power Station. We have scheduled the examinations as requested. The examination requested during the month of February 2011 was scheduled to begin the week of February 6, 2011. The examination requested in February 2013 was scheduled to begin during the week of February 18, 2013. On-site validation of each of these examinations will occur approximately three weeks before the start of the examination. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to write an examination. The letter indicated each examination has more than nine applicants taking the examinations. Please inform us if the number of candidates for an examination declines below ten as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.

A supplementary letter will be sent to the Kewaunee Power Station's Training Department approximately 120 days prior to the initial examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.

D. Heacock In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice." a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html{the Public Electronic Reading Room).

Sincerely,

~ Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: Distribution via ListServ

D. Heacock -2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).

Sincerely,

/£11-/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: Distribution via ListServ DISTRIBUTION:

Susan Bagley RidsNrrDorlLpl3-1 Resource RidsNrrPIVIKewaunee RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\DRS\Work in Progress\KEW 02_10 DRS OL.doc o Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive To receive a cO!JY 0 f t his d ocument, .Ind'lcate in t he box "C" =Co>py w/o attach/encl "E" =COpy wi th attachiencI "N" =No copy OFFICE RIII:DRS .bIl\l"" I (L, RIII:DRS IP RIII:DRS IAI I NAME JKweise'flco DMcNeil ~ HPeterson ---*,,,,,,,

DATE If//

02/\\ 110 02/18 110 021{t{ 110 OFFICIAL RECORD COPY

Dominion Resources Services, Inc.

'IHH) I Jominion Boulevard. Clen Allen. VA ..'.\1*"(

\\.1> \ddrc,,, WWW.dQ01.com September 11, 2009 United States Nuclear Regulatory Commission Serial No.: 09-481 Attention: Document Control Desk NLOS/GLA Washington, DC 20555 Docket Nos.: 50-305 50-336/423 50-338/339 50-280/281 License Nos.: DPR-43 DOMINION ENERGY KEWAUNEE, INC. (DEK) DPR-65 DOMINION NUCLEAR CONNECTICUT, INC. (DNC) NPF-49 VIRGINIA ELECTRIC AND POWER COMPANY (Dominion) NPF-417 KEWAUNEE POWER STATION DPR-32/37 MILLSTONE POWER STATION UNITS 2 & 3 NORTH ANNA POWER STATION UNITS 1 & 2 SURRY POWER STATION UNITS 1 & 2 NRC REGULATORY ISSUE

SUMMARY

2009-11 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS In response to NRC Regulatory Issue Summary 2009-11, enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs).

No new commitments are intended by this letter. If you have any questions concerning this information, please contact Mr. David Llewellyn at (804) 273-4314.

Very truly yours,

'

I"),~) l/ ~~:

J' L. N. Hartz Vice President - Nuclear Support Services Attachments cc: U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415

SN 09-481 Scheduling of Operator licensing Examinations cc page 2 of 3 U. S. Nuclear Regulatory Commission Region" Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, Georgia 30303-8931 U. S. Nuclear Regulatory Commission Region III 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Dr. V. Sreenivas NRC Project Manager United States Nuclear Regulatory Commission One White Flint North Mail Stop 8 G9A 11555 Rockville Pike Rockville, MD 20852 Os. K. R. Cotton NRC Project Manager United States Nuclear Regulatory Commission One White Flint North Mail Stop 16 E15 11555 Rockville Pike Rockville, MD 20852 Ms. C. J. Sanders NRC Project Manager United States Nuclear Regulatory Commission One White Flint North Mail Stop 8 B1A 11555 Rockville Pike Rockville, MD 20852 Mr. P. S. Tam NRC Senior Project Manager United States Nuclear Regulatory Commission One White Flint North Mail Stop 8 H4A 11555 Rockville Pike Rockville, MD 20852 NRC Senior Resident Inspector Kewaunee Power Station NRC Senior Resident Inspector Millstone Power Station

SN 09-481 Scheduling of Operator Licensing Examinations cc page 3 of 3 NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station

NRC FORM 538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 315Q.0131 EXPIRES: 1013112011

('G-200&) EstImeted burdenfer res~e to comply with thl$ voluntary informalion coIeQtion IIICI\IfI.$I: hour. InfonnatIoIl coIIedIon II UMd 10 plen budgets lind _roe. for operator ~tIon.. Send IXlmmenlll ~eid~bunten flallmale;;:j ReCorda and FOlAiPrivaq SelVlcn Bnmeh *5 F ). U.S.

