|
---|
Category:Technical Specification
MONTHYEARML24135A0642024-05-17017 May 2024 Correction Letter - Amendment Nos. 253 and 208 Regarding Conversion to Improved Standard Technical Specifications L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2022-017, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42022-03-0707 March 2022 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2019-147, Exigent Technical Specification Amendment Request One-Time Allowed Outage Time Extension for Inoperable EDG2019-07-19019 July 2019 Exigent Technical Specification Amendment Request One-Time Allowed Outage Time Extension for Inoperable EDG L-2019-076, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42019-03-28028 March 2019 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2019-055, Stations - Supplement to Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications2019-03-26026 March 2019 Stations - Supplement to Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications L-2018-215, Resubmittal of Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2018-11-30030 November 2018 Resubmittal of Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-2018-178, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42018-10-0202 October 2018 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 ML18096B4482018-04-0606 April 2018 Proposed Technical Specifications L-2017-166, Submittal of Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42017-09-20020 September 2017 Submittal of Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2017-077, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42017-05-0404 May 2017 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2017-041, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month,' Using the Consolidated Line Item Improvement Process2017-03-30030 March 2017 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month,' Using the Consolidated Line Item Improvement Process L-2016-227, License Amendment Request Change to P /T Limit Curve and LTOP Period of Applicability2016-12-22022 December 2016 License Amendment Request Change to P /T Limit Curve and LTOP Period of Applicability L-2016-087, Florida Power & Light Company, on Periodic Report of Changes to the St. Lucie Unit 2 Technical Specification Base2016-04-15015 April 2016 Florida Power & Light Company, on Periodic Report of Changes to the St. Lucie Unit 2 Technical Specification Base L-2016-008, Application for Technical Specification Change Regarding Moderator Temperature Coefficient (Mtc) Surveillance Test Elimination at the End of Cycle2016-01-19019 January 2016 Application for Technical Specification Change Regarding Moderator Temperature Coefficient (Mtc) Surveillance Test Elimination at the End of Cycle ML15280A3922015-10-19019 October 2015 Correction to Amendment Nos. 226 and 176 Change to Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program. L-2015-222, Technical Specification Bases Control Program, Periodic Report of Bases Changes TS 6.8.4.j.42015-10-15015 October 2015 Technical Specification Bases Control Program, Periodic Report of Bases Changes TS 6.8.4.j.4 L-2015-180, Proposed TS Changes for TSTF-523 LAR Incorporating Approved TSTF-425 LAR2015-06-30030 June 2015 Proposed TS Changes for TSTF-523 LAR Incorporating Approved TSTF-425 LAR ML15198A0302015-06-30030 June 2015 St. Lucie, Units 1 and 2 - Proposed TS Changes for TSTF-523 LAR Incorporating Approved TSTF-425 LAR ML15084A0112015-03-23023 March 2015 St. Lucie, Unit 2 - Supplemental Information for Technical Specification Change and Exemption Request Regarding the Transitioning to Areva Fuel L-2015-091, St. Lucie, Unit 2 - Supplemental Information for Technical Specification Change and Exemption Request Regarding the Transitioning to Areva Fuel2015-03-23023 March 2015 St. Lucie, Unit 2 - Supplemental Information for Technical Specification Change and Exemption Request Regarding the Transitioning to Areva Fuel L-2015-030, Application for Technical Specifications Changes to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents2015-03-10010 March 2015 Application for Technical Specifications Changes to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents L-2014-230, License Amendment Request Application for Technical Specifications Change to Permanently Extend the Integrated Leak Rate Test (ILRT) Frequency to 15 Years2014-08-26026 August 2014 License Amendment Request Application for Technical Specifications Change to Permanently Extend the Integrated Leak Rate Test (ILRT) Frequency to 15 Years L-2014-205, Application for Technical Specification Change to Remove RCS