Security Plan Changes, Revision 16
ML15182A236
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 06/24/2015
From: Wamser C
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BVY 15-042
Download: ML15182A236 (2)


Text

SAFEGUARDS INFORMATION Entergy Nuclear Operations, Inc.

Vermont Yankee 320 Governor Hunt Road

%-=r-wEnteW Vernon, Vermont 05354 Tel: (802) 257-7711 Christopher J. Wamser Christopher J. Wamnser Site Vice President 10 CFR 50.54(p)(2)

BVY 15-042 June 24, 2015 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Security Plan Changes Vermont Yankee Nuclear Power Station Docket No. 50-271 License No. DPR-28

REFERENCE:

1. Letter, Entergy Nuclear Operations, Inc' to USNRC, "Security Plan Changes," BVY 15-021, dated April 1, 2015

Dear Sir or Madam:

r On June 16 and 17, 2015, NRC Staff conducted an onsite regulatory review of Revision 15 of the Physical Security Plan (PSP) changes submitted in Reference 1 pursuant to 10 CFR 50.54(p)(2). Consequently, pursuant to 10 CFR 50.54(p)(2), Entergy Nuclear Operations, Inc..

(Entergy) is submitting changes to our previous submittal (Reference 1).

During the Staff's review, inconsistencies in the PSP changes and the supporting documentation including the Defensive Strategy Plan (DSP) and the associated Force-on-Force drills were identified. The changes in this submittal correct the inconsistencies and align the PSP with the supporting documentation. Corresponding changes to the NEI 11-08 evaluation previously submitted in Reference 1 are also provided.

Attachment 1 is a summary of the changes to the PSP and the NEI 11-08 evaluation.

Attachment 2 is Revision 16 of the PSP and Attachment 3 provides the replacement pages for the NEI 11-08 Evaluation. y )

SAFEGUARDS INFORMATION Attachments 1, 2 and 3 contains Safeguards Information. When separated from these attachments this letter is considered decontrolled and available for public disclosure.

BVY 1 5-021 / Page 2 of 2 SAFEGUARDS INFORMATION

- As stated in Reference 1, VY continues to conclude that the changes do not reduce the effectiveness of the Security Plan, nor do they decrease the ability of the onsite physical protection system and security organization to protect the spent fuel with high assurance against the Design Basis Threat (DBT) of radiological sabotage. As such, thechanges were appropriately implemented under 10 CFR 50.54(p)(2).

Should you have any questions concerning this letter, or require additional information, please contact Mr. Patrick Ryan at (802) 258-5838.

I declare under penalty'of perjury that the foregoing is true and correct.

Executed on June 24, 2015.

Sincerely.

CJW/KWK Attachments (3)

1. Summary of Physical Security Plan and NEI 11-08 Evaluation Changes (SGI)
2. Physical Security Plan, Revision 16 (SGI)
3. Replacement Pages for NEI 11-08 Evaluation (SGI) cc: Mr. Daniel H. Dorman Regional Administrator, Region 1

,U. S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Mr. James S. Kim, Project Manager (w/o Attachments)

U. S. Nuclear Regulatory Commission OWFN - Mail Stop 08D15 11555 Rockville Pike Rockville, MD 20852-2746 Mr. Christopher Recchia, Commissioner (w/o Attachments)

Vermont Department of Public Service 112 State Street - Drawer 20 Montpelier, Vermont 05602-2601 SAFEGUARDS INFORMATION Attachments 1, 2 and 3 contains Safeguards Information. When separated from these attachments this letter is considered decontrolled and available for public disclosure.