OPERATOR LICENSING Nuclear R lory Ccmm/asion. WashiIlQli!l, DC 20555-000

  • or~t EXAMINATION DATA a-mall to and ~

8:' and 10 the Deale 0IIIcer. Office of lion

.10202. (315Q.0131), Offtce of Manlqflmenl lind Budget. Was 20503. I II means used 10 l~ an ,nfDm'llltlon coIIIii:tlon den not dl8ptay a curren.V wild OMS contml number,lIMt NRC "18Y not conduct or.::.nsor, and. person Is nol required to respond to. the informatbn coil

  • F~ClUTY NRC REGION Kewaunee Power StatlOD III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF

-

CY 2010 CY2011

- -

CY2012

-

Cy 2013 LICENSEE*PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR UCENSE EXAMINATIONS PROPOSED NUMBER CY 2010

- -

Cyl011 CY2012

- -

Cy2013 NUMBER OF REACTOR 0 4 0 S OPERATORS NUMBER OF SENIOR REACTOR 0 5 0 9 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0 3 0 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS* LIMITED 0 PROPOSED DATES PRIMARY DATE 02J0712011 OZl18l2013 ALlERNATE DATE 0212112011 0310412013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINA1"ION (GFE) SCHEDULE CY 2010 CY 20U PROPOSED NUMBER

- -

MARCH JUNE SEPTEMBER OECeMBER MARCH JUNE SEPTEMBER OECEMBER ESTIMATED NUMBER OF 14 CANDIDATES "IRC FORM 536 (10-2OO8) PRINTED ON RECYCLED PAPER

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150-0131 EXPIRES: 1013112011

"'eo eatlmated burden per re6~ns. to comply with thill VOlunlary Informallon (10-2OIlf) coIIacIIon request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. IIlnlonnatloO coIIecIkm ia ueed to pIIIn budgets and 1810\1rce8 for operator ._lnatlons. Send _ I I buri:Jen estimate to the ReQords and FOJAlPrlvacy Service. BI"Il1Ilh -6 F ). U.s.

OPERATOR LICENSING NuoJ_ ~ CommlAlon. Wasll~. DC 20566-000

  • or ~et

.-mall 10 In GlIIOnrc~. and to the Desk OI!Icer, 0IIIce of In lion EXAMINATION DATA Ind RegU\~~E 10202. (3150-0131). 0IIk:8 of Man~and BU!Iget, W

  • 20503. If a means wiecI to Irnpoee lin lion colleCllon dow not dleplay II currently valid OMS control number. Iba NRC may not condu~nsor. and a parson Is nol required 10 respond to, the information
  • FACIUTY NRC REGION MlIIstoae Unit :2 1

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010

- CV 2011

- CY 2012

- -

Cy2013 ESTIMATED NUMBER OF L1CENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER

-

CY 2010 CY2011

- -

CylOJ2 CylO13

-

NUMBER OF REACTOR 0 5 0 6 OPERATORS NUMBER OF SENIOR REACTOR 0 7 0 6 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 4 0 :2 OPERATORS-UPGRADE 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS

- -

MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE ~EPTEMBER DECEMBER ESTIMATED NUMBER OF 12 CANDIDATES NRC FORM 5311 (10.2G08) PRINTED ON R£CYCI.S) PAPER

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 315().()131 EXPIRES: 10131/2011 (10..2008) Estimated burden p9r I'ft~n.e 10 comply with this volunlal}' inrormatlon coIIec:IIon and rNourcunKlU881: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. _Inallona.

for op9ralOr cohctIani=-:~r ~

Ie InlolmatloilSand c:omm.... 'nL burilen OPERATOR LICENSING ..Umata 10 the RIICOIdI and FOlAlPrtvacy S'1VicH -6 F ). u.s.

NucI_ R=~ Comminton. ~n. DC or ~liltemel e-mail 10 In I~rc.s:. and to !hit Desk.~. Ol'llce ot I nnallon EXAMINATION DATA and ~.:Yr AlJaInioS'E B-102021f (3150-0131). 0!II0It Of ~and BIIlfIJeJ, W ngion. 20503. a ..-ne uied to Impose an lion c;o)llii:!Ion doea not dllplay a cummIIy valid OMB collll'tll number, tile NRC II1lIY nol conduct o~nsor. and a parson Is not required to respond to, th e Intormallon coli

  • FACILITY NReREGION Millstone Unit 3 1

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010

- -

CY2011

-

CY 1012 CY 2013

-

ESTIMATED NUMBER OF lICENSEE*PREPARED 0 I 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINAnONS B. INITIAL OPERATOR LlCENSEEXAMINA"rlONS PROPOSED NUMBER

-

CY 1010

-

CylOll

-

CV 2011 CylO13

-

NUMBER OF REACTOR 0 3 0 6 OPERATORS NUMBER OF SENIOR REACTOR 0 7 0 6 OPERATORS .. INSTANT NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 0 4 0 2 NUMBER OF SENIOR REACTOR 0 0 OPERATORS* LIMITED 0 0 PROPOSED DATES PRIMARY DATE 07/1011011 0210312013 ALTERNATE DATE 07/17120lJ 0211712013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 1011 PROPOSED - -

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE ~EPTEMBER DECEMBER ESTIMATED NUMBER OF 11 CANDIDATES

!liRe FORM 536 111l-2OD8) PRINTED ON RECYCLED PAPER

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150-0131 EXPIRES: 1013112011 (10-2008) Estimated burden ~r res~n.. to comply with this volunl_ry Infonna1ion coIIldiDn request: hour. It InfonneUon collection Is used 10 ~ budgllls and reaoll\'C8l lor opanrtor _lneIIonll. Send colllllltllla ~B burden OPERATOR LICENSING EXAMINATION DATA Nuclear e-mail 10 and

=tory ullmate to the ReCOIdIl and FOIAlP~Services Brench -6 F 3). U,S.