Chemistry Requirements and Relocate to Licensee-Controlled Documents2014-08-0808 August 2014 Application for Technical Specification Change to Remove RCS Chemistry Requirements and Relocate to Licensee-Controlled Documents L-2014-160, Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6B & 6C, Using the Consolidated Line Item Improvement Process2014-08-0707 August 2014 Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6B & 6C, Using the Consolidated Line Item Improvement Process L-2014-124, Technical Specification Bases Control Program Periodic Report of Bases Change TS 6.8.4.j.42014-05-0707 May 2014 Technical Specification Bases Control Program Periodic Report of Bases Change TS 6.8.4.j.4 L-2013-233, Application for Technical Specification Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process2014-02-26026 February 2014 Application for Technical Specification Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process L-2014-015, Application for Technical Specification Change Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2014-02-20020 February 2014 Application for Technical Specification Change Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program L-2014-027, Fourth Ten-Year Inservice Inspection Interval License Amendment Request, Changes to Snubber Surveillance Requirements2014-01-30030 January 2014 Fourth Ten-Year Inservice Inspection Interval License Amendment Request, Changes to Snubber Surveillance Requirements L-2012-362, Technical Specification Bases Control Program, Periodic Report of Bases Changes TS 6.8.4.j.42012-10-0101 October 2012 Technical Specification Bases Control Program, Periodic Report of Bases Changes TS 6.8.4.j.4 L-2012-048, License Amendment Request, Station Battery Surveillance Requirement Changes2012-08-10010 August 2012 License Amendment Request, Station Battery Surveillance Requirement Changes L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages2011-02-25025 February 2011 St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 4; Technical Specifications Bases Markups2011-02-25025 February 2011 St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 4; Technical Specifications Bases Markups ML1107302982011-02-25025 February 2011 St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 4; Technical Specifications Bases Markups ML1107302842011-02-25025 February 2011 St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages ML1035604282010-12-15015 December 2010 St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 4; Technical Specifications Bases Markups L-2010-259, St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 4; Technical Specifications Bases Markups2010-12-15015 December 2010 St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 4; Technical Specifications Bases Markups ML1035604272010-12-15015 December 2010 St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages L-2010-259, St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages2010-12-15015 December 2010 St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages L-2010-078, Attachment 4, St. Lucie License Amendment Request Extended Power Uprate, Technical Specifications Bases Markups (for Information Only)2010-04-16016 April 2010 Attachment 4, St. Lucie License Amendment Request Extended Power Uprate, Technical Specifications Bases Markups (for Information Only) ML1011601922010-04-16016 April 2010 Attachment 4, St. Lucie License Amendment Request Extended Power Uprate, Technical Specifications Bases Markups (for Information Only) L-2009-099, Technical Specification Bases Control Program, Periodic Report of Bases Changes TS 6.8.4.j.42009-04-21021 April 2009 Technical Specification Bases Control Program, Periodic Report of Bases Changes TS 6.8.4.j.4 L-2008-120, Proposed License Amendments Diesel Fuel Oil Test Program TSTF-3742008-07-10010 July 2008 Proposed License Amendments Diesel Fuel Oil Test Program TSTF-374 L-2008-149, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42008-06-26026 June 2008 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2007-198, Proposed License Amendment Update PT Curve and LTOP for 55 EFPY2008-01-23023 January 2008 Proposed License Amendment Update PT Curve and LTOP for 55 EFPY L-2007-168, Technical Specifications Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42007-10-29029 October 2007 Technical Specifications Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 ML0729808602007-10-22022 October 2007 Tech Spec Pages for Amendments 202 and 149 Regarding Minor Changes and Corrections to the Technical Specifications L-2007-087, Proposed License Amendment, Alternative Source Term and Conforming Amendment2007-07-16016 July 2007 Proposed License Amendment, Alternative Source Term and Conforming Amendment L-2007-028, Proposed License Amendments, Removal of Hydrogen Recombiners and Analyzers from Technical Specifications2007-06-0404 June 2007 Proposed License Amendments, Removal of Hydrogen Recombiners and Analyzers from Technical Specifications 2024-05-17
[Table view] Category:Amendment
MONTHYEARML24135A0642024-05-17017 May 2024 Correction Letter - Amendment Nos. 253 and 208 Regarding Conversion to Improved Standard Technical Specifications L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2019-147, Exigent Technical Specification Amendment Request One-Time Allowed Outage Time Extension for Inoperable EDG2019-07-19019 July 2019 Exigent Technical Specification Amendment Request One-Time Allowed Outage Time Extension for Inoperable EDG L-2019-055, Stations - Supplement to Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications2019-03-26026 March 2019 Stations - Supplement to Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications L-2018-215, Resubmittal of Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2018-11-30030 November 2018 Resubmittal of Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML18096B4482018-04-0606 April 2018 Proposed Technical Specifications L-2016-227, License Amendment Request Change to P /T Limit Curve and LTOP Period of Applicability2016-12-22022 December 2016 License Amendment Request Change to P /T Limit Curve and LTOP Period of Applicability ML15280A3922015-10-19019 October 2015 Correction to Amendment Nos. 226 and 176 Change to Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program. L-2015-180, Proposed TS Changes for TSTF-523 LAR Incorporating Approved TSTF-425 LAR2015-06-30030 June 2015 Proposed TS Changes for TSTF-523 LAR Incorporating Approved TSTF-425 LAR ML15198A0302015-06-30030 June 2015 St. Lucie, Units 1 and 2 - Proposed TS Changes for TSTF-523 LAR Incorporating Approved TSTF-425 LAR L-2015-091, St. Lucie, Unit 2 - Supplemental Information for Technical Specification Change and Exemption Request Regarding the Transitioning to Areva Fuel2015-03-23023 March 2015 St. Lucie, Unit 2 - Supplemental Information for Technical Specification Change and Exemption Request Regarding the Transitioning to Areva Fuel ML15084A0112015-03-23023 March 2015 St. Lucie, Unit 2 - Supplemental Information for Technical Specification Change and Exemption Request Regarding the Transitioning to Areva Fuel L-2015-030, Application for Technical Specifications Changes to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents2015-03-10010 March 2015 Application for Technical Specifications Changes to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents L-2014-205, Application for Technical Specification Change to Remove RCS Chemistry Requirements and Relocate to Licensee-Controlled Documents2014-08-0808 August 2014 Application for Technical Specification Change to Remove RCS Chemistry Requirements and Relocate to Licensee-Controlled Documents L-2014-027, Fourth Ten-Year Inservice Inspection Interval License Amendment Request, Changes to Snubber Surveillance Requirements2014-01-30030 January 2014 Fourth Ten-Year Inservice Inspection Interval License Amendment Request, Changes to Snubber Surveillance Requirements L-2012-048, License Amendment Request, Station Battery Surveillance Requirement Changes2012-08-10010 August 2012 License Amendment Request, Station Battery Surveillance Requirement Changes L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages2011-02-25025 February 2011 St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages ML1107302842011-02-25025 February 2011 St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages L-2010-259, St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages2010-12-15015 December 2010 St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages ML1035604272010-12-15015 December 2010 St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages L-2008-120, Proposed License Amendments Diesel Fuel Oil Test Program TSTF-3742008-07-10010 July 2008 Proposed License Amendments Diesel Fuel Oil Test Program TSTF-374 L-2007-198, Proposed License Amendment Update PT Curve and LTOP for 55 EFPY2008-01-23023 January 2008 Proposed License Amendment Update PT Curve and LTOP for 55 EFPY ML0729808602007-10-22022 October 2007 Tech Spec Pages for Amendments 202 and 149 Regarding Minor Changes and Corrections to the Technical Specifications L-2007-028, Proposed License Amendments, Removal of Hydrogen Recombiners and Analyzers from Technical Specifications2007-06-0404 