Reg=.:nllireo CommI8IIon. Was

~rc'8'iv. and to th8 Desk NE 9010202. (3150-013

  • 0
  • or ~

of I oJ ~and S~ Was C 20503. If

  • means uSed to Impoae an lion coII8CtiIn doea not _illY' QIII'IIlfly valid OMS oonllOl number. tho NRC may i.

!lOt conduct~DIlIor. Ind _ plrean !lOt requIred to relpond to, the Information on.

FACIlITY NRCREGIOH North Anna Power Station D

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY 1010

- -

CY2011 Cy2012

- -

CY 2013 lICENSEE*PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER

-

CylOlO

-

CylOl1 CylO12

- -

Cy2013 NUMBER OF REACTOR 9 0 9 0 OPERATORS NUMBER OF SENIOR REACTOR 6 0 7 0 OPERATORS* INSTANT NUMBER OF SENIOR REACTOR 3 OPERATORS-UPGRADE 3 0 0 NUMBER OF SENIOR REACTOR OPERATORS

NUMBER MARCH JUNE iSEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 16 CANDIDATES NRC FORM 538 110-200II) PRINTED ON RECYCLED PAPeR

NRC FORM 536 U.S. NUCLEAR REGULATORY CO_ISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 1013112011 (1t>-2008) Estim8led burden par res~e to comply with this voluntary lnfonnatlo n ooIlacOon requ8$l: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. '- Informllllon oohclion Is used 10 plan budge ll end ntlQUrcea for o~ uaminldlonl. Send comme" III I'dinB burilen OPERATOR LICENSING estimate to the ReGOrde and FOlA/Pl'lvaoy Se -5 F 3). U.S.

Nuc::lNr ~1ak.Ify CommIssion, Welllll1Qll!n. DC

  • 01' ~

Ila9IsCnro.~v. and 10 the Desk EXAMINATION DATA e-mell 10 in end Reg\!lJI.:r, AtfIllniDcNE 8*10202. (3150-0131),

of In of ~ and Budget. W nglon 20603. If a mae". uMcIlO Impose en nformetion cofttiCIIon don not dIIplay II currently valid OMS conlIOI number, Ihe NRC I1I8Y not conduct o~neor. and e peraon I, not required 10 reapond to. the inronnatlon coli on.

FACILITY NRC REGION Surry Power Station II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF

-

Cy 2010 Cy2011

- -

CY 2012 Cy2G13

-

LICENSEE-PREPARED 0 0 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 1 0 1 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010

- Cy201l

- -

CY2012 ey2013

-

NUMBER OF REACTOR 9 0 J1 0 OPERATORS NUMBER OF SENIOR REACTOR 10 0 6 0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 2 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS - LIMITED 0 PROPOSED DATES PRIMARY DATE 0712612010 08I131Z012 AtTERNATE DATE 0810112010 081l0lZ011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED - -

NUMBER MARCH JUNE SEPTEMBEA DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 18 CANDIDATES NRC FORM 536 (1t>-200&) PRINTED ON RECYClED PAPER

October 7, 2008 Mr. David A. Christian President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

CONFIRMATION OF INITIALlREQUALIFICATION OPERATOR LICENSE EXAMINATIONS: KEWAUNEE POWER STATION

Dear Mr. Christian:

In a letter dated August 14, 2008 (08-0436), Dominion Resources Services, Inc., requested we schedule initial operator license examinations in April 2009, February 2011, and October 2012 at the Kewaunee Power Station. We have scheduled the examinations as requested. The examination requested in April 2009 will begin the week of April 13, 2009. The examination requested during the month of February 2011 was scheduled to begin the week of February 6, 2011. The examination requested in October 2012 was scheduled to begin during the week of October 29,2012. On-site validation of each of these examinations will occur approximately three weeks before the start of the examination. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to write an examination. The letter indicated each examination has more than nine applicants taking the examinations. Please inform us if the number of candidates for an examination declines below ten as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.

A supplementary letter will be sent to the Kewaunee Power Station's Training Department approximately 120 days prior to the initial examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you have in the training program.