June 2007 Proposed License Amendments, Removal of Hydrogen Recombiners and Analyzers from Technical Specifications L-2006-094, Proposed License Amendment Steam Generator Tube Integrity Pursuant to 10 CFR 50.902006-05-25025 May 2006 Proposed License Amendment Steam Generator Tube Integrity Pursuant to 10 CFR 50.90 ML0535703302005-12-23023 December 2005 Tech Spec Pages for Amendment 140 One-Time Type a Test Interval Extension L-2005-029, Proposed License Amendment Containment Leakage Rate Program One-Time Type a Test Interval Extension2005-03-31031 March 2005 Proposed License Amendment Containment Leakage Rate Program One-Time Type a Test Interval Extension L-2004-244, Proposed License Amendment Extension of the Reactor Coolant System Pressure/Temperature Curve Limits and LTOP to 35 EFPY2004-12-20020 December 2004 Proposed License Amendment Extension of the Reactor Coolant System Pressure/Temperature Curve Limits and LTOP to 35 EFPY L-2004-091, Proposed License Amendments Supplement 1 - Request for Additional Information Response Elimination of RPS, Afas and ESFAS Pressure Sensor Response Time Testing Requirements2004-05-18018 May 2004 Proposed License Amendments Supplement 1 - Request for Additional Information Response Elimination of RPS, Afas and ESFAS Pressure Sensor Response Time Testing Requirements ML0407603452004-03-11011 March 2004 Technical Specification Amendment 133 ML0407603392004-03-11011 March 2004 Technical Specification Amendment 189 L-2003-276, Proposed License Amendment, WCAP-9272 Reload Methodology and Implementing 30% Steam Generator Tube Plugging Limit2003-12-0202 December 2003 Proposed License Amendment, WCAP-9272 Reload Methodology and Implementing 30% Steam Generator Tube Plugging Limit L-2003-265, Proposed License Amendments Regarding Elimination of RPS, Afas, and ESFAS Pressure Sensor Response Time Testing Requirements2003-11-21021 November 2003 Proposed License Amendments Regarding Elimination of RPS, Afas, and ESFAS Pressure Sensor Response Time Testing Requirements L-2003-217, Proposed License Amendments Relocation of Pump Technical Specification Surveillance Requirements2003-10-29029 October 2003 Proposed License Amendments Relocation of Pump Technical Specification Surveillance Requirements L-2003-224, Proposed License Amendments Regarding Alternate Source Term and Conforming Amendments2003-09-18018 September 2003 Proposed License Amendments Regarding Alternate Source Term and Conforming Amendments L-2003-136, Application for Amendment to License NPF-16, by Incorporating Technical Specification Revision2003-05-22022 May 2003 Application for Amendment to License NPF-16, by Incorporating Technical Specification Revision L-2002-113, Proposed License Amendments, Engineered Safety Features Actuation Signal (ESFAS) Trip/Bypass Single Failure Vulnerabilities2002-07-18018 July 2002 Proposed License Amendments, Engineered Safety Features Actuation Signal (ESFAS) Trip/Bypass Single Failure Vulnerabilities ML0215505292002-05-30030 May 2002 Tech Spec Pages for Amd Nos. 182 and 125 Relief Value Allowed Outage Time L-2002-003, Proposed Amendments Regarding Relocation of Specific Working Hour Limits and Controls2002-01-18018 January 2002 Proposed Amendments Regarding Relocation of Specific Working Hour Limits and Controls L-76-191, Proposed Amendment to Facility Operating License DPR-67. Proposed Deletion of Applicability of Specification 3.2.3 to Mode 21978-05-11011 May 1978 Proposed Amendment to Facility Operating License DPR-67. Proposed Deletion of Applicability of Specification 3.2.3 to Mode 2 L-78-129, Application for Proposed Amendment to License No. DPR-067. Proposed Change Concerns Operability and Surveillance of Subject Facility Overpressure Mitigating System1978-04-13013 April 1978 Application for Proposed Amendment to License No. DPR-067. Proposed Change Concerns Operability and Surveillance of Subject Facility Overpressure Mitigating System ML18088B2741978-04-12012 April 1978 License No. DPR-67 Application for Amendment: Appendix a Technical Specification Proposed Change Concerning Deleting Requirements for Part Length Control Element Assemblies from Unit 1 Technical Specifications L-78-121, License No. DPR-67 Application for Amendment: Appendix a Technical Specification Proposed Change Concerning Supporting Operation of the Containment Spray Additive System Scheduled to Be Installed at Facility1978-04-0505 April 1978 License No. DPR-67 Application for Amendment: Appendix a Technical Specification Proposed Change Concerning Supporting Operation of the Containment Spray Additive System Scheduled to Be Installed at Facility L-78-119, Application for Proposed Amendment to License No. DPR-067. Proposed Change Concerns Revision to Surveillance Requirement 4.6.6.1.A to Include Testing of Sbvs Auxiliary Heaters1978-04-0404 April 1978 Application for Proposed Amendment to License No. DPR-067. Proposed Change Concerns Revision to Surveillance Requirement 4.6.6.1.A to Include Testing of Sbvs Auxiliary Heaters L-78-110, License No. DPR-67 Application for Amendment: Appendix a Technical Specification Proposed Change Concerning Revision to Specification on Decay Time for Fuel Assemblies Stored in Modules Nearest the Fuel Cask Compartment1978-04-0404 April 1978 License No. DPR-67 Application for Amendment: Appendix a Technical Specification Proposed Change Concerning Revision to Specification on Decay Time for Fuel Assemblies Stored in Modules Nearest the Fuel Cask Compartment ML18088B2641978-03-20020 March 1978 Proposed Amendment for Operating License DPR-67 to Support the Replacement of Selected Safety-Related Hydraulic During Upcoming Refueling Outage ML18088B2851978-01-0404 January 1978 Proposed Amendment to Facility Operating License No. DPR-67. Proposed Change Concerns Repositioning Cea'S About Three Inches Different from Their Present Position to Minimize Potential Guide Tube Wear at Single Location L-77-386, Proposed Amendment to Facility Operating License No. DPR-67. Technical Specifications Proposed Change Concerning Modification of Incore Monitoring Alarm Setpoints & Excore Monitoring Power Scaling Factor to Be More Conservative1977-12-19019 December 1977 Proposed Amendment to Facility Operating License No. DPR-67. Technical Specifications Proposed Change Concerning Modification of Incore Monitoring Alarm Setpoints & Excore Monitoring Power Scaling Factor to Be More Conservative L-77-339, Proposed Amendment to Facility Operating License No. DPR-67. Proposed Change Concerns Deletion of the Requirement for Annual Operating Report1977-11-0101 November 1977 Proposed Amendment to Facility Operating License No. DPR-67. Proposed Change Concerns Deletion of the Requirement for Annual Operating Report ML18088B3051977-09-16016 September 1977 Attachment C to L-77-291 Proposed Technical Specification Changes 2024-05-17
[Table view] |
Text
C.
~ f ATTACHlIJlENT C TO L-77-293.
PROPOSED. TECHNICAL SPECIFE CATION CHANGES
APP.LICABILITY SURVEILLANCE RKgUIRBlENTS (Continued):
a A total'aximum combined. interval time. for any 3 consecutive sumeil1ance intervals not. ta- exceed: 3 25 timm tha specified
'urveillance. interval 4.0.3 Performance of- a Survei1lance Requirement mthin the speci'i.i'ime interva1 shall- constitute compliance with OPERABILITY reqmrements for a Limiting Condition for Operation and associat d ACYXQH st~Gments unless otherwise required by the specification..
4.Q.4 Entry. into. an OPERATIONAL YiOGE or other specified'pplicabHity condition'shall not be made unless the Surveillance Requirement(s) as'ther's'tise:
associated with the Limiting Condition for Operation have been perTormed within the stated. survei11ance interval or specified 4.0.5 SurveiLlance Requirements for in-service inspection and, testing of Class 1, 2 and, 3 components shall be applicable as follows:.
ASME'ode ae Xn-service inspe'ction of ASME Code Class 1,, 2 and. 3 components and in-service testing of ASME Code Class 1, 2 and 3 pumps and valves shall be performed in'ccordance with Section ZX of the ASME Boiler and Pressure. Vessel Code and: applicable-. Addenda as required'y. 10 CPR 50, Section 50.55a(g), except where specific written relief has been. granted.,
by the Commissioxr purSuant to 10 CPR 50, Section 50.55a(g) (6).(i) Xn cases where during the process. of inspection and testing, certain re-quirements, are- found to be impractical', due to unforeseen. circumstances relief may be"'requested: at, that: time- and, satisfaction of these be deferred'. pending: NRC'. action upon that request
.'require-'ents'ay.
b Surveillance intervals: specified: in Section XX of the- ASME Boiler and'-
,Pressure Vessel Code and applicable. Addenda. for the in-sezvice inspection and. testing; activities: required by. the ASME Boiler and: Pressure.Vessel Code and applicable Addenda shall be applicable as follows in these-TechnicaL Specifications:
ASME Boiler and Pressure Vessel Code and applicable Addenda terminology Required frequencies for perform-for. in-service- inspection and ing in-service inspection and testin criteria testin activities Test Period:
l.. Refueling Shutdown A scheduled shutdown (with reactor .,
head off) with reactor maintained in
- MODE 6 for at least 72,hours.