We have scheduled a Licensed Operator Requalification Training Program Inspection (IP 71111.11) for the week of November 17, 2008. Please inform us at your earliest opportunity if you discover this week is outside of your normally scheduled requalification training program's annual examinations. If you have any questions concerning this information, please contact Mr.

Dell McNeil of my staff at 630-829-9737.

D. Christian -2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and M;:magement System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely, IRA!

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: S. Scace, Site Vice President M. Wilson, Director, Nuclear Safety and Licensing C. Funderburk, Director, Nuclear Licensing and Operations Support T. Breene, Manager, Nuclear Licensing L. Cuoco, Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin P. Schmidt, State Liaison Officer

D. Christian -2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.htmi.

Sincerely, IRA!

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No, DPR-43 cc: S. Scace, Site Vice President M. Wilson, Director, Nuclear Safety and Licensing C. Funderburk, Director, Nuclear Licensing and Operations Support T. Breene, Manager, Nuclear Licensing L. Cuoco, Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin p, Schmidt, State Liaison Officer DISTRIBUTION:

Daniel Collins Tamara Bloomer Patrick Milano RidsNrrDirslrib Resource Mark Satorius Kenneth Obrien Jared Heck Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\DRS\WORK IN PROGRESS\KEW 100708 DRS OL.DOC X Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive T ' a COPl 0f t h'IS d ocument, ID o receIVe

  • t he box "C" = COPY WI0 attachieDCI""
  • d'Icate ID E == Copy WI"th attachieDCI "N" =-No copy OFFICE RIII:DRS I RIII:DRS I RIII:DRS I I NAME JKweiser:cco DMcNeil HPeterson DATE 10/02/08 10/02/08 10/07/08 OFFICIAL RECORD COPY

Subject:

Kewaunee Letter Re Confirmation of Initial Exam Attachments: KEW 100708 DRS OL.doc The subject document has been completed and has been submitted to DPe to be declared in ADAMS. A Word copy of the document has been attached and the document has been assigned Accession

  1. ML082880670.

1

Dominion Resources Servites, Inc.

,(1110 Dominion Boulevard. Lien AII.-I1. VA '\(1.,11

)Dominion**

\X :b'lddres.s: www.dom.com August 14, 2008 United States Nuclear Regulatory Commission Serial No.: 08-0436 Attention: Document Control Desk NLOS/MBB Washington, DC 20555 Docket Nos.: 50-305 50-336/423 50-338/339 50-280/281 License Nos.: DPR-43 DPR65 DOMINION ENERGY KEWAUNEE, INC. lDEK) NPF-49 DOMINION NUCLEAR CONNECTICUT, INC. (DNC) NPF-4f7 VIRGINIA ELECTRIC AND POWER COMPANY (Dominion) DPR-32/3?

KEWAUNEE POWER STATION MILLSTONE POWER STATION UNITS 2 & 3 NORTH ANNA POWER STATION UNITS 1 & 2 SURRY POWER STATION UNITS 1 & 2 NRC REGULATORY ISSUE

SUMMARY

2008-16 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATION§ In response to NRC Regulatory Issue Summary 2008-16. enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs).

No new commitments are intended by this letter. If you have any questions concerning this information. please contact Mr. David Llewellyn at (804) 273-4314.

Very truly yours, c.~urk-Director - Nuclear Licensing & Operations Support Dominion Resources Services, Inc.

for Dominion Energy Kewaunee, Inc.,

Dominion Nuclear Connecticut, Inc. and Virginia Electric and Power Company Attachments

SN 08-0436 Scheduling of Operator Licensing Examinations cc page 1 of 2 cc: U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW. Suite 23 T85 Atlanta. GA 30303-8931 U. S. Nuclear Regulatory Commission Region III 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Ms. C. J. Sanders Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 883 Rockville, MD 20852-2738 Mr. S. P. Lingam Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8 G9A Rockville, MD 20852-2738 Mr. P. S. Tam Senior Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8G9a Rockville, MD 20852-2738

SN 08-0436 Scheduling of Operator Licensing Examinations cc page 2 of 2 NRC Senior Resident Inspector Millstone Power Station NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station NRC Senior Resident Inspector Kewaunee Power Station

NRC FORMS36 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08131/2008 (11*2005) Estimated burden per res~onse 10 comply with this voluntary Information collection request 1 oour. his informalion collection is used to pia n budgets and resources lor operator examinetlons. Send comments ~ardin~ burden estimate to the Records and FOlAlPrivacv Services Branch -5 F 3}. U.S.

OPERATOR LICENSING Nuclear R~Ulatory Commission. Washington. DC 20555-000

  • or bl. Internet e-mail to In ocoliecls@nrc.~y. and to the Desk Officer. Ollica 01 In ormation EXAMINATION DATA and Regulatory Affairs, NE B*10202. (J150-01Jl), Office 01 Man~emenl and Budget. Washington. DC 2()50J. If a means used to impose an Information collection does not display a currently valki OMS cootrol number. Iha NRC may nOI conduct or sponsor. and a person is not required to respond 10. the information oolledlon.