- 2. Cold Shutdown A scheduled shutdown with reactor main tained in*MODE 5 for at least 168 hour0.00194 days <br />0.0467 hours <br />2.777778e-4 weeks <br />6.3924e-5 months <br />
- 3. Operation 3 Months or less to Code.
- Table 1.1, Operational .Modes ST. LUCIE - UNIT l 3(4 0-2 9/16/77
APPLICABILITY SURYEILLANCE REgUIRB'lEHTS (Continued)'SME Boiler and. Pressure Vessel Code; Required frequencies for perform-and applicable Addenda terminology. for ing in-service inspection and.
-service inspection and testing criteria testin activities Monthly At least once per 3X days 3 Months At least once pe'r: 92-days YearIy or -Annually
- At least once per 366 days-Performance of the above. in-service inspection and testing activities shall be
- in addition to other specified Surveillance Requirements. The provisions of Specification 4.0.2 are applicable to surveillance intervals- associated with in-service inspection and testing activities required by Section ZZ of the above ASME Boiler and Pressure Vessel'Code and applicable Addenda.
L v
ST. LUCIS - UNIT 1 3/4 0-3 9/l6/77
REACTOR COOLANT'YSTEN.
SKEEVCViKVES - SHtJTQOMN
. LIMITING CONDITION FOR. OPERATION 3.4.2' minimum of one. pressurizer code safety valve shall be OPERABLE.
with a. lift setting of 2500 PSIA + lX.
APPLICABILITY: NOGES 4- and 5.
ACTION.
with no pressurizer code safety valve OPERABLE,. inanediataly suspend all operations. involving. positive reactivity changes and.'lace- an OPERABLE-.
shutdown cooling loop. into. operation; SURVEILLANCE REgtJIRPitENTS'-
~*
~ j t'A 2'o: additionaL Surveill'ance; Recpxirementa other than those- recpu.reef by Specification 4.0 5-ST. LUCIE - UNIT l 3(4 4-2 9/16/77
REACTOR COOLANT SYSTEM'.4'.10'TRUCTURAL INTEGRITY" .
ASME CODE CLASS le 2'ND 3'OMPONENTS LIMITING'ONOITIONFOR'PERATION:
3.4.10.1 The structural integrity of ASMS Code Class 1 .2 and-.3,components--
(except Steam generator Tubes) shall be maintained in accordance with Specidica- ';
tion 4.4.10.1.
APPI ICABILITY: IDES 1', 2, 3 g 4 ACTION a Mitk the structural'ntegrity of any ASME Code Class.l com-ponent(s) not. conforming, to the above requirements, restore.
',,
~
the structural integrity of the affected component(s) to within'ts,limit or isolate the affected component(s) prior the Reactor Coolant: System temperature mora to'ncreasing~
above the minimum temperature required. by NDT considerati'ons than'0.'F
- b. With. the structural integrity, of any. ASHE Code. CTass 2'om- .
ponent(s) not: conforming, to the;-above requirements,. restore
"
.the structural: integrity of'he affected component's) toi within", its; Timit. or isoIate the affected .component[d)'ninm to R~reasing; the: Reactor. Coo Tant. System teepe~z~abuV c' Mftk the. structural, integrity of any ASME Code CVass 3',com-not conforming. to. the above requirements.restore
.'he structuraI1'.
-'onent(s).
integrity of the affected! component to within
'ilats limit: or- isolate. the affected:. component from: service d' The provisions'f Specification- 3'.0.4 are not.applicable.
'
SURYEILLANCE RE UIREMENTS 4- >>-1'o additional Surveillance Requirements other than those
'required by Specification 4.0.5.
ST LUCZE UNIT 1 3/4 4-26 9/16/77
1 P, t
r I',
E p ~ ~ C
~ 4
~ PAGES 3/4 4-27'O '3/4 4-55. lNTENTlONALLYLEFT BLANC.
hi ~
~
'l ~
'V
~r ~
9/16/77
BlERGBlCY CORF CQQUifG SYSTEM'.S, REQUBB~ 'tTS (Continued)
'UR'lEILLNCK a
e At Yeast one per 18 umnths:, Bunny shuts:~n by-J' W~ ~
'er i7ying the~ each Signai) I autoaiitic valve ia. the Ao~s path ac~<z-
~O
.
0 ates to its carrec< position oa a Qfebj Xnjectioa Actuation Verifying: that each of the foklosting pumps stazh aut~a<feaI- P..