FACILITY NRC REGION Kewaunee Power Station

\II A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 11 CY 12 PROPOSED NUMBER CY 09

- CY 10

- - -

ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 09

- -

CY 10 CY 11

- -

CY 12 NUMBER OF REACTOR 5 0 5 5 OPERATORS NUMBER OF SENIOR REACTOR 0 9 9 8

OPERATORS" INSTANT NUMBER OF SENIOR REACTOR 0 0 1 1 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 04/13/2009 0210712011 10/15/2012 ALTERNATE DATE 05/04/2009 0212112011 10/29/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 09 CY 10 PROPOSED ---" -

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER EST!MATED NUMBER OF 15 CANDIDATES N~C FORM 536 18-20051 PRINTED ON RECYCLED PAPER

NRC FORMS36 U.S. NUCLEAR REGULATORY COMMISSION APPROveO BY OMB: NO. 3I 5().{l I 31 EXPIRES: 0613112008 (8-2005) Estimated burden per res~onae to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection is used to plan budgets and resources for operator examinations. Send comments r~ardl~ burden eatimata 10 Ihe ReCo<<l. and FOIAIPrivacy Services Branch \ *S F 3). U.S.

OPERATOR LICENSING Nuclear R:'JluIe\DtY Commlsslon. Washington, DC 20555-000 , or b~ Intemel e-mail to i ocoIlectSOnrc.~v' and to the Desk Officer, Office 0/ In ormation EXAMINATION DATA and RegulatClr( Allm, NE a. 10202, (3150-0131). Office of M~nI and Budge!. Washington. DC 20503. If a means used to impose an nformalion collection does no! display a currently valid OMS oonlrol number, the NRC may not conduct o~onsor. and a person is not required to respond to. the Infonnation col on, FACILITY NRC REGION Millstone Power Station Unit 2 I

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF

-

CY 09 CY 10

- CY 11

- CY 12

-

lICENSEE*PREPARED 0 1 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER

-

CY 09

-

CY 10 CY 11

- CY

- 12 NUMBER OF REACTOR 4 4 0 0 OPERATORS NUMBER OF SENIOR REACTOR 8 0 0 3

OPERATORS* INSTANT NUMBER OF SENIOR REACTOR 6 2 0 0 OPERATORS* UPGRADE NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 01/1912009 0611412010 ALTERNATE DATE 01126/2009 06128/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 09 CY 10 PROPOSED .

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 CANDIDATES NRC FORM 536 (8-2005) PRImED ON RECYCLED PAPER

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 315G-0131 EXPIRES: 0813112008 (8-2005) Estimated burden per res~onse to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his Information collection is usad 10 plan budgets and resources for operator examinations*. Send comments ~ardln~ burden estimate to the Records and FOWPrivacy Serviees Branch *5 F 3). U.S.

OPERATOR LICENSING Nudear ~ulatory Commission. WashlnglQn. DC 20555..000

  • or b" intemet e.mallto In ocallecls@nrc.~v. lind to the Desk OffIcer. Office 01 In armation EXAMINATION DATA and Regulatory Affairs. NE .10202. (3150-0131). OffIce of Man~t and Budget. WaShington. DC 20503. If a means usad 10 impose an 1nlormalion collection does not display a currently valid OMS control number, !he NRC may not conduct or se;,nsor. and a person is nat required to respond to, the Information collect
  • FACILITY NRC REGION Millstone Power Station Unit 3 I

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER

-

CY 09

-

CY 10 CY 11

- -

CY 12 ESTIMATED NUMBER OF lICENSEE*PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER

-

CY 09 CY 10

- CY 11

- -

CY 12 NUMBER OF REACTOR 6 0 8 0 OPERATORS NUMBER OF SENIOR REACTOR 0 4 0 8

OPERATORS

  • INSTANT NUMBER OF SENIOR REACTOR 2 0 0 0 OPERATORS* UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 09/14/2009 0112512011 ALTERNATE DATE 09/2812009 01118/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 09 CY 10 PROPOSED --

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 CANDIDATES NRC FORM 536 (8-2005) PRINTED ON RECYCLED PAPER

NRC FORM 636 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150-0131 EXPIRES: 0813112008 (8*2005) Estimated burden per res~n88 to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Is information collection is used to plan budgets and _roes for operator examinations. Sand comments ~anlin~bllrdan estimate to the Records and FOIAIPrivaey Services Branch *5 F ). U.S.

OPERATOR LICENSING Nud_ R::?,ulatofy Commission. Waahlnglon. DC 20555-000

  • Of :10 Iiltemel EXAMINATION DATA e-mail 10 in OCOlledllQnn:.gov. and 10 thit Desk OIIIcer. omca of I rmatIon and Ragulat~ AffaIrS. NE 8-10202, (3150-0131). 0fIice of Manaqemant ~d Budget. Washington DC 20503. If a means uSed to Impose an Information oollection does no! diSplay a currenUy valid OMS control number. the NRC may nol conduct or .ponsor. and a parson ia not required to respond to. the Information cdlection.

FACIUTY NRC REGION North Anna Power Station

/I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 09

- CY 10

- -

CY 11 CY 12

-

ESTIMATED NUMBER OF UCENSEE-PREPARED 1 1 0 1 EXAMINATIONS (written only)

ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER

-

CY 09

-

CY 10

-

CY 11

-

CY 12 NUMBER OF REACTOR 3 12 0 10 OPERATORS NUMBER OF SENIOR REACTOR 5 0 5 1

OPERATORS -INSTANT NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 2 3 0 3 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE *0210212009 0610712010 0611112012 ALTERNATE DATE 0112712009 0611412010 0611812012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 09 CY 10 PROPOSED --- ~--

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 17 CANDIDATES NRC FORM 536 (&.2005) PRlNTEO ON RECYCLED PAPER

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150-0131 EXPIRES: 0813112008

{8-2005) Estimated burden per res~onse to comply with this voluntary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection is used to plan budgets and resources for operator examinations. Send oomments ~rd~ burden estimate !o the Records and FOIA/Privacy Services Branch *5 F 3). U.S.

OPERATOR LICENSING Nuclear Re~ulatory Commission, Washi~n, DC 20555-000 ,or ~ Intamel e-mail 10 in OCOllecls@nrc'SOIl, and to the Desk Officer, Office of In ormation EXAMINATION DATA and RegUlafo~ Affairs, NE B*l0202, (3150-0131). Offtce 01 Managemen! and Budge~ Wash nglon, DC 20503. If II means used to impose an information collectlon does not display II currenUy IIBlid OMS control number, the NRC may not conduct or sconsor, and a person is not required 10 respond to, the Information collect on.

FACILITY NRC REGION Surry Power Station II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY 09

- -

CY 10

-

CY 11

-

CY 12 L1CENSEE*PREPARED 0 0 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 1 1 1 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER

-

CY 09

-

CY 10 CY 11

- CY 12

-

NUMBER OF REACTOR 14 12 0 0 OPERATORS NUMBER OF SENIOR REACTOR 6 6 0 0

OPERATORS* INSTANT NUMBER OF SENIOR REACTOR 6 2 4 0 OPERATORS* UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS* LIMITED PROPOSED DATES PRIMARY OATE 07/20/2009 07126/2010 10/31/2011 ALTERNATE DATE 07/2712009 0810212010 11114/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 09 CY 10 PROPOSED -- -

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 20 20 CANDIDATES N'lC FORM 536 (8*200S) PRINTED ON RECYClED PAPER

SN 08-0436 Scheduling of Operator Licensing Examinations bc page 1 of 1 bc: (electronic distribution except as noted by*)

Mr. C. A. McClain, NAPS Mr. J. B. Scott, Jr., NAPS Mr. W. F. Shura, NAPS Mr. A. T. Barbee, SPS Mr. D. H. Wilson, SPS Mr. J. T. Spence, MPS Mr. T. A. Horner, MPS Mr. M. J. Cote, MPS Mr. F. Winks, IN2NE Mr. T. W. Kulterman, SPS Mr. P. Kemp, NAPS Mr. B. A. Garber, SPS Mr. W. D. Bartron, MPS Mr. T. L. Breene, KPS Mr. D. W. Allen, KPS Mr. D. M. Emery, KPS Mr. B. Krauth, MPS Mr. W. E. Brown, MPS Mr. D. Llewellyn, IN2NE Ms. N. Wen borne, KPS Mr. C. Tarantino, IN2SE Ms. L. Cuoco, Tredegar Lie File*

Records Management * (bc original), INGW CONCURRENCE D. A. Sommers H. A. Royal ACTION PLAN

1. None.

VERIFICATION OF ACCURACY

1. Estimates given to Margaret Bennett per David Llewellyn's e-mail dated 7/24/08.

REQUIRED CHANGES TO THE UFSAR OR QA TOPICALREPORT 1 None.

Dominion Resources Services, Inc.

5000 Dominion Boulevard, Glen Allen, VA 23060 Web Address: www.dom.com August 16, 2007 United States Nuclear Regulatory Commission Serial No.: 07-0517 Attention: Document Control Desk NLOS/MBB Washington, DC 20555 Docket Nos.: 50-305 50-336/423 50-338/339 50-280/281 License Nos.: DPR-43 DPR65 DOMINION ENERGY KEWAUNEE, INC. (DEK) NPF-49 DOMINION NUCLEAR CONNEC"rlCUT, INC. (DNC) NPF-4/7 VIRGINIA ELECTRIC AND POWER COMPANY (Dominion) DPR-32/37 KEWAUNEE POWER STATION MILLSTONE POWER STATION UNITS 2 & 3 NORTH ANNA POWER STATION UNITS 1 & 2 SURRY POWER STATION UNITS 1 & 2 NRC REGULATORY ISSUE

SUMMARY

2007-17 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS In response to NRC Regulatory Issue Summary 2007-17, enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs).