)J upoa receipt of a Safe"y Enaction, Aciuaiion'ignal..
a Hig1r-Pressure 5'a< tg Tnjec ice puma.
b .. Lm-Pressure Sa7e~y. ZnjeM~Qn- gts~ip 0 k
. $i'18/7 >
Np additiona1. Surveillance Requirements, other, than ariose:
required: bj
- ,Specifica&on. 4.0;5 g C
~ ~
h I
Oa ~
~
~ ~
r~
ST. LUCIi - Ui(IT Y 9/16/77
COh tAiflitBITSYSTB45 SUV.~L ~~C=- R~qUIRm=~@AS. (Can~inued)
P 4
Yerlfying 'tha~.upon; a recircuZa~fae actva~iom, sfgnaT'
.. the cantainaren~. sump, isolation va'ives opea ar4 4ha4 a.
' . l ecircuTa~ion mech fZaw path via- arl GPE<.BKZ she 8o~-
cooling hea exchanger is. esta&liah cf,.'mick.
0
~ .: 2.; Verifying that each va)ve (manual power opera~ed ov .-.'.;
in the vGow path is poli ioned to take ""'utomatic),
suction signckl s Tl'Gs
. ~
... - -:,"-
die RMT On'L Cantairmenh Pressur --Hiah-Bigs
. ~ .(
'
b., A~ Zeal once per 28'months;. during sk<dawrr, by='
~ ~ 0 ~ <<& & ~'
0 ~
~ ~ o. e oe mo eoeo 0 0 ~ ~
Verifgi'ng thaC even; aut~itic; viva $ n ~ie rD'aw perh, ."
actuates;ta: im carr.'ect: posi>>iaa aa a. Caa~~irm~~C Pressura-Hfgk-High sfgna7.
2* Verifying tIra>> each: spray puap s~artc. au.~~ Pcs Iy. om- .-
a Contairwez~ Prmsur =Rigk-Hzgk sxgrraT
)
,'.c, Vms>> onc pm. 8 @care by perRm~ng am afv. or +~.aR .CTow 3/l8/>
.
" A>>
test through each spray h~~dee anC vervryiag, e ch spray r0~7e...
ws unobs~~c+wcE d'. '. No a@Xi.tion'a1 Suxveil.lance" Recgxixements othe+ than those x'ecpiired-by
.. 'Speci%.cation 4.0.5."
0 ST. LUCRE - U)ll7 l, 3(4 6-lo 9/16/77
4 l r ~ ~
~ ~ ~ ~ ~ ~
~ I ~ ~ I
~ ~
~ ~
~ ~ ~ I I
~ l ~
I ~
l s
~ ~ ~
~ ~ ~ ~
~ ~ ~ I ~ ~
~ ~ ~ ~ ~
CONTAINNEHT SYSTEMS SURVEILLANCE RE UIREt'tEHTS Continued 4.6.3.1.2. Each iso1ation va1ve specified in Table 3.6-2shalj be demonstrated OPERABLE during the COLD SHUTOOMN'r Rc.FUECIliG tiODE at least once per 18 months. by:verifying that oa a containment isolation test signaT; each isolation vaTve actuates to its isolation position
,3/lS 4.6.3'.X 3 No additional surveillance re~irements other than those required'.
y Specification 4 0.5 ST. LUCIE - UNIT 1 3/4 6-19 9/16/77
PLANT SYSTB/S
\
SUR>IEILLAHCE RE UIRBt HTS (Continued 3/18/77 b No adcLLtional surveillance. requirements other than those required by Specie.cation. 4;.Q' I'
~
0 h
ST. LUCIE - UilIT -l 9/16/77
PLANT SYSTEi~lS SStV-"B:HHGE-RE U IREHENTS Continued f
P f b.. At 7'east once per. 18'months during; shutdownby:
each automati'c: va1:ve.servicing:
W ~
verifying." that '. ','
safety'elated." equipment actuates-to its, correct position'on a Safety Injection Actuation Signal'
. 3jl 4
C>> No: a'dditiona3'urveillance. requirements other than those: recgxired,'- by:
Specificatiom 4.0.$ f f f
~ '
~
e
~, f, e
e 1
~ t ~ I
'a h}
ST. LUCIE - UNIT 1
-9/16/77' f
~ ~ 4~ ~
PLANT SYSTEM/S.