No new commitments are intended by this letter. If you have any questions concerning this information, please contact Mr. John Hayden at (804) 273-2707.

C. L. Funderburk Director - Nuclear Licensing & Operations Support Dominion Resources Services, Inc.

for Dominion Energy Kewaunee, Inc.,

Dominion Nuclear Connecticut, Inc. and Virginia Electric and Power Company Attachments AUG 2 1 2007

SN 07-0517 Scheduling of Operator Licensing Examinations cc page 1 of 2 cc: U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23 T85 Atlanta, GA 30303-8931 U. S. Nuclear Regulatory Commission Region III 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 .

Mr. J. D. Hughey Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 883 Rockville, MD 20852-2738 Mr. R. A. Jervey Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8G9A Rockville, MD 20852-2738 Mr. S. P. Lingam Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8 G9A Rockville, MD 20852-2738

SN 07-0517 Scheduling of Operator licensing Examinations cc page 2 of 2 Mr. P. D. Milano Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8G9a Rockville, MD 20852-2738 Mr. R. I. Treadway NRC Senior Resident Inspector Millstone Power Station Mr. J. T. Reece NRC Senior Resident Inspector North Anna Power Station Mr. E. Riggs NRC Senior Resident Inspector Surry Power Station Mr. S. C. Burton NRC Senior Resident Inspector Kewaunee Power Station

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPRoveD BY OMS; NO. 315O-<l131 EXPIRES; 0813112008 (8-2005) Estimated burden per r.s~ons. to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. hilS informallon colledlon is IISed to plan budgets and resources for operator examinations. Send comments ~rdin~ burden estimate to the Records and FOIAIF'rlvacy Services Branch *5 F 3), U.S.

OPERATOR LICENSING Nuclear R~ulato Commiaaion, Washlngkm. DC 20555-000

  • or  ::h internet e-maH to i
  • and to the Desk OffICer. Offlce of I ormation EXAMINATION DATA and Regurat:rr 10202. (3150-0131). Offlce of Ma~ and Budget. Wash 20503. If II means IlSed to impose an IIlformalion collection dee. not display a curremly valid OMB conIrDI number. the NRC may not conduct or sponsor, and a person Is not required to respond to. the information collection.

FACILITY NRC REGION KEWAUNEE POWER STATION Region III A. PROPOSED EXAMINATION PREPARATION SCHEDULE OPOSED NUMBER CY08 CY-D]. CYJJL CY 11" ESTIMATED NUMBER OF LlCENSEE-PREPARED 0 15 0 15 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 08 CY 09 Cyl0 CY 11 PROPOSED NUMBER

- - - -

NUMBER OF REACTOR OPERATORS 0 5 0 5 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 0 9 0 9 NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 0 1 0 1

'.

NUMBER OF SENIOR REACTOR OPERATORS LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 04/13/2009 02/07/2011 ALTERNATE DATE 05/04/2009 02/21/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 08 CY 09 PROPOSED -_._.,.

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES NRC FORM 538 (8-2005) PRINTED ON RECYCLEO PAPER

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVEO BY OMS: NO.31S()'0131 EXPIRES: 08/31/2008 (8-2005)

Estimated burden per (es~se to comply with this voluntary information coIIeetion request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. 's information coneclion ill used to plan budgets and nssourees for operator examinations. Send comments r1rdins burden estimate to the Records and FOINPrivacy Services Branch -5 F 3). U,S.

OPERATOR LICENSING Nuclear ~EI9u1atory Commission. Washinglon, OC 20555-000 , or::t; Intemet

  • OV, and to the Desk OfIicer, OffIce of I ormalion EXAMINATION DATA a 10202, (315().O131). Offtce of Man~ and Budget, WashIng! 20503. If a means uSed 10 impose an information colleetion doaa not splay a currenUy valid OMS control number, the NRC may nol conduct o~n$Or. and a person is not required 10 respond to. the information coil on.

FACILITY HRCREGION MILLSTONE POWER STATION UNIT 2 Region I A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 08 CY 09 CY 10 CY 11 PROPOSED NUMBER

- - - -

ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS a 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 08 CY 09 CY 10 CY 11

- - - -

NUMBER OF REACTOR OPERATORS 4 0 4 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 5 0 8 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 4 6 2 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PR9pOSED DATES PRIMARY DATE 01/19/2009 09/15/2009 12/07/2110 ALTERNATE DATE 01/12/2009 09/29/2009 12/14/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 08 CY 09 PROPOSED -

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 CANDIDATES NRC FORM 536 (6-2005) PRINTED ON RECYCLED PAPER

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0813112008 (8-2005) Estimated burden per response to comply with this voluntary information ooIIection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This infonnation collection is used to n budgets and resources for operator examlnetions. Send comments g bumen estimate to the Records and FOIA/Prlvacy S . 53), U.S.