I
. SUR>IEILLAHCE RE UIRBl NTS'ontinued) 1 h ~ w
~ - ~ .i r " r.
At least once- per, T8'months, during- shutdown',, by verifying-. that-. =---
each'utomatic vaTve servicing safety re%ated equipment-.actuates, to its. correct position; on a. Safety Injection- Actuation Signal'..:
h 4
h
-',;3/18/77
, '.
- c. No additiona1'uareillance hy Specification, 4'.0.5.
recpxixements other than. those'equireC: "-
r
~ '
t-t
'
,
I!
'
F
, ~
~' I A
ST.,LUCIE - UNIT.1 3/4 7-17'/16/77
APPt; EBB ILLY' 0
ps BASES 4-0-5 This specification ensures that. i an~+~s and, valves and'n-service inspection: o
-se~ce test
',and. 3- Components wiLL'e performeck in accordance with a periodically updated
'version of Section ZX of the ASME'oiler and Pressure Vessel Code and Addenda.
Ias required by: LO 'CZR"50.55a. Relief from any of the above requirements;-has been provided in writing. by the Commission. and is not a part; of these-technical.
/
specifications This specification. includes a clarification ojtbe+rectuencies .for perforanng.tbe in-service testing activities required 'by. Section xz. of 'the ASME. Boiler.and Pressure VesseL Code and applicable Addenda. This clarifi;ca-,
'tion is provided. to ensure consistency in surveiLLance-intervals throughout
- these technical specifications and to remove any- ambiguities relative to
-the frequencies- for performing, the required: in-.service testing ac;tivities
~ I I v
r c
r ~
I I
I I P
~ '
t IP ~
I I ~ ~
1 I
~ ~
3r ~
F Ia ~
I 1
I F
- 8 3l4'-3 9/L6/77 I
ST. LUCIE UNIT 1
REACTOR COOLANT SYSTEM:
BASES Ar piping pumps and, valves Bein> this. ~~eratire, the system'r essure =
mush be limited; to a, maximum of.'0~ of the: system'a hjdroataHc test pl'essure oF 3T25 ps'he number of reactor vessel irradiation surveillance specimens and.
the frequencies for removing and testing these specimens are provided.-.in,
'able 4.4-5 to assure comp1iance anth the requirements ~f Appendix H to 10 CFR. Part 50 The l,imitations imposed on the piessurizer heatup and coo1down rates and spray eater temperature differential are provided to assure that the pressurizer is, operated vtithin the design criteria. assumed for the fati-gue analysis perforn'od. in. accordance <vith the AQlE Code requirements.
I 3/4.4.10 STRUCTUPAL [iHTEGRIiY The inspection programs. for the ASME Code Class 1, 2 and 3 components'nsure that the structural integrity of these components will be maintained: at. an acceptable level. throughout. the. life of the plant To the extent. applicable the inspection; program for these.. is:
'in complxance with; Section ZL of'he ASME Boiler and'ressurecomponents.
,
Vesse1 Code ST. LUCIE - UNIT 1 8 3/4 4-12 9/16/77
1 I I
'E'ACTOR'OOLANT SYSTEM
) 3'/4A'T CORE. O'ARREL"'~(OVEHEii7 I
r.
This specMicition:Vs pravSdedl te ensure ea're detec ion: oi. excessive
<
core BarrH movement M ft
'tected by using;- four excare neutron shauT'c5 occur,. Care barreT: rmvement v~A7 b~
detectors. m abta=.n; A~pTitude.
. I'rababiTity. Gistributfan. (APOI ant SpeciaT Analyst $ SA) BaseTine
'.
core bar rel'averent ATert L'eveT's and.'ction. L'ereTs at nominaT <NERVAL 0!lER. level:s or 20 50,. 80" and'l.00f of RATED THEPJNL PO'rlER viiTl be
- determined'uringi the reactor startup test prague
~ -'
A'odi Ticatian-an anaTysis of the tldata obtained, the:- required'onitoring: program; and'by an:
may. be:
ex~vination of the. affected justified'by, parts during;- the plant: shutdown at the end; of the furs~ ueT cycTe T. LUCRE - VNET 1' 3/4'-13 9/16/77