OPERATOR LICENSING Nuclear Regulatory Commission, Washington, 0 by internet e-mail to infoeolieCtsQnrc:~,. and to the Desk Officer, Office of Information EXAMINATION DATA and Regulal~ Affa , (31S()'{)131). Office of Management and Budget, Washington. DC 20:)1.1;'. ..If a means used to impose an information collection does not display a currently valid OMS control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FAGILIIY NRC REGION MILLSTONE POWER STATION UNIT 3 Region I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY09 CY...lQ.. CYJ.L ESTIMATED NUMBER OF L1CENSEE*PREPARED EXAMINATIONS o 1 1 o ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS o o o o B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 08 CY 09 CY 10 CY 11 NUMBER OF REACTOR OPERATORS o 6 8 o NUMBER OF SENIOR REACTOR OPERATORS

  • INSTANT o 8 4 o NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE o 2 o a NUMBER OF SENIOR REACTOR OPERATORS* LIMITED o o o o PROPOSED DATES PRIMARY DATE 06/16/2009 01/25/2011 ALTERNATE DATE 06/23/2009 01/18/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 08 CY 09 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 14 12 CANDIDATES NRC FORM 536 (8-2005) PRINTED ON RECYCLED PAPER

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVEO BY OMS: NO. 3150-0131 EXPIRES: 0813112008 (8-2005) Estimated burden fer re$~onse to comply with this voluntary Informalion collection request hour. his inlomalion coIectlon is used to plan budgets and resources for operator examinalions. Send comments r~ai'dln~ burllen OPERATOR LICENSING estimate to the Records and FOIAIPrivacy Services Branch ~ *5 F 3), U.S.

NUClear R~ulatory Commission, Washington, OC 20555-000 ,or blc internet

.mall to j ocoIleds@nrc.gov, and to the Oesk OIIicer, OfIice of In omation EXAMINATION DATA and Regulat~ Affairs, NE B-10202, (3150.0131), 0IIk:e of Management and Budget, Washington! DC 20503. If a means used to impose an infomation collection does not diSplay a currently valid OMS control number, the NRC may not conduct o~onsor. and a person is not required to respond 10, tile information coil on.

FACILITY NRC REGION NORTH ANNA POWER STATION Region I I A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 08 CY09 Cy 10 CY 11 PROPOSED NUMBER

- -- - -

ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER

-

CY 08

-

CY09 Cy 10

- CY 11

-

NUMBER OF REACTOR OPERATORS 9 0 10 0 NUMBER OF SENIOR REACTOR OPERATORS* INSTANT 3 0 4 0 NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 2 0 3 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 06/07/2010 06/09/2008 ALTERNATE DATE 06/16/2008 06/14/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 08 CY 09

_._

PROPOSED ,~,-"",---

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 CANDIDATES NRC FORM 536 (11-2005) PRINTED ON RECYCLED PAPER

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 315()..O131 EXPIRES: 08131/2008 (8-2005) Estimated burden per res~onse to comply with this voluntary information ooUection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection is used to plan budgets and resources fer operator examinations. Send comments~r-r.~T~:iiien estimate to the Records and FQtAlPrivacy Servi U. S.

OPERATOR LICENSING Nuclear R~u1atory Commission, Washington, DC , or ~intemet EXAMINATION DATA e-mail t:uiiii~:;:lIeds@nrc.gov. and to the Desk OftIcer*. ~? of I rmation and Reg Affeirs. NE 9-10202, (3150-0131). OfIIce of Man~ and Budget, vv;~nrfot~ DC 20503. If a means used to Impose an Information coIJ!lction does display a currel"llly valid OMS control number, \he NRC may not conduct or sponsor, and a person is not required to respond to, the Information collection.

FACILITY NRC REGION SURRY POWER STATION Region II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF Cy08

- CY 09

- CylO

- -

CY11 LICENSEE*PREPARED 0 0 0 EXAMINATIONS 0

ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 1 1 0 1 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy 08 CY 09 CYIO CYll

- - - -

NUMBER OF REACTOR 0 10 OPERATORS 8 15 NUMBER OF SENIOR REACTOR OPERATORS

  • INSTANT 3 5 0 4 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 3 4 0 3 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 O' 0 0 PROPOSED DATES PRIMARY DATE 03/17/2008 10/12/2009 05/17/2011 ALTERNATE DATE 03/24/2008 11/24/2009 06/17/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINAonON (GFE) SCHEDULE CY _QL CY 09 PROPOSED '--'

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 20 CANDIDATES NRC FORM 536 (8-2006) PRINTED ON RECYCLED PAPER